Loading...
HomeMy WebLinkAboutFile Documents.534 E Cooper Ave.0003.2017 (5).ACBKGREASE WASTE BELOW GRADEINDIRECT WASTENOTE: ALL SYMBOLS SHOWN ON LEGENDARE NOT NECESSARILY USED.WASTE ABOVE GRADEDOMESTIC HOT WATER RECIRC.DOMESTIC HOT WATERDOMESTIC COLD WATERPLUMBING LEGENDMEDIUM PRESSURE NATURAL GASGREASE WASTE ABOVE GRADEWASTE BELOW GRADEGASGMPGVENT THROUGH ROOFCLEAN OUT TO GRADEFLOOR CLEAN OUTWALL CLEAN OUTCLEAN OUTNEWEXISTINGCOWCOFCOCOTG(E)(N)VTRIWVENTCONDENSATE DRAINCUP THROUGH ROOFUTRPIPE RISERPIPE DROPPIPE TAKEOFF (FROM BOTTOM OF MAIN)PIPE TAKEOFF (FROM TOP OF MAIN)PIP END CAPPIPE CONTINUATIONPIPE EXPANSION GUIDEPIPE UNIONPIPE ANCHORFLEXIBLE PIPE CONNECTIONPIPE EXPANSION JOINTPOINT OF NEW CONNECTIONAIR VENTPLUG VALVECHECK VALVEBALL VALVEBALANCING VALVEBUTTERFLY VALVEPRESSURE REDUCING VALVESTRAINERPRESSURE - TEMP. TAPPRESSURE GAUGE2-WAY CONTROL VALVE3-WAY CONTROL VALVE4-WAY CONTROL VALVEFLOW REGULATOR VALVEDIFFERENTIAL BYPASS VALVENATURAL GAS PRESSURE REGULATORTHERMOMETERUPUPDOWNDNPLUMBING SPECIFICATIONS:1.GENERAL:a.FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIESNECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALLWORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN.b.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TOMAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS AREMENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUTWHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM,EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONEDHEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEINGINSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.2.WORKMANSHIP:a.THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKEMANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNERAND ARCHITECT.3.MATERIALS:a.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIRRESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITYSPECIFIED.4.SITE INSPECTION:a.CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HISBID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKINGCONDITIONS & EXACT NATURE OF THE WORK.b.SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FORFURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.c.NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOWEXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TOTHOROUGHLY MAKE THE EXAMINATION.5.CODES AND PERMITS:a.ALL PLUMBING EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE2015 INTERNATIONAL PLUMBING CODE (IPC), 2015 INTERNATIONAL ENERGYCONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THETOWN OF ASPEN BUILDING DEPARTMENT.b.CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.c.COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TOTHE ARCHITECT.6.AS-BUILTS:a.CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTSWITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECTAND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.7.GUARANTEE:a.CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR ANDMATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP ANDMATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.8.SUBMITTALS:a.CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALLBE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH).ELECTRONIC SUBMITTALS PREFERRED.9.COORDINATION:a.THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.b.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TOPROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.10.CUTTING AND PATCHING:a.ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OREXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.b.PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.c.X-RAY SLABS PRIOR TO CORING.11.CLEANUP:a.UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTORSHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRISINCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY.12.PLUMBING IDENTIFICATIONa.EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FORPERMANENT ATTACHMENT ON EQUIPMENT.b.PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATINGSERVICE, AND SHOWING DIRECTION OF FLOW.c.VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPINGSYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME.PROVIDE 5/32" HOLE FOR FASTENER.d.VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTEDTO THE MAINTENANCE ENGINEER FOR RECORD.13.PIPE INSULATION:a.DOMESTIC WATER PIPING INSULATION SHALL HAVE A THERMALCONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-°F.b.HOT & COLD WATER SUPPLY PIPING (EXCEPT RUN OUTS 12 FT. OR SHORTERTO INDIVIDUAL FIXTURES) SHALL BE INSULATED AS FOLLOWS:PIPE SIZE (IN.)INSULATION THICKNESS (IN.)1/2", 3/4", 1" & 1 1/4"1"1 1/2" THROUGH 6"1 1/2"c.NO HOT OR COLD WATER PIPING SHALL BE ROUTED IN EXTERIOR WALLSUNLESS PROPERLY INSULATED.d.CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC.e.STORM DRAIN PIPING SHALL BE INSULATED WITH FIBERGLASS INSULATIONFROM THE UNDERSIDE OF THE DECK TO THE VERTICAL RISER.14.PIPING:a.WASTE, VENT AND STORM DRAIN PIPING:i.SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE.ii.UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC.iii.VENT PIPING IN RETURN AIR CEILING PLENUMS SHALL BE COPPER PIPING.b.WATER PIPING:i.SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER FITTINGS.ii.JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER.iii.WATER PIPING 1 1/4” & SMALLER CAN ALSO BE UPONOR AQUAPEX APR, REHAURAUPEX OR EQUIVILANT-PROVIDE DEDUCT ALTERNATE PRICING.iv.UNLESS OTHERWISE NOTED, ALL WATER PIPE SIZING IS BASED UPONCOPPER. IF ASTM APPROVED PEX IS UTILIZED, UPSIZE ONE NOMINAL SIZEFROM THAT SHOWN ON PLANS.c.CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS.d.NATURAL GAS PIPING:i. 2" AND SMALLER SHALL BE THREADED STANDARD WEIGHT SCHEDULE 40BLACK STEEL PIPE WITH SCREWED MALLEABLE IRON FITTINGS.ii.PIPING 2 1/2" AND LARGER SHALL BE WELDED.iii.CSST PIPE IS NOT APPROVED.iv.ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR ENAMEL.v.REGULATOR VENTING SHALL BE NO LONGER THAN MANUFACTURER'SRECOMMENDATION, ALUMINUM, VENTED TO THE OUTDOORS, AND A MINIMUMOF 3' FROM ANY OPENING INTO BUILDING AND 6' FROM ANY MECHANICALINTAKE AND 1' FROM ANY ELECTRICAL EQUIPMENT.e.UNDERGROUND NATURAL GAS PIPING:i.SHALL BE IPS SDR 10 TUBING WHICH MEETS ASTM D2513 MANUFACTUREDBY UPONOR OR IAPMO.ii.ANY GAS PIPING ROUTED BENEATH HARD POURED SURFACES SHALL BESLEEVED TO MEET THE REQUIREMENTS OF THE UTLITY COMPANY.15.EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM ANYMECHANICAL INTAKE AND AT LEAST THREE FEET FROM ANY OPENING INTO THEBUILDING.16.VERIFY INVERT ELEVATION OF WASTE LINE IN STREET PRIOR TO ROUTING ANY PIPING.PROVIDE SEWAGE WASTE EJECTOR IF I.E. OF EXISTING SANITARY WASTE CAN NOT BEACCOMMODATED.17.CLEAN-OUTS SHALL BE INSTALLED AS PER 2015 IPC SECTION 708.18.PROTECT ROOF RECEPTOR ON ROOF FROM RAIN WATER BY ELEVATING THE RIM 2 ½”INCHES ABOVE ROOF SURFACE.19.PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS,ROOF AND FLOORS.20.PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE-STOPPED.FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED ANDCAPABLE OF MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO TEST TEMPERATUREFOR SPECIFIC WALL OR PARTITION.21.PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALLPIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACTWITH ANY PORTION OF THE STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING.22.LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFYEXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THISSECTION. MAKE REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IFINDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THECONTRACTOR SHALL, BEFORE CONTINUING, NOTIFY THE ARCHITECT PRIOR TOINSTALLING ANY WORK WHICH MAY BE AFFECTED.23.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FORINSTALLING THE WORK.24.VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICEPRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED.25.PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN THE2015 IPC SECTION 308. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.26.CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRINGROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE ANDOPERATING MANUALS TO THE OWNER/OPERATOR.27.CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITYCONNECTIONS.28.ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TOTHE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE SECURED 6"OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET BRACKETS.29.AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAMOF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCEOF CONTAMINATION.30.ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS SHALL BEPROVIDED BY THE PLUMBING CONTRACTOR AND WIRED BY THE ELECTRICALCONTRACTOR.1ofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCPLUMBINGLEGENDSPEC'S &SCHEDULESP-00116 GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIREDCLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONSWITH THE ARCHITECT PRIOR TO INSTALLATION.4.COORDINATE ALL HOSE BIBB AND WALL HYDRANT LOCATIONS WITH THEARCHITECT.5.OVERFLOW DRAIN AND OUTLET LOCATIONS TBD.6.COORDINATE UNDER SLAB PIPING AND EQUIPMENT WITH STRUCTURALENGINEER.7.ALL DASHED WASTE LINES SHALL BE ROUTED UNDER SLAB, SOLID LINEWASTE SHALL BE ROUTED UNDER THE CEILING.8.PLUMBING CONTRACTOR TO COORDINATE INFIELD ALL WASTE AND VENTINVERTS.FD-11FD-11FD-11CONNECT 4" W & 2" V TO FD.SEE WATER ENTRY DETAIL ON SHEET P1.1.CONNECT 1 14" G TO BOILERCONFIRM DRAIN SIZE & SUMP PUMP SIZE WITH FIRE PROTECTIONENGINEER OR CONSULTANT PRIOR TO PURCHASING AND INSTALLATIONOF THIS EQUIPMENT.ROUTE 4" W TO P-3A,B SUMP PUMP PIT.PRESSURE TO GRAVITY CONNECTION. SEE DETAIL SHEET P1.1.PROVIDE 36"Ø X 36" DEEP SUMP PIT WITH PP-3A&B. BOTH SUMP PIT &OI-2 TO BE ACCESSIBLE FROM MECHANICAL ROOM FLOOR. INVERTVERIFICATION BY OTHERS.APPROX. LOCATION OF THE (E) GREASE INTERCEPTOR. VERIFY IN FIELD.VERIFY LOCATION, SIZE, INVERT ELEVATION, ORIENTATION OF INLET ANDOUTLET AND EXISTING VENT. EXISTING VENT TO REMAIN. EXTEND ANDREINSTALL VENT AS NECESSARY. ADJUST WASTE LINE IF INLET/OUTLETOF THE GREASE INTERCEPTOR DIFFERS FROM SHOWN. COORDINATE INFIELD. VERIFY LOCATION OF THE EXISTING GREASE WASTE LINE ANDREINSTALL IN THE BUILDING AS INDICATED AND AS REQUIRED. CONTACTMECHANICAL ENGINEER WITH THE EXACT LOCATION, SIZE, AND STATE.THE (E) GREASE INTERCEPTOR TO REMAIN.APPROX. LOCATION OF EXISTING GREASE WASTE. VERIFY LOCATIONAND SIZE. CONTACT MECHANICAL ENGINEER IF IT DIFFERS.ROUTE 4" W TO THE MAIN SEWER. COORDINATE WITH CIVIL ENGINEER,COORDINATE INVERT ELEVATION IN FIELD BASED ON THE EXISTINGGREASE INTERCEPTOR AND PROVIDE INFORMATION TO CIVIL ANDMECHANICAL ENGINEERS.CONNECT 1/2" CW, HW, 1-1/2" W & V TO LV.CONNECT 1" CW, 2" W & 1-1/2" V TO UR.CONNECT 1" CW, 3" W, & 2" V TO WC.CONNECT 34" CW, 34" HW, 2" W & 1 12" V TO MS.CONNECT 2 12" CW, 34" HWC, & 1 12" HW TO WATER ENTRY AND HOTWATER HEATER.ROUTE 2" V UP.ROUTE 4" W DN TO OI-1.ROUTE 1-14" CW (IRRIGATOIN) TO WATER METERROUTE 1-14" CW (IRRIGATOIN) UPDEWATERING PUMP SHOWN FOR REFERENCE ONLY, REFER TO CIVILPLANS FOR DETAILS AND LOCATIONS. TERMINATE 4"Ø STORM DRAIN INDRY WELL. COORDINATE SIZING WITH CIVIL ENGINEER. PUMPS ANDDROP LOCATIONS ARE SHOWN FOR REFERENCE ONLY. REFER TO CIVILDRAWINGS FOR ACTUAL LOCATIONS.ROUTE 4" (UG) TO NOTE 20. LINE BROKEN FOR CLARITY.IN SLAB INVERT COORDINATION BY OTHERS.FLOOR MOUNT OIL INTERCEPTOR. INSTALL PER MANUFACTURERSRECOMMENDATIONS.ROUTE 4" W