HomeMy WebLinkAboutFile Documents.534 E Cooper Ave.0003.2017 (4).ACBKRADIANT FLOOR SUPPLYRADIANT FLOOR RETURNNOTE: ALL SYMBOLS SHOWN ON LEGENDARE NOT NECESSARILY USED.CHILLED WATER RETURNCHILLED WATER SUPPLYHEATING WATER RETURNHEATING WATER SUPPLYMECHANICAL LEGENDMEDIUM PRESSURE NATURAL GASSNOWMELT RETURNSNOWMELT SUPPLYGASHWSTABHWRCWSCWRSMSSMRRFSRFRGMPGPIPE RISERPIPE DROPPIPE TAKEOFF (FROM BOTTOM OF MAIN)PIPE TAKEOFF (FROM TOP OF MAIN)PIP END CAPPIPE CONTINUATIONPIPE EXPANSION GUIDEPIPE UNIONPIPE ANCHORFLEXIBLE PIPE CONNECTIONPIPE EXPANSION JOINTPOINT OF NEW CONNECTIONAIR VENTPLUG VALVECHECK VALVEBALL VALVEBALANCING VALVEBUTTERFLY VALVEPRESSURE REDUCING VALVESTRAINERPRESSURE - TEMP. TAPPRESSURE GAUGE2-WAY CONTROL VALVE3-WAY CONTROL VALVESUPPLY GRILLERETURN GRILLEEXHAUST AIRSUPPLY AIRRETURN AIROUTDOOR AIRSUPPLY AIR DAMPERRETURN AIR DAMPERSUPPLY DIFFUSEROARASAEARADSADSGRGSDRETURN DIFFUSERRDTRANSFER GRILLETGTRANSFER DIFFUSERTDTHERMOSTATFIRE/SMOKE DAMPERFIRE DAMPERMOTOR OPERATED DAMPER (MOD)MANUAL BALANCING DAMPERTURNING VANES IN 90° ELBOW??x??DUCT SIZES ARE NET FREE AREA1ST NO. IS DUCT WIDTH.2ND NO. IS DUCT DEPTH.SECTION THRU SUPPLY AIR DUCTSECTION THRU RETURN/EXHAUST AIR DUCTSUPPLY DUCT TURN DOWNRETURN/EXHAUST DUCT TURN DOWNCHANGE OF ELEVATIONFLEXIBLE DUCT CONNECTIONR/D(D) DROP (R) RISESENSOR (CALL OUT ON DRAWINGS)SUPPLY REGISTER/DIFFUSER/LOUVERNECK SIZECFM-SRETURN REGISTER/DIFFUSER/LOUVERNECK SIZECFM-ROUTSIDE AIR REGISTER/DIFFUSER/LOUVERNECK SIZECFM-O.A.EXHAUST REGISTER/DIFFUSER/LOUVERNECK SIZECFM-EUDOOR UNDERCUT CFM(A) SECTION CUT LINE(B) SHEET SHOWN ONSSECTION THRU ROUND DUCTROUND DUCT TURN DOWN4-WAY CONTROL VALVEFLOW REGULATOR VALVEDIFFERENTIAL BYPASS VALVENATURAL GAS PRESSURE REGULATORTHERMOMETERM MECHANICAL SPECIFICATIONS:1.GENERAL:a.FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIESNECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTEDON THE DRAWINGS AND/OR SPECIFIED HEREIN.b.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE ACOMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESESPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARYTO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARESPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYINGDRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.2.WORKMANSHIP:a.THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNERSATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.3.MATERIALS:a.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVEKIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.4.SITE INSPECTION:a.CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID ANDTHOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACTNATURE OF THE WORK.b.SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING ACOMPLETE AND FUNCTIONAL SYSTEM.c.NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRAFUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKETHE EXAMINATION.5.CODES AND PERMITS:a.ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2015INTERNATIONAL MECHANICAL CODE (IMC), 2015 INTERNATIONAL ENERGYCONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE CITY OFASPEN BUILDING DEPARTMENT.b.CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.c.COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THEARCHITECT.6.AS-BUILTS:a.CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALLCHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TOFINAL ACCEPTANCE AND PAYMENT.7.GUARANTEE:a.CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ONALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OFONE YEAR AFTER COMPLETION.8.SUBMITTALS:a.CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALLOPTIONS CLEARLY MARKED) SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW(SIX COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED. PERFORMANCESELECTIONS REQUIRED FOR BOILERS, HEAT EXCHANGERS, AND PUMPS.9.COORDINATION:a.THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.b.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDEBEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.10.CUTTING AND PATCHING:a.ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING)SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.b.PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.c.X-RAY SLABS PRIOR TO CORING.11.CLEANUP:a.UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALLREMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THISWORK AND LEAVE THE PREMISES CLEAN AND ORDERLY.12.MECHANICAL IDENTIFICATIONa.EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FORPERMANENT ATTACHMENT ON EQUIPMENT.b.PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE,AND SHOWING DIRECTION OF FLOW.c.VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEMABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLEFOR FASTENER.d.VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THEMAINTENANCE ENGINEER FOR RECORD.13.DUCTWORK:a.DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2015IMC AND SMACNA STANDARDS.b.DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS.DUCTWORK SIZES INDICATED ARE INSIDE TO INSIDE (OUTSIDE TO OUTSIDE)DIMENSIONS.c.ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVEWITH VERSA GRIP OR MESH.d.ALL FINAL CONNECTIONS TO SUPPLY GRILLES SHALL BE COMPLETED WITHACOUSTICAL FLEXIBLE DUCT UNLESS OTHERWISE NOTED ON THE PLANS. MINIMUMLENGTH IS 3', MAXIMUM LENGTH IS 5'.e.FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED, VINYL COATED,WIRE REINFORCED FIBERGLASS, WITH MAXIMUM THERMAL CONDUCTIVITY OF 0.30BTU-IN/HR-FT2-°F AND A MAXIMUM LENGTH OF FIVE FEET.f.DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSUREDROP PER 100 FEET.g.EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BEEQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, ANDBACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN SHUTDOWN SHALL BEPROVIDED FOR AIR INTAKES AND/OR DISCHARGES.h.CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATIONi.DOUBLE THICKNESS TURNING VANES SHALL BE USED ON ALL DUCT TURNS OF 90°.14.HEATING PIPING:a.HEATING HOT WATER PIPING 2½” INCHES AND BELOW SHALL BE TYPE "L" COPPER,HARD DRAWN, WITH WROUGHT COPPER SWEAT FITTINGS. JOINTS SHALL BESOLDERED WITH 95-5 OR SILVER SOLDER. CONDENSER WATER AND HEATING HOTWATER PIPING 3" AND ABOVE SHALL BE SCHEDULE 40 BLACK STEEL A-53 SEAMLESSPIPE WITH WELDED FITTINGS.b.VALVES SHALL BE DANFOSS OR EQUAL; SERVICE PRESSURE SHALL BE AS REQUIRED.VALVES SHALL BE SUITABLE FOR SERVICE INTENDED. PROVIDE PRESSUREINDEPENDENT CONTROL VALVE MODELS FOR ALL VARIABLE SPEED SYSTEMS UNLESSNOTED OTHERWISE.c.PROVIDE HANGERS, SUPPORTS AND INSULATION SADDLES AS REQUIRED AND PERANSI REQUIREMENTS. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.a.PIPING SHALL BE SIZED AT A MAXIMUM PRESSURE DROP OF 3.5 FT PER 100 FEET & 4FEET/SEC VELOCITY. UNLESS OTHERWISE NOTED, ALL PIPING SHOWN ON PLANS HASBEEN SIZED FOR COPPER. PROVIDE DEDUCT ALTERNATE PRICING FOR PEX & UPSIZEONE NOMINAL SIZE.b.CONTROL VALVE Cv RATINGS SHALL BE SELECTED AT A MAXIMUM PRESSUREDIFFERENTIAL ACROSS THE VALVE OF 2 PSI.c.PROVIDE 3” DIA. x 24" L SCHEDULE 40 PVC INLINE FILTER FILLED WITH LIMESTONEAGGREGATE TO NEUTRALIZE THE BOILER'S CONDENSATE DRAIN.d.PROVIDE EXPANSION JOINTS OR LOOPS ON ALL HEATING WATER PIPING RUNS INEXCESS OF 50'.15.DUCTWORK INSULATION:a.ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PERSECTION 604 OF THE 2015 IMC.b.INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOTMORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 50, PER THE 2015 IMC.INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS.c.RECTANGULAR SUPPLY, RETURN & TRANSFER DUCTWORK SHALL BE INTERNALLYLINED WITH A VAPOR RESISTANT DUCT LINER OF THICKNESSES SPECIFIED BELOW.d.CONCEALED ROUND, CONCEALED OVAL & OUTDOOR AIR DUCTS SHALL BEEXTERNALLY WRAPPED WITH FIBERGLASS INSULATION WITH AN EXTERNAL VAPORBARRIER. REQUIRED R-VALUES ARE SPECIFIED BELOW.e.ALL SUPPLY, RETURN & TRANSFER DUCTWORK LOCATED WITHIN THE BUILDINGENVELOPE SHALL BE INSULATED TO A MINIMUM OF R-4 (1” LINER) UNLESS SPECIFIEDOTHERWISE ON THE PLANS.f.ALL SUPPLY & RETURN DUCTWORK SHALL BE INSULATED TO A MINIMUM OF R-6 (1.5”LINER) WHEN LOCATED IN UNCONDITIONED SPACES AND SHALL BE INSULATED TO AMINIMUM OF R-8 (2” LINER) AND WEATHERPROOFED WHEN LOCATED OUTSIDE THEBUILDING.g.ALL OUTDOOR AIR DUCTS SHALL BE INSULATED TO A MINIMUM OF R-12 WITH A VAPORBARRIER.16.PIPING INSULATION:a.ALL HYDRONIC PIPING SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTSPER SECTION 1204 OF THE 2015 IMC.b.ALL EXPOSED PIPING SHALL UTILIZE FIBERGLASS INSULATION WITH VAPOR BARRIER,WHEREVER ARMAFLEX IS USED, IT MUST BE FIELD TAPED ALONG BOTH LONGITUDINALAND RADIAL SEAMS. SELF-ADHEARING ALONE IS NOT ACCEPTABLE.c.INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOTMORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 450, PER THE 2015IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS.d.ALL HYDRONIC PIPING INSULATION SHALL HAVE A THERMAL CONDUCTIVITY LESS THANOR EQUAL TO 0.27 BTU-IN/HR-FT2-°F.e.ALL HEATING WATER PIPING 1-1/2” OR SMALLER SHALL BE INSULATED WITH 1-1/2”THICKNESS. HEATING WATER PIPING LARGER THAN 1-1/2” SHALL BE INSULATED WITH2” THICKNESS.f.ALL CHILLED WATER PIPING SHALL BE INSULATED WITH 1-1/2” THICKNESS WITH ANAPPROVED VAPOR BARRIER.g.ALL PIPING ROUTED BELOW THE SLAB UNDERGROUND SHALL BE TYPE "k" COPPERAND SHALL BE INSULATED WITH ARMIFLEX TYPE INSULATION.17.TEMPERATURE CONTROL DEVICES:a.CONTRACTOR SHALL PROVIDE CONTROLS CAPABLE OF MEETING THE SEQUENCE OFOPERATION DESCRIBED ON SHEET M-001.b.THE HVAC SYSTEM SHALL BE PROVIDED WITH 7-DAY PROGRAMMABLE AUTOMATICSPACE TEMPERATURE CONTROL DEVICES (THERMOSTATS) AS SHOWN ON THE PLANS.THE THERMOSTATS SHALL BE CAPABLE OF SCHEDULING OCCUPANCIES ANDPROVIDING SETBACK CAPABILITIES TO MAINTAIN ZONE SETPOINTS DOWN TO 55°F ORUP TO 85°F.c.CONTROLS SHALL BE CAPABLE OF PROVIDING A DEADBAND OF AT LEAST 5°F BETWEENHEATING AND COOLING.d.THERMOSTATS SHALL HAVE NUMERIC SET POINTS IN °F, ADJUSTABLE SETPOINTSTOPS, AND SHALL BE MOUNTED AT 46" ABOVE FINISHED FLOOR ADJACENT TO THEROOM'S LIGHT SWITCH.e.COORDINATE CONTROL TIE-INS WITH CONTROLS CONTRACTOR AS NECESSARY.f.ALL THERMOSTATS SHALL BE APPROVED BY THE OWNER.18.SNOWMELT INSULATION:a.INSULATION SHALL BE INSTALLED UNDER ALL SNOWMELT AREAS, MINIMUM R-10.CONFIRM COMPRESSIVE STRENGTH RATING REQUIREMENTS WITH THE STRUCTURALENGINEER FOR EACH APPLICATION. INSULATION UNDER