HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0190.2019 (14).ARBK106462#
City of Aspen Version 11.3 Updated December 13, 2017
PROJECT ADDRESS:546 MCSKIMMING ROAD ASPEN CO 81611
Parcel ID #: 273718102002 Permit Number:
Collector
Aspect,
Degress from
True South
Collector Tilt,
Degrees From
Horizontal
Solar
Orientation
Adjustment
Factor
DC side
capacity (kW)
Inverter capacity
(kW)
kW for
credit
kW Mitigation
Credit
Collector Group 1 48 12 91.00%13.53 13.12 13.12 11.94 kW
Collector Group 2 128 12 79.95%1.65 1.6 1.6 1.28 kW
Collector Group 3 87.00%0 0.00 kW
Collector Group 4 87.00%0 0.00 kW
Collector Group 5 87.00%0 0.00 kW
Collector Group 6 87.00%0 0.00 kW
Collector Group 7 87.00%0 0.00 kW
Collector Group 8 87.00%0 0.00 kW
Collector Group 9 87.00%0 0.00 kW
Collector Group 10 87.00%0 0.00 kW
Collector Group 11 87.00%0 0.00 kW
Collector Group 12 87.00%0 0.00 kW
Collector Group 13 87.00%0 0.00 kW
Collector Group 14 87.00%0 0.00 kW
Collector Group 15 87.00%0 0.00 kW
Collector Group 16 87.00%0 0.00 kW
Collector Group 17 87.00%0 0.00 kW
Collector Group 18 87.00%0 0.00 kW
Collector Group 19 87.00%0 0.00 kW
Collector Group 20 87.00%0 0.00 kW
Total:13.22 kW
$ Mitigation Credit:($90,748.85)
Instructions:
1)Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily,
you might have just one group.
2)Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
3)DC side capacity is the total labled panel output kW in a group.
4)Inverter capacity is the recommended input power in kW of your inverter(s).
5)You will be given credit for the lesser of the labeled panel output or the inverter.
6)The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7)The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
8)The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP
and CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
PREPARED BY:Date:25-Sep-19
Print Name:Green Electrical Solutions / JAY BURE
Signature:
Phone & EMail:970.927.8658 JAY@GREENELECTRICAL.SOLUTIONS
REVIEWED:Date:25-Sep-19
10/01/2019
0190.2019.ARBK
10/02/2019
tonyf