HIGH TO NOTE 23. LINE BROKEN FOR CLARITY.CONNECT 4" W & 2" V TO FD. FD IN ELEVATOR PIT ABOVE DEAD SPACE.FLOOR MOUNT PP-2 IN SPACE BELOW ELEVATOR PIT. ENSURE OI-1 ISHIGH ENOUGH TO GRAVITY FEED INTO PP-2.MOUNT OIL INTERCEPTOR A MINIMUM OF 1'-0" AFF AND A MAXIMUM OF1'-6" AFF. PIPING LENGTH FROM OI-1 TO PP-2 IS NOT TO EXCEED 20'-0" ORHAVE A SLOPE LESS THAN 18"/12" INSTALL PER MANUFACTURERSRECOMMENDATIONS. ENSURE OI-1 IS HIGH ENOUGH TO GRAVITY FEEDINTO PP-2.ROUTE & CAP 4" W FOR FUTURE FD-2.CAP 4" W FOR FUTURE TENANT INTERIOR. VENT ROUTING TBD.2" V UP TO CEILING, FURTHER ROUTING WITHIN TENANT INTERIOR.COORDINATE WITH FUTURE INTERIOR WALLS.TRENCH THE WASTE LINES DEEP ENOUGH TO ALLOW FOR FURTHEREXPANSION. ALLOW ENOUGH DEPTH TO REACH COLUMN LINE M WITH18":12" SLOPED WASTECONNECT TWO 4" SD UNDER SLAB TO ONE 6" SD THEN ROUTE INTO DRYWELL.SHEET DETAIL NOTES:12PROVIDE 24"Ø X 24" DEEP SUMP PIT WITH PP-2 BOTHSUMP PIT & OI-1 TO BE ACCESIBLE FROM BOTTOM OFELEVATOR PIT. 2" V TO CONNECT TO SUMP PIT &INTERCEPTOR & STAY INDEPENDENT UP TO ROOF.PP32-2" V TO CONNECT TO SUMPPIT & INTERCEPTOR & STAYINDEPENDENT UP TO ROOF.4" SD UP34" HWC UP1 12" HW UP2 12" CW UP4" W UP6" WWATERENTRYCONFIRM WATER ENTRY SIZE WITH F.P.C. TOENTER BUILDING IN THIS AREA. COORDINATE FIREPROTECTION TAKEOFF WITH F.P.C. ROUTE TOMECHANICAL ROOM WATER ENTRY ASSEMBLYPRIOR TO ANY OTHER TAKEOFFS.22" G UP3B-13B-23NO FIXTURES PLANNEDFOR BASEMENT LEVEL4444" WFD-155MS2" V UP3" SPD (UG)3" SPD UP66776" W88APPROX. LOCATION OF (E)GREASE INTERCEPTOR(E) 4" GW88CAP 4"GW991-1/2" WLVURWCWCLV1010101111121212NO FIXTURES PLANNEDFOR STORAGE 003FD-124OI1PP2131312" HWC1" HW2" CW2" CW34" HW12" HWC14141MAINTAIN PIPESLOPE OF 14"/FTMAINTAIN PIPESLOPE OF 14"/FT1515152-2" V UP4" WASTE LINE SIZED FORA MAXIMUM 20 OF D.F.U.4" WASTE LINE SIZED FORA MAXIMUM 20 OF FUTUREDFUCONNECT 12" HWC TO HOTWATER LINE. PROVIDEBALANCING VALVE UNDER THESINK & BALANCE TO 1.00 GPM.4" WASTE LINE SIZED FORA MAXIMUM 20 OF DFU16161717 1-14" CW(IRRIGATION)18183CAP & VALVE 1" CW (MAX4 GPM) FOR FUTURECONNECTION.2" V4" W (UG)4" W (UG)4" W (UG)2" W (UG)2" W (UG)3" W (UG)3" W (UG)2" W (UG)2" V1-12" V2" V19194" W4" WOI24" W (UG)1-12" W (UG)4" W (UG)654" W202020WASTE LINE SIZED FOR 3FLOOR DRAINS. AND 2 UTILITYSINKS.FURTHER VENTINGTBD. COORDINATE VENTRISERS WITH TI INTERIORWALLS.4" W2" V2" V2" V212121212152" V2" V2" V2" V3" SPD (UG)2222261-12" V1-12" V2" V1-12" VOI-1 SPACEBELOWELEVATOR PIT4" W (UG)4" W (UG)PP4232323244" W4" W2525264" W (UG)27528CO2929293030128284" SD31315ofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCLOWER LEVELPLUMBINGPLANSCALE 1/4" = 1'-0"P-11026NORTHLOWER LEVEL PLUMBING PLANSCALE: 1/4" = 1'0" 1C1DECO COLUMN1M2HORIZ MULLION1M1HORIZ MULLION1C5DECO COLUMN1C4DECO COLUMN1C3DECO COLUMN1C2DECO COLUMN1M5HORIZ MULLION1M4HORIZ MULLION1M3HORIZ MULLIONBE3AE3AE31'-25'-36'-33'-634/25'-1058/14'-812/4'-312/4'-938/10'-010'-010'-03'-9914/1'-28'-612/1'-28'-612/18'-1134/81'-25'-101'-22'-034/3'-278/3'-838/212/458/634/714/914/434/DETAILA1234567891011A3ADET.DET.BDET.A CAP & VALVE 12" HWC,1" HW (MAX 4 GPM) &1" CW (MAX 6 GPM) FORFUTURE CONNECTION.GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIREDCLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONSWITH THE ARCHITECT PRIOR TO INSTALLATION.4.COORDINATE ALL HOSE BIBB AND WALL HYDRANT LOCATIONS WITH THEARCHITECT.5.OVERFLOW DRAIN AND OUTLET LOCATIONS TBD.CONNECT 4" W & 2" V TO FD.MOUNT NZ-1 MIN. 12" ABOVE GRADE, RE: DETAIL ON P1.1APPROX. LOCATION OF THE (E) GREASE INTERCEPTOR. VERIFY INFIELD. VERIFY LOCATION, AND SIZE. CONTACT MECHANICAL ENGINEERWITH THE EXACT LOCATION, SIZE, AND STATE. THE (E) GREASEINTERCEPTOR TO REMAIN.PIPING IS SCHEMATIC, COORDINATE WITH DUCTING AND EQUIPMENTWITHIN SHAFT.ROUTE 1-14" CW (IRRIGATION) DNSHEET DETAIL NOTES:13" W UPTO WC2" V UP4" SD UP4" SD1 12" W UP3" W3" W 4" W DN4" SD UP/DN12" HWC UP & 34" DN1 14" HW UP & 1 12" DN2" CW UP & 2 12" DN2-2" V UP/DNINSTALL PIPES OVER UNCONDITIONEDSPACE ON THE WARM SIDE OFINSULATION TO PREVENT FREEZING.ROUTE 2" G TO GAS METER. COORDINATE LOCATION WITH CIVILENGINEER AND ARCHITECT. CONTACT MECHANICAL ENGINEER IFTOTAL DEVELOPED LENGTH FROM BOILER TO METER EXCEEDS 100'.CONTRACTOR TO ROUTE GAS METER VENT OUT FROM OVERHANG,AND MAINTAIN ALL REQUIRED CLEARANCES.2" G DN4" W3" W CAPPED FOR FUTUREUPPER LEVEL FIXTURES.SIZE LIMITED TO 20 D.F.U.s2" V2" V CAPPED FOR FUTUREMAIN LEVEL FIXTURES.SIZE LIMITED TO 20 D.F.U.s4" W 3" W 3" W3" W3" W CAPPED FOR FUTUREUPPER LEVEL FIXTURES.SIZE LIMITED TO 20 D.F.U.s3" W CAPPED FOR FUTUREUPPER LEVEL FIXTURES.SIZE LIMITED TO 20 D.F.U.s2" V DN &2-1/2" V UPNZ-23" SPD DN TO NZ-1(POINT OF GRAVITY)3" SPD DN22APPROX. LOCATION OF (E)GREASE INTERCEPTORMAN HOLEAPPROX. LOCATION OF (E)GREASE INTERCEPTORMAN HOLE333NZ-126" OD UP2" V UP3" W UPTO WC1 12" W UPTO LV1 12" W UPTO LV1 12" W1 12" W1 12" W2-2" V UP/DN2-1/2" V CAPPED FORFUTURE USE SIZE LIMITEDTO 30 D.F.U.2-1/2" V UP2-1/2" V CAPPED FORFUTURE USE SIZE LIMITEDTO 30 D.F.U.CAP & VALVE 12" HWC,1" HW (MAX 4 GPM) &1" CW (MAX 6 GPM) FORFUTURE CONNECTION.1442-1/2" V CAPPED FORFUTURE USE SIZE LIMITEDTO 30 D.F.U.2-1/2" V UP2-12" V UPIRRIGATION EQUIPMENT. 1-14" CW(IRRIGATION)5534" SD DNofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCMAIN LEVELPLUMBINGPLANSCALE 1/4" = 1'-0"P-11136NORTHMAIN LEVEL PLUMBING PLANSCALE: 1/4" = 1'0" WC2WC2DF4DF4LV13" V.U.T.R.CAP & VALVE 12" HWC,3/4" HW (MAX 2 GPM) &3/4" CW (MAX 3 GPM)FOR FUTURECONNECTION.3" V.U.T.R.