TRAFFIC AREAS MUST BETRAFFIC RATED. BUBBLE-TYPE INSULATION IS PROHIBITED ENTIRELY.19.GAS APPLIANCE VENTING:a.ACCEPTABLE VENT MATERIALS, ROUTING, DISTANCE AND TERMINATION LOCATIONSSHALL COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ALLREQUIREMENTS IN CHAPTER 8 OF THE 2015 IMC. PVC PIPING IS NOT ACCEPTED FORBOILER OR WATER HEATER VENTING. POLYPROPYLENE PIPING MUST BE APPROVEDFOR USE WITH APPLIANCE MANUFACTURER. CPVC MUST COMPLY WITH ASTM F441.20.WATER QUALITY:a.HEATING AND CHILLED WATER CONDITIONS SHALL BE WITHIN HARDNESS AND PHRANGE SUITABLE FOR MECHANICAL EQUIPMENT (PER MANUFACTURER).CONTRACTOR TO TEST CONDITIONS PRIOR TO SYSTEM FILL. WATER SOFTENERS OROTHER DEVICES MAY BE REQUIRED TO IMPROVE WATER QUALITY.b.INCLUDE CORROSION INHIBITORS ON ALL PROPYLENE GLYCOL MIXTURES.c.PRIOR TO SYSTEM FILL, ALL TUBING SYSTEMS AND MANIFOLDS SHALL BE CLEANED ASPRESCRIBED BY THE TUBING MANUFACTURER. SUPPLY ALL TOOLS, CONNECTIONS,LABOR, AND ACCESSORIES NECESSARY TO PROPERLY REMOVE ALL FOREIGNMATERIAL, CHEMICAL, AND RESIDUE WITHIN THE TUBING SYSTEM BEFOREPERMANENTLY CHARGING THE SYSTEM AND PLACING INTO OPERATION.21.BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALLEXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL,STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACEREQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, ANDANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTUREAND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFYARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR.22.COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANTTRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACTLOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATESIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS.23.PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEARWORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLYAND AIR FILTER SECTION OF THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR.24.ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODEAPPROVED VIBRATION ISOLATORS.25.EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TOINSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACYOF FLOWS AND CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT INPROPER OPERATING CONDITION.26.TEST & BALANCING:a.THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY ANINDEPENDENT CERTIFIED TEST AND BALANCE COMPANY.b.5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FORREVIEW AND APPROVAL. ELECTRONIC DISTRIBUTION PREFERRED.c.ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THETEST & BALANCE CONTRACTOR.d.ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THEPLANS.27.FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURALPLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT).28.THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESSPANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT.EQUIPMENT WITH MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHINCRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL.29.ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION,OPERATION & MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICECLEARANCES.30.FILTERS:a.SHALL BE UL RATED AND APPROVED.b.PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE.31.ELECTRICAL CONNECTIONS:a.UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMALOVERLOADS, LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROLTRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY THE MECHANICALCONTRACTOR.b.UNLESS OTHERWISE SPECIFIED, ALL MOTORIZED DAMPERS SHALL BE LOW VOLTAGE.ALL WIRING AND POWER CONNECTIONS SHALL BE PROVIDED BY THE MECHANICALCONTRACTOR.c.PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICSINDICATED ON THE DRAWINGS.d.IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THECONTRACT DOCUMENTS.e.COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OFVOLTAGE, WITH OTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE ANDOPERATIONAL.f.ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION.g.ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BYMECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.32.ACOUSTICAL COMPLIANCEa.AEC IS NOT ABLE TO PROVIDE ACOUSTICAL MODELING OF EXTERIOR EQUIPMENT, NORPROVIDE DOCUMENTATION SUPPORTING COMPLIANCE WITH THE CITY OF ASPENNOISE ORDINANCE. AN ACOUSTICAL CONSULTANT IS RECOMMENDED TO VERIFYCOMPLIANCE. NOISE MITIGATION MEASURES (BY OTHERS) MAY BE REQUIRED.33.TEMPORARY HEATING DURING CONSTRUCTION:a.MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING.SEQUENCE OF OPERATION:B-1, B-2, P-1, P-2:B-1,2 AND THEIR ASSOCIATED BOILER PUMPS (P-1,2) SHALL STAGE AND ROTATE TO PROVIDEHEATING & DOMESTIC HOT WATER. UPON A CALL FOR HEATING THE BOILERS SHALL FIRE BASEDUPON AN OUTDOOR RESET SCHEDULE WITH A MAXIMUM TEMPERATURE AT THE BOILER SUPPLYWATER TEMPERATURE SENSOR OF 140°F. EACH BOILER PUMP (P-1& P-2 ) SHALL BE CONTROLLEDWITH A 0-10 VDC SIGNAL FROM ITS RESPECTIVE BOILER TO MAINTAIN A 30°F ΔT BETWEEN THESUPPLY WATER TEMPERATURE SENSOR IN THE SECONDARY LOOP AND THE BOILER RETURNWATER TEMPERATURE SENSOR.WATER HEATING, WH-1, P3:UPON A CALL FOR DOMESTIC WATER HEATING, BOILER B-2 SHALL ENTER DOMESTIC PRIORITYMODE, P-2 SHALL STOP AND P-3 SHALL START, AND B-2 SHALL PROVIDE 180°F (ADJ.) SUPPLY WATER.P-4A,B:THE VARIABLE SPEED HEATING PUMPS SHALL OPERATE IN DUTY/STANDBY MODE. UPON ANY CALLFOR HEATING, EITHER PUMP SHALL START & VARY ITS SPEED ACCORDING TO A PROPORTIONALPRESSURE CURVE.SNOWMELT ZONES, P-5 & P-6:THE SNOWMELT SYSTEM SHALL BE CONTROLLED ACCORDING TO AN OUTDOOR TEMPERATURESENSOR & SLAB SNOW/ICE SENSOR VIA A TEKMAR 654 CONTROLLER. WHEN THE OUTDOORTEMPERATURE IS BELOW 35°F(ADJ.), THE SNOWMELT SYSTEM SHALL BE ENABLED, P-6 SHALL RUN,& P-5 & THE BOILERS SHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 28°F(ADJ.). IF THESYSTEM IS ENABLED & MOISTURE IS SENSED AT THE SLAB SENSOR, THEN THE ASSOCIATED ZONEVALVES, P-5 & THE BOILERS SHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 38°F (ADJ).MECHANICAL ROOM VENTILATION, EF-3 & SF-3 :MECHANICAL ROOM VENTILATION SHALL BE CONTROLLED BY A WALL COOLING ONLY THERMOSTATWITH A WALL SWITCH OVERRIDE. UPON A CALL FOR COOLING EF-3 & SF-3 SHALL OPERATE. EF-3SHALL NOT BE ALLOWED TO OPERATE WITHOUT SF-3 ENABLED.BATH EXHAUST FANS (EF-1,2,4,5):THE BATH EXHAUST FANS SHALL BE CONTROLLED BY WALL MOUNTED SWITCHES.SF-1,2,4, MD-1,2,3 & HC-1,2,3:SF-1,2,4 SHALL OPERATE DURING OCCUPIED PERIODS PROVIDING O.A. TO THE CORRIDORS ANDHALLWAYS. WHENEVER O.A. SUPPLY TEMPERATURE DROPS BELOW 60° F (ADJ.) THE RESPECTIVEHC-1,2,3 AND ASSOCIATED VALVE SHALL OPEN AND MODULATE TO RE-HEAT THE DISCHARGE AIR TO70° F (ADJ.). SF-1,2,4 SHALL BE INTERLOCKED WITH A MOTORIZED DAMPER (LOW VOLTAGE).ARC-1:DURING HEATING SEASON ARC-1,2,3 SHALL OPERATE BASED UPON A DOOR SWITCH.UH 1-4 & UH 6-16:SHALL OPERATE OFF OF WALL MOUNTED THERMOSTAT TO SATISFY HEATING REQUIREMENTS.(UH-16 SHALL OPERATE OFF OF UNIT MOUNTED THERMOSTAT)77ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCMECHANICALLEGENDSPEC'S &SEQUENCEM-001111
GENERAL NOTES:1.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE.2.ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINERUNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUNDDUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESSOTHERWISE NOTED.3.ALL FINAL DUCTWORK CONNECTIONS TO SUPPLY GRILLES (OR PLENUMS)SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESSOTHERWISE NOTED AND A MAXIMUM LENGTH OF FIVE FEET.4.ALL ROUND DUCT CONNECTIONS TO ROUND DUCTWORK SHALL BECONICAL TEES.5.ALL SQUARE 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.6.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTUREWHERE IT EXISTS UNLESS OTHERWISE NOTED.7.ALL DUCTWORK PASSING THROUGH FIRE-RATED ASSEMBLIES SHALLINCLUDE FIRE DAMPERS RATED TO MATCH THAT OF THE ASSEMBLY,EVEN WHERE NOT EXPLICITLY NOTED ON THIS PLAN.8.ALL FIRE DAMPERS ARE INTENDED TO BE SPRING OPERATED CURTAINDAMPERS. ALL FIRE SMOKE DAMPERS ARE INTENDED TO BE EQUIPPEDWITH 120V ACTUATORS.9.ALL SUPPLY GRILLES SHALL INCLUDE A BALANCING DAMPER(S), EVEN IFNOT SPECIFICALLY SHOWN, UNLESS OTHERWISE NOTED. IF THE DAMPERIS LOCATED IN AN INACCESSIBLE LOCATION, CABLE-STYLE DAMPERS(ROTOTWIST OR EQUIVALENT) SHALL BE INSTALLED AND SHALL BEADJUSTABLE FROM THE GRILLE FACE.10.COORDINATE ALL ACCESS PANEL LOCATIONS WITH THE ARCHITECT.11.ALL MOTORIZED DAMPER ACTUATORS SHALL BE LOW VOLTAGE. IT ISMECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALLNECESSARY EQUIPMENT AND WIRING FOR THEIR INSTALLATION. IF 120 VACTUATORS ARE DESIRED, COORDINATE WITH ELECTRICALCONTRACTOR OR CONTACT ELECTRICAL ENGINEER.12.ALL DUCTWORK SHALL BE SUPPORTED IN ACCORDANCE WITH THE 2015IMC 603.10 AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS.B12 - 4"Ø BOILER FLUES &VENTS UP CHASEEF3B212x12 (15x15) OA-UPWH110x10 EA UPFSSF33EF2EF1UH3K2BDDBDDFSSTUB IN & CAP 6Ø (8) OUTSIDE AIR.SIZED FOR 75 CFM.BDD10x12 (12x14) OAUH3K153210x10 EASF1A15-OA12 x 12A30-OA12 x 12MD1FS4Ø (7)445" Ø EABALANCINGDAMPER (TYP)8" Ø EAA15-OA12 x 124Ø (7)SHEET DETAIL NOTES:ROUTE BOILER FLUES FROM BOILERS TO TERMINATION PERMANUFACTURER'S INSTRUCTIONS. SLOPE VENT PIPES AT 14"/FOOTBACK TO THE BOILER FOR ALL HORIZONTAL RUNS. MAINTAIN 1"CLEARANCE TO COMBUSTIBLES. DO NOT EXCEED 100' MAXIMUMDEVELOPED LENGTH FOR ANY RUN. ESTIMATED LENGTHS ANDELBOWS FOR LONGEST RUN BOILER ARE SHOWN BELOW:B-2 VENT (CPVC):HORIZONTAL DISTANCE:17.5'VERTICAL DISTANCE: 40'45 DEGREE ELBOWS:(2.5')(2) = 5'90 DEGREE ELBOWS:(5')(2) = 10'MAX DEVELOPED LENGTH:72.5'B-2 CA (PVC):HORIZONTAL DISTANCE:17.5'VERTICAL DISTANCE: 40'45 DEGREE ELBOWS:(2.5')(2) = 5'90 DEGREE ELBOWS:(5')(2) = 10'MAX DEVELOPED LENGTH:72.5'FOLLOW ALL MANUFACTURER'S INSTRUCTIONS FOR BOILER VENTINGMATERIALS. PROVIDE CPVC ROUTING FOR THE BOILER FLUES (PVC ISACCEPTABLE FOR THE COMBUSTION AIR). PVC IS NOT ALLOWED FORANY BOILER FLUE ROUTINGS.DUCTING SIZED FOR HEATING ONLY.5FD1BDD4SHEET DETAIL NOTES:ROUTE BOILER FLUES FROM BOILERS TO TERMINATION PERMANUFACTURER'S INSTRUCTIONS. SLOPE VENT PIPES AT 14"/FOOTBACK TO THE BOILER FOR ALL HORIZONTAL RUNS. MAINTAIN 1"CLEARANCE TO COMBUSTIBLES. DO NOT EXCEED 100' MAXIMUMDEVELOPED LENGTH FOR ANY RUN. ESTIMATED LENGTHS ANDELBOWS FOR LONGEST RUN BOILER ARE SHOWN BELOW:B-1 VENT (CPVC):HORIZONTAL DISTANCE:17.5'VERTICAL DISTANCE: 40'45 DEGREE ELBOWS:(2.5')(1) = 2.5'90 DEGREE ELBOWS:(5')(3) = 15'MAX DEVELOPED LENGTH:75'B-1 