& 2 12" V DN3" V CAPPED IN CEILINGFOR FUTURE CONNECTION.SIZE LIMITED TO 50 D.F.U.BALANCE HWCVALVE TO 0.5 GPM2" V1 12" V2" V GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIREDCLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONSWITH THE ARCHITECT PRIOR TO INSTALLATION.4.COORDINATE ALL HOSE BIBB AND WALL HYDRANT LOCATIONS WITH THEARCHITECT.5.OVERFLOW DRAIN AND OUTLET LOCATIONS TBD.CONNECT 12" CW, 12" HW, 1 12" W & 1 12" V TO LV.CONNECT 1 12" CW, 3" W & 2" V TO WC.CONNECT 34" CW, 34" HW, 2" W & 1 12" V TO MS.CONNECT 12" CW, 1 12" W & 1 12" V TO DF.SHEET DETAIL NOTES:12343" SD UPTO RD3" SD UPTO RD3" SD UPTO RD3" SD UPTO RD3" SD UPTO RD3" SD UP TO RD2" V 3" SD3" SD4" SD4" SD3" SD4" SD DN12" HWC34" HW2" CW4" SD DOWN12" HWC DOWN1 14" HW DOWN2" CW DOWN2-2" V DOWN,2-3" V.U.T.R.2-1/2" V DOWN2-1/2" V2-1/2" V CAPPED FORFUTURE USE2-1/2" V CAPPED FORFUTURE USE. SIZE LIMITEDTO 30 D.F.U.3" V UTR & 2-1/2" V DN3" OD UPTO OD3" OD UPTO OD3" OD UPTO OD3" OD UPTO OD4" OD3" OD3" OD3" OD UPTO OD3" OD4" OD 6" OD DN(IN A RATED ENCLOSURE)4" OD6" OD6" OD6" OD IN THE CEILING IN THEFIRE RATED ENCLOSURELV1INSTALL PIPES IN WALLON WARM SIDE OFINSULATION. SHOWNOFFSET HERE FORCLARITY.2-2" V DOWN,2-3" V.U.T.R.1 12" CW1 12" CW12-1/2" V CAPPED FORFUTURE USE.SIZE LIMITEDTO 20 D.F.U.3" V UTR & 2-1/2" V DNCAP & VALVE 12" HWC,3/4" HW (MAX 2 GPM) &3/4" CW (MAX 3 GPM)FOR FUTURECONNECTION.12" HWC1" HW1" CW12" HWC34" HW34" CWofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCUPPER LEVELPLUMBINGPLANSCALE 1/4" = 1'-0"P-11246NORTHUPPER LEVEL PLUMBING PLANSCALE: 1/4" = 1'0" 3" V TO TERMINATE AT LEAST3' ABOVE ROOF SURFACE.CAP UNTIL TENANT INTERIOR3" V TO TERMINATE AT LEAST3' ABOVE ROOF SURFACE.RD1GENERAL NOTES:1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, ANDSTRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THESTRUCTURAL ENGINEER.2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDEA FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3.INSTALL CLEANOUTS PER SECTION 708 OF THE IPC. NOT ALL REQUIREDCLEANOUTS NECESSARILY SHOWN. COORDINATE ALL FINAL LOCATIONSWITH THE ARCHITECT PRIOR TO INSTALLATION.4.COORDINATE ALL HOSE BIBB AND WALL HYDRANT LOCATIONS WITH THEARCHITECT.5.CONFIRM SCUPPERS LOCATIONS WITH THE ARCHITECT. PROVIDEALLOWANCE FOR ROOFTOP OVERFLOW DRAINS & INTERNAL OVERFLOWPIPING OR SCUPPERS.CONNECT 3" SD TO RD.CONNECT 3" OD TO OD.SHEET DETAIL NOTES:12-3" V TO TERMINATE AT LEAST 3'ABOVE ROOF SURFACE.2-3" V TO TERMINATE AT LEAST 3'ABOVE ROOF SURFACE.COORDINATE REQUIREDCLEARANCES WITH NEARBYBOILER FLUES.ODRDOD1RDOD1RDOD1RDOD1RDOD1222222213" V TO TERMINATE AT LEAST3' ABOVE ROOF SURFACE.CAP UNTIL TENANT INTERIOR3" V TO TERMINATE AT LEAST3' ABOVE ROOF SURFACE.CAP UNTIL TENANT INTERIORofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCROOFPLUMBINGPLANSCALE 1/4" = 1'-0"P-11356NORTHROOF PLUMBING PLANSCALE: 1/4" = 1'0" 29" MAX 32"-34" 27" MIN 8" MIN8" MIN DOES NOT INCLUDE OVERFLOW9" MIN 17" MIN.PROVIDE 'TRUEBRO'#103 INSULATION KITADA PEDESTAL LAVATORYNO SCALE5 1/2"INSIDE WALLOUTSIDE WALLPIPE INSULATION PER SPECLOCATE PIPE TO INSIDE WALLVERIFY THAT ALL INSULATIONAROUND PIPING IS EQUALLYDISTRIBUTED WITHOUT ANY AIRGAPS