CA (PVC):HORIZONTAL DISTANCE:17.5'VERTICAL DISTANCE: 40'45 DEGREE ELBOWS:(2.5')(1) = 2.5'90 DEGREE ELBOWS:(5')(3) = 20'MAX DEVELOPED LENGTH:75'FOLLOW ALL MANUFACTURER'S INSTRUCTIONS FOR BOILER VENTINGMATERIALS. PROVIDE CPVC ROUTING FOR THE BOILER FLUES (PVC ISACCEPTABLE FOR THE COMBUSTION AIR). PVC IS NOT ALLOWED FORANY BOILER FLUE ROUTINGS.TEMPORARY UNIT HEATER, SHOWN FOR REFERENCE ONLY. REFER TOELECTRICAL PLANS FOR MORE DETAIL. ADDITIONAL CIRCULATIONFANS MAY BE REQUIRED.TERMINATE WITH WIRE MESH.FUTURE HVAC EQUIPMENT.123464Ø(7)STUB IN & CAP 8"Ø (10") OUTSIDE AIRDUCTS.SIZED FOR 130 CFM.SHEET DETAIL NOTES:ROUTE DUCTING THROUGH TJL JOISTS. CUT INSULATION AT EACHJOIST. SEAL WITH SPRAY FOAM INSULATION.10"X5" (12"x7") ROUTE UNDER STEEL. FB (FLAT BOTTOM) ROUND TORECTANGULAR TRANSITIONS.ROUTE DUCTING THROUGH JOISTS.CONTRACTOR TO COORDINATE EXACT LOCATION IN FIELD. ENSUREALL EFFORTS ARE TAKEN TO ALLOW FOR FUTURE UTILIZATION OFMECHANICAL CHASE BY TENANT INTERIOR.7UH3K2UH3K256Ø (9)4Ø(7)FS5" Ø EA12x5 (14x7) OA8"Ø (10") OA
8"Ø (10") OA7FB
78"Ø (10") OA45° ELBOW DN WITHINJOIST BAY TO FIT UNDERSTEEL ALONG COLUMNLINE C45° ELBOW UP WITHINJOIST BAY TO MATCHWEBBED TJL JOIST.888"Ø (10") OA7
STUB IN & CAP 6x8 (8x10)OUTSIDE AIR.SIZED FOR 150 CFM.BDDBDDBDD45° ELBOW UP ROUTE DUCTUP WITHIN JOIST BAY.999STUB IN & CAP 8"Ø (10") OUTSIDE AIRDUCTS.SIZED FOR 215 CFM.FS1010HC1ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCBASEMENTHVACPLANSCALE 1/4" = 1'-0"M-110211NORTHBASEMENT HVAC PLANSCALE: 1/4" = 1'0"
1C1DECO COLUMN1M2HORIZ MULLION1M1HORIZ MULLION1C5DECO COLUMN1C4DECO COLUMN1C3DECO COLUMN1C2DECO COLUMN1M5HORIZ MULLION1M4HORIZ MULLION1M3HORIZ MULLIONBE3AE3AE31'-25'-36'-33'-634/25'-1058/14'-812/4'-312/4'-938/10'-010'-010'-03'-9914/1'-28'-612/1'-28'-612/18'-1134/81'-25'-101'-22'-034/3'-278/3'-838/212/458/634/714/914/434/DETAILA1234567891011A3ADET.DET.BDET.A GENERAL NOTES:1.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE.2.ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINERUNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUNDDUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESSOTHERWISE NOTED.3.ALL FINAL DUCTWORK CONNECTIONS TO SUPPLY GRILLES (OR PLENUMS)SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESSOTHERWISE NOTED AND A MAXIMUM LENGTH OF FIVE FEET.4.ALL ROUND DUCT CONNECTIONS TO ROUND DUCTWORK SHALL BECONICAL TEES.5.ALL SQUARE 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.6.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTUREWHERE IT EXISTS UNLESS OTHERWISE NOTED.7.ALL DUCTWORK PASSING THROUGH FIRE-RATED ASSEMBLIES SHALLINCLUDE FIRE DAMPERS RATED TO MATCH THAT OF THE ASSEMBLY,EVEN WHERE NOT EXPLICITLY NOTED ON THIS PLAN.8.ALL FIRE DAMPERS ARE INTENDED TO BE SPRING OPERATED CURTAINDAMPERS. ALL FIRE SMOKE DAMPERS ARE INTENDED TO BE EQUIPPEDWITH 120V ACTUATORS.9.ALL SUPPLY GRILLES SHALL INCLUDE A BALANCING DAMPER(S), EVEN IFNOT SPECIFICALLY SHOWN, UNLESS OTHERWISE NOTED. IF THE DAMPERIS LOCATED IN AN INACCESSIBLE LOCATION, CABLE-STYLE DAMPERS(ROTOTWIST OR EQUIVALENT) SHALL BE INSTALLED AND SHALL BEADJUSTABLE FROM THE GRILLE FACE.10.COORDINATE ALL ACCESS PANEL LOCATIONS WITH THE ARCHITECT.11.ALL MOTORIZED DAMPER ACTUATORS SHALL BE LOW VOLTAGE. IT ISMECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALLNECESSARY EQUIPMENT AND WIRING FOR THEIR INSTALLATION. IF 120 VACTUATORS ARE DESIRED, COORDINATE WITH ELECTRICALCONTRACTOR OR CONTACT ELECTRICAL ENGINEER.12.ALL DUCTWORK SHALL BE SUPPORTED IN ACCORDANCE WITH THE 2015IMC 603.10 AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS.SHEET DETAIL NOTES:TEMPORARY UNIT HEATER, SHOWN FOR REFERENCE ONLY. REFER TOELECTRICAL PLANS FOR MORE DETAIL. ADDITIONAL CIRCULATIONFANS MAY BE REQUIRED.ROUTE 12x12 (15x15) OA DN & 16x16 (19x19) OA UP. FIRE SMOKEDAMPERS AT ALL SHAFT PENETRATIONS. CONTRACTOR TOCOORDINATE EXACT LOCATION IN FIELD. ENSURE ALL EFFORTS ARETAKEN TO ALLOW FOR FUTURE UTILIZATION OF MECHANICAL CHASEBY TENANT INTERIOR.2 - 4"Ø BOILER FLUES & VENTS UP & DN CHASE.ROUTE 10x10 EA UP & DN. CONTRACTOR TO COORDINATE EXACTLOCATION IN FIELD. ENSURE ALL EFFORTS ARE TAKEN TO ALLOW FORFUTURE UTILIZATION OF MECHANICAL CHASE BY TENANT INTERIOR.14x12 (17x15) TAKEOFF WITHIN CHASE, TRANSITION WITHIN CEILINGDOWN STREAM OF FIRE SMOKE DAMPER.12UH3KUH3K18x10 (21x13) OASTUB IN & CAP 12Ø (15) OUTSIDE AIR. FIRE DAMPER AT WALLPENETRATION. SIZED FOR 580 CFM.STUB IN & CAP 10Ø (13) OUTSIDE AIR.SIZED FOR 475 CFM.FS12x10(15x13) OA1123344ARC1SF26Ø (9) OA6Ø (9) OAMD2BDD1UH2k1UH2k1UH2k1A50-OA12 x 127ARC277BDDBDDFD5528X12 (30X14) RETURN AIRHC2
ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOC1st FLOORHVACPLANSCALE 1/4" = 1'-0"M-111311NORTH1st FLOOR HVAC PLANSCALE: 1/4" = 1'0"
GENERAL NOTES:1.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE.2.ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINERUNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUNDDUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESSOTHERWISE NOTED.3.ALL FINAL DUCTWORK CONNECTIONS TO SUPPLY GRILLES (OR PLENUMS)SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESSOTHERWISE NOTED AND A MAXIMUM LENGTH OF FIVE FEET.4.ALL ROUND DUCT CONNECTIONS TO ROUND DUCTWORK SHALL BECONICAL TEES.5.ALL SQUARE 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.6.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTUREWHERE IT EXISTS UNLESS OTHERWISE NOTED.7.ALL DUCTWORK PASSING THROUGH FIRE-RATED ASSEMBLIES SHALLINCLUDE FIRE DAMPERS RATED TO MATCH THAT OF THE ASSEMBLY,EVEN WHERE NOT EXPLICITLY NOTED ON THIS PLAN.8.ALL FIRE DAMPERS ARE INTENDED TO BE SPRING OPERATED CURTAINDAMPERS. ALL FIRE SMOKE DAMPERS ARE INTENDED TO BE EQUIPPEDWITH 120V ACTUATORS.9.ALL SUPPLY GRILLES SHALL INCLUDE A BALANCING DAMPER(S), EVEN IFNOT SPECIFICALLY SHOWN, UNLESS OTHERWISE NOTED. IF THE DAMPERIS LOCATED IN AN INACCESSIBLE LOCATION, CABLE-STYLE DAMPERS(ROTOTWIST OR EQUIVALENT) SHALL BE INSTALLED AND SHALL BEADJUSTABLE FROM THE GRILLE FACE.10.COORDINATE ALL ACCESS PANEL LOCATIONS WITH THE ARCHITECT.11.ALL MOTORIZED DAMPER ACTUATORS SHALL BE LOW VOLTAGE. IT ISMECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALLNECESSARY EQUIPMENT AND WIRING FOR THEIR INSTALLATION. IF 120 VACTUATORS ARE DESIRED, COORDINATE WITH ELECTRICALCONTRACTOR OR CONTACT ELECTRICAL ENGINEER.12.ALL DUCTWORK SHALL BE SUPPORTED IN ACCORDANCE WITH THE 2015IMC 603.10 AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS.SHEET DETAIL NOTES:TEMPORARY UNIT HEATER, SHOWN FOR REFERENCE ONLY. REFER TOELECTRICAL PLANS FOR MORE DETAIL. ADDITIONAL CIRCULATIONFANS MAY BE REQUIRED.ROUTE 16X16 (19X19) OA DN & 18X20 (21X23) OA UP. FIRE SMOKEDAMPERS AT ALL SHAFT PENETRATIONS. CONTRACTOR TOCOORDINATE EXACT LOCATION IN FIELD. ENSURE ALL EFFORTS ARETAKEN TO ALLOW FOR FUTURE UTILIZATION OF MECHANICAL CHASEBY TENANT INTERIOR.2 - 4"Ø BOILER FLUES & VENTS UP & DN CHASE.ROUTE 10X10 EA DN &12X10 EA UP. FIRE SMOKE DAMPERS AT ALLSHAFT PENETRATIONS.12EF4EF58Ø EA6Ø EA6Ø EAFS3424UH4K1FSSTUB IN & CAP 10x10 (13x13) OUTSIDE AIR. FIRE DAMPER ATWALL PENETRATION. SIZED FOR 525 CFM.UH4K1UH4K1UH4K1BDDBDD1UH4K1UH4K17SF4MD3BDDA50-OA12 x 126Ø (9) OASTUB IN & CAP 14x12 (17x15) OUTSIDE AIR. FIRE DAMPER ATWALL PENETRATION. SIZED FOR 525 CFM.10x10 (13x13) OA18x10(21x13) OA76Ø (9) OA10x10 (13x13) OA3HC3ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOC2nd FLOORHVACPLANSCALE 1/4" = 1'-0"M-112411NORTH2nd FLOOR HVAC PLANSCALE: 1/4" = 1'0"
GENERAL NOTES:1.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE.2.ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINERUNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUNDDUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESSOTHERWISE NOTED.3.ALL FINAL DUCTWORK CONNECTIONS TO SUPPLY GRILLES (OR PLENUMS)SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESSOTHERWISE NOTED AND A MAXIMUM LENGTH OF FIVE FEET.4.ALL ROUND DUCT CONNECTIONS TO ROUND DUCTWORK SHALL BECONICAL TEES.5.ALL SQUARE 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.6.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTUREWHERE IT EXISTS UNLESS OTHERWISE NOTED.7.ALL DUCTWORK PASSING THROUGH FIRE-RATED ASSEMBLIES SHALLINCLUDE FIRE DAMPERS RATED TO MATCH THAT OF THE ASSEMBLY,EVEN WHERE NOT EXPLICITLY NOTED ON THIS PLAN.8.ALL FIRE DAMPERS ARE INTENDED TO BE SPRING OPERATED CURTAINDAMPERS. ALL FIRE SMOKE DAMPERS ARE INTENDED TO BE EQUIPPEDWITH 120V ACTUATORS.9.ALL SUPPLY GRILLES SHALL INCLUDE A BALANCING DAMPER(S), EVEN IFNOT SPECIFICALLY SHOWN, UNLESS OTHERWISE NOTED. IF THE DAMPERIS LOCATED IN AN INACCESSIBLE LOCATION, CABLE-STYLE DAMPERS(ROTOTWIST OR EQUIVALENT) SHALL BE INSTALLED AND SHALL BEADJUSTABLE FROM THE GRILLE FACE.10.COORDINATE ALL ACCESS PANEL LOCATIONS WITH THE ARCHITECT.11.ALL MOTORIZED DAMPER ACTUATORS SHALL BE LOW VOLTAGE. IT ISMECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALLNECESSARY EQUIPMENT AND WIRING FOR THEIR INSTALLATION. IF 120 VACTUATORS ARE DESIRED, COORDINATE WITH ELECTRICALCONTRACTOR OR CONTACT ELECTRICAL ENGINEER.12.ALL DUCTWORK SHALL BE SUPPORTED IN ACCORDANCE WITH THE 2015IMC 603.10 AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS.2 - 4"Ø BOILER FLUES & VENTS TO TERMINATE ATLEAST 3' ABOVE ROOF. FOLLOW ALL MANUFACTURERINSTALLATION INSTRUCTIONS. MAINTAIN REQUIREDCLEARANCES FROM VENT PIPES. COORDINATE WITHPLUMBER PRIOR TO INSTALLATION.TERMINATE 12x10 EXHAUST DUCT WITH ROOFCAP AT LEAST 3' ABOVE ROOF SURFACE. ROUTE ALONG ROOF, ENSUREPROPER INSULATION FOREXTERNAL DUCTWORK.ROUTE 18x20 (21x23) OADUCT DOWN.15INSTALL GOOSE NECK ON 18x20 (21x23) OA.ENSURE OPENING TO GOOSE NECK IS ABOVEHIGHEST ANTICIPATED SNOW LEVEL. PROTECTGOOSE NECK WITH BIRD WIRE.24AHA60UNIT DIMENSIONSHEIGHT: 43 18"WIDTH: 44 12"DEPTH:17 116"2'1'-8"8"6"3'-718"1'-5"8'-018"MECHANICAL HVAC PENETRATIONS:(SEPARATED BY INTENDED USE)CORE & SHELL:·B-1, B-2(2) - 4"Ø COMBUSTION AIR(2) - 4"Ø FLUE.TENANT INTERIROR:·8 REFRIGERANT LINE SET SLEEVES (16 TOTAL)FUTURE CONDENSING UNITS4 x 24AHA60FUTURE CONDENSING UNITS4 x 24AHA6012x10 (15x13) OA DUCT DOWN FOR FUTURELOCKER/TUNING. CAP BOTH ENDS TILL TENANTINTERIOR.10x10 EA DUCT DOWNFOR FUTURE LOCKERCAP BOTH ENDS TILLTENANT INTERIOR.10x10 EA DUCT DOWNFOR FUTURE TUNING.CAP BOTH ENDS TILLTENANT INTERIOR.DESIGNATED AREA FOR CONDENSERREFRIGERANT LINE SET. 8 X CARRIER24AHA60. CONTRACTOR REFER TOMANUFACTURERS RECOMMENDATIONS ONSIZES AND INSTALLATION.ALTERNATE ROUTING WITHINCEILING BELOW. PROVIDE FIRESMOKE UPON MECHANICALCHASE PENETRATIONofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCROOFHVACPLANSCALE 1/4" = 1'-0"M-113511NORTHROOF HVAC PLANSCALE: 1/4" = 1'0"