OR UN-INSULATED AREAS.INSULATIONPIPE IN OUTSIDE WALL DETAILNO SCALE:WALL CLEANOUT DIAGRAMNO SCALEBALANCE OF PIPINGSAME AS CLEANOUTTO GRADE18" C.I. BENDFLOOR LINEPLUGGED TEE WITHCLEAN OUTEXTERIOR WALLCHROME WALLCOVERAND SCREW1'-0"2-WAY C.O.T.G. DETAILNO SCALEFINISHED GRADE ORFLOORCOTG TOP COVERCITY SEWER LINEGRAVELC.I. 6" 2-WAY COTGWASTE LINECLEANOUT SCHEMATICSNO SCALECLEANOUT AND ACCESSCOVER. TOP OF COVERTO BE FLUSH W/TOP OFFLOORFLOORLINEBALANCE OF PIPINGSAME AS CLEANOUTTO GRADE.1/8 C.I. BENDFLOOR CLEANOUT (FCO)CLEANOUT NOT TO BE LOCATEDIN CARPETED AREA.CLEANOUT TO GRADE (COTG)1/8 BEND IF CLEANOUTOCCURS AT END OFLINE.C.I. WASTE LINE.LGTH TO SUIT.1/8 C.I. BENDFINISHED GRADEBRASS CLEANOUT PLUGW/COUNTER SUNK HEAD16"Ø CONC. PAD TROWELSMOOTH & EDGED STRAINERRPBFP-1#8 BARE COPPERWIREDUCTILE IRON WATER SERVICE BY THE CIVILCONTRACTOR. RE: CIVIL PLAN FOR CONTINUATION,EXACT SIZE, LOCATION & INVERT ELEVATIONS.ANCHOR PIPINGTO WALLTO WALLANCHOR PIPING RPBFP-1:WILKINS ROUTE DN TO F.D. OR BASINPRV: PRESSURE REDUCINGVALVEREFERENCE THEELECTRICALDOCUMENTS FORGROUNDING DETAILSANCHOR PIPINGTO WALLMAIN DOMESTIC WATER ENTRY DETAILNO SCALE2 12"1 12"FIRE PROTECTION SYSTEM, PIPING &EQUIPMENT PROVIDED BY DESIGN BUILD FIREPROTECTION CONTRACTOR. F.P.C. TOVERIFY PIPE SIZING PRIOR TO INSTALLATION.2-3 FEETMINIMUM OFFIVE DIAMETERSOF STRAIGHTPIPEMMAIN SHUT OFF VALVELOCATE WITHIN 5' OF THEENTRY INTO THE BUILDINGLINK SEALPROVIDE APPROVED VERTICALJOINT RESTRAINTS AS REQUIREDINDIRECT WATER HEATER DETAILNO SCALEDOMESTIC COLDWATERDOMESTIC HOTWATERHOT WATERRECIRCULATIONPIPE RELIEF TO FLOORDRAINEXPANSION TANKCHECK VALVE (TYP.)THE HOT WATER RECIRCULATIONPUMP SHALL BE THERMOSTATICALLYCONTROLLED. PUMP SHALL STOPWHEN THE RETURN WATERTEMPERATURE REACHES 100°F (ADJ).WH140°F 115°F SBOILER SUPPLY& RETURN PIPINGSTYPICAL LOW PRESSUREGAS CONNECTION DETAILNO SCALEGAS SHUT OFF VALVETYP.LOW PRESSUREGAS LINE6" MIN. DRIP LEGMECHANICALEQUIPMENTPRESSURE TO GRAVITY CONNECTIONNO SCALEFLOWSANITARY SEWERLAT FROM BLDG45° BENDPVC SCH 40SANITARY SEWEREJECTOR LINESANITARY SEWERLATERAL TO MAINWYEPROVIDE LEONARD LV-982-LFTHERMOSTATIC MIXING VALVE1 12" WATER METERPP1NZ-1TERMINATE 12" ABOVE BASINGRATEGROUND, RE: CIVIL3" SD (CAST IRON, HUB, NO-HUBACCEPTABLE)BOLTS - SIZE AS REQUIRED FOR SUBSTRATE(TYP. 3x)DOWNSPOUT NOZZLE TERMINATION DETAILNO SCALE12"1 14"NOTE:ENSURE 120 PSI WATER PRESSURE PRIOR TOMETER. IF BELOW 120 PSI CONTACT ENGINEERBOOSTER PUMP REQUIRED.TO IRRIGATIONTAP UPSTREAM OFWATER SOFTENERS2 12"TO FIXTURESofwww.aec-vail.com a PO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 ceDrawn By:Checked By:DATE:ISSUE:AEC PROJECT #:BOOGIE'S BUILDING 534 EAST COOPER ASPEN, CO 8161115075.02An Office with LEED™ Accredited Professionals08-14-19RFI # 032809-04-19CO#2 COMMENTS09-15-19ROOF EQUIPMENT09-26-19ROOF PEN. PRELIM.11-25-19CO #2 CLARIFICATION7DPFTOCPLUMBINGDETAILSP-60166