SHEET DETAIL NOTES:CONNECT 1-12" SMS/R TO SM-1.CONNECT 1-12" SMS/R TO SM-2.CONNECT 2" SMS/R, 2-12"HWS/R, TO BOILER HEADER, SEE BOILER PIPINGDIAGRAM ON M-601 FOR MORE DETAILS.ROUTE 2" HWS/R UP.INSTALL PER MANUFACTURERS RECOMMENDATIONS.ROUTE 12" HWS/R UP.CONNECT 12" HWS/R TO HC-1.GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACTENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONSSHOWN ON PLANS.4.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANYCHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.5.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.12B1B21-14" HWS/RSM1SM22" SMS/RVALVE & CAP 34" HWS/R @1 GPM, 20ΔT EST.SIZED FOR 3,750 BTUHHEATLOSS& 5,000 BTUH VENTILATION(75 CFM)8,750 BTUH TOTAL.1 12" SMS/R1 12" SMS/RWH1VALVE & CAP 34" HWS/R @ 2 GPM, 20ΔTEST.SIZED FOR 7,500 BTUH HEATLOSS& 10,250 BTUH VENTILATION (150 CFM)17,750 BTUH TOTAL.2" HWS/R12333445UH2UH4UH7UH3UH655555TTO UH-7TTO UH-6TTO UH-1TTO UH-12TTO UH-31" HWS/R1-14" HWS/R1-12" HWS/R2-12" HWS/RVALVE & CAP 1" HWS/R @ 4.5 GPM,20ΔT EST.SIZED FOR 13,500 BTUH HEATLOSS& 25,250 BTUH VENTILATION (345 CFM)38,750 BTUH TOTAL.75UH12777UH157HC112" HWS/R12" HWS/R667ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCBASEMENTMECHANICALPIPINGPLANSCALE 1/4" = 1'-0"M-120611NORTHBASEMENT MECHANICAL PIPING PLANSCALE: 1/4" = 1'0"
1C1DECO COLUMN1M2HORIZ MULLION1M1HORIZ MULLION1C5DECO COLUMN1C4DECO COLUMN1C3DECO COLUMN1C2DECO COLUMN1M5HORIZ MULLION1M4HORIZ MULLION1M3HORIZ MULLIONBE3AE3AE31'-25'-36'-33'-634/25'-1058/14'-812/4'-312/4'-938/10'-010'-010'-03'-9914/1'-28'-612/1'-28'-612/18'-1134/81'-25'-101'-22'-034/3'-278/3'-838/212/458/634/714/914/434/DETAILA1234567891011A3ADET.DET.BDET.A VALVE & CAP 1" HWS/R @ 5 GPM, 20ΔTEST.SIZED FOR 16,250 BTUH HEATLOSS& 34,500 BTUH VENTILATION (475 CFM)50,750 BTUH TOTALVALVE & CAP 1-14" HWS/R @ 8 GPM,20ΔT EST.SIZED FOR 30,250 BTUH HEATLOSS& 42,000 BTUH VENTILATION (580 CFM)72,250 BTUH TOTAL.SZ21,042 SQFTSZ1955 SQFT1-14" HWS/R1-12" HWS/RSHEET DETAIL NOTES:ROUTE 1-12" HWS/R UP & 2" HWS/R DN.INSTALL SNOW & ICE SENSOR IN THE SNOWMELT ZONE AS SHOWN. COORDINATE EXACT LOCATION WITH G.C. ENSURE THE SENSOR IS EQUIDISTANT BETWEEN TUBING & NOT UNDER OVERHANGS OR IN WINDEDDIES.INSTALL PER MANUFACTURERS RECOMMENDATIONS.GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK,LIGHTS, AND STRUCTURE. COORDINATE ALLSTRUCTURAL PENETRATIONS WITH THE STRUCTURALENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATEDASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPESEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THEG.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORETHAN 10' FROM LOCATIONS SHOWN ON PLANS.4.ALL PIPING SIZED FOR TYPE L COPPER. CONTACTENGINEER FOR ANY CHANGE TO PEX FOR NECESSARYPIPE SIZING AND/OR PUMP CHANGES.5.INSULATE ALL PIPE LEADERS PASSING THROUGHADJACENT ZONES.1123TO SNOWMELTCONTROLLERSEE BOILER PIPINGDIAGRAM ON M-601S2UH8UH9UH11UH103333TTO UH-11TTO UH-9TTO UH-4TTO UH-1077774HC212" HWS/R5ROUTE 12" HWS/R DN.CONNECT 12" HWS/R TO HC-2.45ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOC1st FLOORMECHANICALPIPINGPLANSCALE 1/4" = 1'-0"M-121711NORTH1st FLOOR MECHANICAL PIPING PLANSCALE: 1/4" = 1'0"
VALVE & CAP 1-14" HWS/R @ 9 GPM, 20ΔTEST.SIZED FOR 45,000 BTUH HEATLOSS& 37,500 BTUH VENTILATION (525 CFM)82,500 BTUH TOTAL.VALVE & CAP 1-14" HWS/R @ 9 GPM, 20ΔTEST.SIZED FOR 45,000 BTUH HEATLOSS& 37,500 BTUH VENTILATION (525 CFM)82,500 BTUH TOTAL.1-14" HWS/R1-12" HWS/RSHEET DETAIL NOTES:ROUTE 1-12" HWS/R DN.INSTALL PER MANUFACTURERS RECOMMENDATIONS.CONNECT 12" HWS/R TO HC-4.GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACTENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONSSHOWN ON PLANS.4.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANYCHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.5.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.11UH13UH14UH15222UH162TTO UH-8TTO UH-13TTO UH-14TTO UH-15727HC4312" HWS/R3ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOC2nd FLOORMECHANICALPIPINGPLANSCALE 1/4" = 1'-0"M-122811NORTH2nd FLOOR MECHANICAL PIPING PLANSCALE: 1/4" = 1'0"
B2B1SSP1P2MANUAL FILLGF1ET1HEATING WATER PIPING DIAGRAMNO SCALE34"2"2"ROUTE TOFLOORDRAIN (TYP.)P5HX1P6AIR SEPARATOR -SPIROVENT VJR 150TMOR SIMILARET2MANUAL FILLGF234"TO/FROM SNOWMELTMANIFOLDSS30 PSI PRESSURERELIEF VALVE (TYP.)30 PSI PRESSURERELIEF VALVEWH1P32"2"1 12"SROUTE BOILER CONDENSATETHROUGH NEUTRALIZATION BASINTHEN TO FLOOR DRAIN (TYP.)SHEATING SUPPLY WATERTEMPERATURE SENSORHYDRAULIC SEPARATOR WITHMICROBUBBLE - SPIROVENTVDX250 OR SIMILAR3"PIPE TOFLOORDRAINP4ATO/FROM TI & VENT HEATING LOOPP4B 2-12" 3"2-12"7ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCMECHANICALSCHEDULES,& SCHEMATICSM-601911
777777ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCMECHANICALSCHEDULESM-6021011
SNOWMELT REVERSE RETURN LAYOUTNO SCALEINSTALL SNOWMELT TUBING IN REVERSE-RETURN PATTERN TO ALLOWEQUAL HEAT UP OF THE SNOWMELTED SURFACE. THIS LAYOUT IS ANEXAMPLE AND NOT THE ACTUAL TUBING LAYOUT .REVERSE RETURN LAYOUT2" HIGH DENSITY RIGIDEDGE INSULATION.58" HePEX TUBING3'2" HIGH DENSITY RIGIDINSULATION UNDER DRIVEWAY. 2"STANDARD RIGID INSULATIONUNDER WALKWAYS AND DECKS.COORDINATE COMPRESSIONREQUIREMENTS WITH CIVILENGINEER.SPACED 9" 0.C.9" O.C.SNOWMELT TUBING DETAILNO SCALE2" MIN.CONCRETECOVERCOMPACTEDBASEGRADEPROVIDE ARMIFLEX INSULATION SLEEVES ATALL EXPANSION JOINTS IN THE CONCRETEPRESSURIZE SNOW MELT TUBING TO 100 PSIAIR TO PREVENT CRUSHING OF TUBE WHENTHE CONCRETE IS POUREDTIE WRAP TO CONCRETEREINFORCING3' TYP.WIRE TIE 3' O.C.SEE FIGURE 2SNOWMELT MANIFOLD DETAILNO SCALE5/8"Ø LOOPSUPPLY FITTING (TYP)5/8"Ø LOOP RETURNPIPING (TYP)END CAPW/ VENTMANIFOLD SUPPORTBRACKET (TYP.)VALVE CAPANGLE VALVES(TYP)RETURN MANIFOLDRETURN MAINDRAIN DOWNHOSE BIBDRAIN DOWNHOSE BIBBALLVALVESUPPLY MANIFOLDCOMPRESSIONFITTING (TYP)SUPPLY MAINCOMPRESSIONFITTING (TYP)PROVIDE A MEANSFOR BALANCINGINDIVIDUAL LOOPSSHUTOFF/BALANCING VALVEPUMPIN-LINEPROVIDE VIBRATION ISOLATINGTYPE PUMP SUPPORTING HANGERSAT INLET AND DISCHARGE OFTHE PUMP. DO NOT SUPPORTTHE PUMP FROM ITS MOTOR.CHECK VALVEOMIT ON SINGLEPUMP INSTALLATIONSMETAL BRAIDEDFLEXIBLE CONNECTORPRESSURE GAUGEW/ GAUGE COCKS& SNUBBERCOMBINATION ISOLATIONVALVE & CIRCUIT SETTERSHUTOFF VALVE BALL VALVE UP TO 2"BUTTERFLY VALVE 2 12" AND LARGERSTRAINER W/ BLOWDOWN VALVEUNION OR FLANGECONNECTIONIN-LINE PUMP DIAGRAMNO SCALECOILRETURNSUPPLY2-WAY COIL PIPING DIAGRAMNO SCALE2-WAY CONTROL VALVE, NORMALLYCLOSED, INTERLOCKED WITH TSTAT(OR REMOTE SENSOR). PROVIDEPRESSURE INDEPENDENT VALVE(DANFOSS AB-QM OR EQUIVALENT)FOR VARIABLE SPEED SYSTEMS.AUTOFLOW AUTOMATIC BALANCINGCOMBINATION SHUT-OFF AND FLOWCONTROL VALVE. PROVIDEISOLATION VALVE IN LIEU OFCOMBINATION VALVE WHENPRESSURE INDEPENDENT CONTROLVALVE IS INSTALLED.ISOLATION VALVESTRAINER - ARRANGE PIPING FORUSE AS COIL DRAINALL UH HEATING COILS PRESSURE/TEMPERATURE PORT (TYP.)INSULATIONINSULATIONNOTE:COVER FIRESTOP WITH TWO COATSOF WHITE VAPOR BARRIER COATING.CAULK2" MIN. (TYP.)CAULKFIRESTOP MADEIN TWO SECTIONSPENETRATION OF A FIRE RATED WALL DETAILNO SCALEFIRESTOP SHALL FITTIGHT AROUND PIPE.CAULK CAVITY WITH MIN34" UL LISTED SEALANT3M - CP25WB.PIPE SLEEVE CUTFLUSH WITH OUTSIDEPARTITIONSURFACES.PARTITION SURFACESCUT INSULATION FLUSHWITH PARTITION20 GA. GALVANIZEDSTEEL FIRESTOP-EACH SIDE OFPARTITION, SCREWTO PARTITIONSEAL ENDS OFINSULATION WITHVAPOR BARRIERCOATING.VAPOR BARRIERCOATINGINSULATIONCAULK2" MIN. (TYP.)INSULATIONCAULKFIRESTOP SHALL FITTIGHT AROUND PIPE.CAULK CAVITY WITH MIN34" UL LISTED SEALANT3M - CP25WB.PIPE SLEEVE CUTFLUSH WITH OUTSIDEPARTITIONSURFACES.SEAL ENDS OFINSULATION WITHVAPOR BARRIERCOATING.PARTITION SURFACESPENETRATION OF A FIRE RATED CEILING/FLOOR DETAILNO SCALEFIRESTOP MADEIN TWO SECTIONSVAPOR BARRIERCOATINGNOTE:COVER FIRESTOP WITH TWO COATSOF WHITE VAPOR BARRIER COATING.CUT INSULATION FLUSHWITH PARTITION20 GA. GALVANIZEDSTEEL FIRESTOP-EACH SIDE OFPARTITION, SCREWTO PARTITION1/2" CLEARANCE.FUSIBLE LINK FIRE DAMPER BOTH SIDES OFBREAK AWAY JOINTMAINTAIN MAXIMUMSTEEL SLEEVE, EXTENDMAX. 6" BEYOND FACEOF SEPARATION.SLEEVE MIN. 2" ANDSECURE TO STEELFASTENERS 8" O.C.SLEEVE ONLYDAMPER SLEEVEACCESS DOOR(PROVIDE PRESSURERELIEF FEATUREFOR MEDIUM OR HIGHPRESSURE SYSTEMS)1-1/2" X 1-1/2" X 1/8"RETAINING ANGLENOTES:1" @ EACH CORNER.OVERLAP ANGLE MIN.1.) VERTICAL TYPE FIRE DAMPER SHOWN. FOR HORIZONTAL TYPE, TURN ASSEMBLY 90 DEG. ANDPROVIDE WITH SPRING NEGATOR EXTENSION.2.) FIRE DAMPER ASSEMBLY RATING SHALL MEET THE MINIMUM REQUIREMENT FOR THE FIRERESISTANCE ASSEMBLY IN THE LOCATION WHERE IT IS INSTALLED PER TABLE 607.3.1 IN THE 2015 IMC.FIRE DAMPER DETAILNO SCALECURTAIN TYPE FIRE DAMPERWITH SPRINGACCESS DOOR (PROVIDEPRESSURE RELIEF FEATUREFOR MEDIUM OR HIGHPRESSURE SYSTEMS)NOTES:1.) FIRE DAMPER ASSEMBLY RATING SHALL MEET THE MINIMUM REQUIREMENT FOR THEFIRE RESISTANCE ASSEMBLY IN THE LOCATION WHERE IT IS INSTALLED PER TABLE 607.3.1IN THE 2015 IMC.2.) VERIFY INSTALLATION WITH MANUFACTURER'S I/O MANUAL.MAINTAIN MAXIMUM 1/2"CLEARANCE.BREAK AWAY JOINT BOTHSIDES OF DAMPER SLEEVEFASTENERS 8" O.C. SECURETO STEEL SLEEVE ONLY1-1/2" X 1-1/2" X 1/8"RETAINING ANGLEOVERLAP ANGLE MIN.1" @ EACH CORNER.STEEL SLEEVE, EXTENDSLEEVE MIN. 2" ANDMAX. 6" BEYOND FACEOF SEPARATION.TYPICAL HORIZONTAL FIRE DAMPER DETAILNO SCALERETURNFLOW DIRECTIONSUPPLYFLOW METERBTU METER INSTALLATION DETAILNO SCALESUPPLYTEMPERATURESENSORRETURNTEMPERATURESENSORREFER TO MANUFACTURER'SRECOMMMENDATIONS FORUPSTREAM & DOWNSTREAMDISTANCE24VAC INPUT ANDSIGNAL CONNECTIONSTO CONTROL SYSTEMNOTE:BTU METER SHALL BE CALIBRATED IN FILED TO REQUIRED FLOW FOR EACHUNIT. REFER TO MANUFACTURER MANUAL FOR CALIBRATION PROCEDURE.COILRETURNSUPPLY2-WAY COIL PIPING DIAGRAMNO SCALE2-WAY CONTROL VALVE, NORMALLYCLOSED, INTERLOCKED WITH TSTAT(OR REMOTE SENSOR) ANDDISCHARGE AIR SENSOR.AUTOFLOW AUTOMATIC BALANCINGVALVE - COMBINATION SHUT-OFFAND FLOW CONTROL VALVE.ISOLATION VALVESTRAINER - ARRANGE PIPING FORUSE AS COIL DRAINPRESSURE/TEMPERATURE PORT (TYP.)ofwww.aec-vail.com
a
PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520
ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING
534 EAST COOPER
ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7BLUTOCMECHANICALDETAILSM-6031111