HomeMy WebLinkAboutFile Documents.534 E Cooper Ave.0117.2018 (4).ACBKCOMcheck Software Version 4.1.0.0
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:29%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
534 East Cooper
Aspen, CO 81611
Owner/Agent:
William Lewis
Poss Architecture + Planning
605 East Main Street
Aspen, CO 81611
970-925-4755
wlewis@billposs.com
Designer/Contractor:
Martin Zourek
AEC
PO Box 8489
40801 US 6 & 24, Ste 214
Avon, CO 81620
970-748-8520
martin@aec-vail.com
Project Information
Energy Code:
Boogies Building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Building Area Floor Area
1-OFFICES, RETAIL & CORRIDORS (Retail) : Nonresidential 13360
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS]
5444 28.0 25.0 0.019 0.021
Roof 2 Elevator: Attic Roof with Wood Joists, [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
59 28.0 25.0 0.019 0.021
Roof 2 Elevator copy 1: Attic Roof with Wood Joists, [Bldg. Use 1 -
OFFICES, RETAIL & CORRIDORS]
115 5.0 35.0 0.024 0.021
NORTH
NORTH WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
1286 20.0 5.0 0.047 0.051
Window 1: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS] (b)
175 ------0.280 0.290
NORTH WALL 2: Concrete Block:8", Solid Grouted, Normal Density,
Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS]
268 ---5.0 0.143 0.071
Door 1: Wood, Swinging, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS]
27 ------0.640 0.370
NORTH WALL 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
82 20.0 5.0 0.047 0.051
Window 2: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, PF 0.64, [Bldg. Use 1 - OFFICES, RETAIL
& CORRIDORS] (b)
45 ------0.280 0.290
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
141 ofPage11/15/2018
02/21/2019
bonniem
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
EAST
EAST WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
2284 20.0 5.0 0.047 0.051
Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS] (b)
694 ------0.280 0.290
EAST WALL 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
100 20.0 5.0 0.047 0.051
Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, PF 0.64, [Bldg. Use 1 - OFFICES, RETAIL
& CORRIDORS] (b)
23 ------0.280 0.290
Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.45, PF 0.64, [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS] (b)
71 ------0.350 0.770
EAST WALL 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
120 20.0 5.0 0.047 0.051
Window 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS] (b)
55 ------0.280 0.290
Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.45, [Bldg. Use 1 - OFFICES, RETAIL
& CORRIDORS] (b)
58 ------0.350 0.770
EAST WALL 4: Concrete Block:8", Solid Grouted, Normal Density,
Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS]
10 ---5.0 0.143 0.071
SOUTH
SOUTH WALL 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
120 20.0 5.0 0.047 0.051
Window 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS] (b)
55 ------0.280 0.290
Door 4: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.45, [Bldg. Use 1 - OFFICES, RETAIL
& CORRIDORS] (b)
58 ------0.350 0.770
SOUTH WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
1303 20.0 5.0 0.047 0.051
Window 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL &
CORRIDORS] (b)
387 ------0.280 0.290
Door 5: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.45, PF 0.34, [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS] (b)
64 ------0.350 0.770
SOUTH WALL 3: Concrete Block:8", Solid Grouted, Normal Density,
Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS]
10 ---5.0 0.143 0.071
WEST
WEST WALL: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES,
RETAIL & CORRIDORS]
268 20.0 5.0 0.047 0.051
WEST WALL 2: Concrete Block:8", Solid Grouted, Normal Density,
Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS]
10 ---5.0 0.143 0.071
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
142 ofPage11/15/2018
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 0.3% better than code
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
143 ofPage11/15/2018
COMcheck Software Version 4.1.0.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
534 East Cooper
Aspen, CO 81611
Owner/Agent:
William Lewis
Poss Architecture + Planning
605 East Main Street
Aspen, CO 81611
970-925-4755
wlewis@billposs.com
Designer/Contractor:
Martin Zourek
AEC
PO Box 8489
40801 US 6 & 24, Ste 214
Avon, CO 81620
970-748-8520
martin@aec-vail.com
Project Information
Energy Code:
Boogies Building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Heating: Hot Water Boiler, Capacity 399 kBtu/h, Gas
Proposed Efficiency: 98.00 % Et, Required Efficiency: 88.00 % Et
2 Boilers B-1, B-2:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
144 ofPage11/15/2018
Inspection Checklist
Requirements: 52.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.0.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: schedules on M1.1
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
145 ofPage11/15/2018
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
146 ofPage11/15/2018
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
147 ofPage11/15/2018
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: P1.0 schedule
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
148 ofPage11/15/2018
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME58]3
Outdoor air and exhaust systems have
motorized dampers that automatically
shut when not in use and meet
maximum leakage rates. Check
gravity dampers where allowed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.13
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.3
[ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.5.
1
[ME114]2
Hot water boilers supplying heat via
one- or two-pipe systems include
outdoor setback control.
Complies
Does Not
Not Observable
Not Applicable
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Location on plans/spec: This item will be provided during TI
finish
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9
[ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Specification on M1.0 and General
notes on each page M2.0 - M2.3
C403.2.9
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Mechanical specification M1.0
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
149 ofPage11/15/2018
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.4.2.
2
[ME64]2
Two-pipe hydronic systems using a
common distribution system have
controls to allow a deadband >=15 ºF,
allow operation in one mode for at
least 4 hrs before changeover, and
have rest controls to limit heating and
cooling supply temperature to <=30
ºF.
Complies
Does Not
Not Observable
Not Applicable
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.5,
C403.5.1,
C403.5.2
[ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
1410 ofPage11/15/2018
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not
Not Observable
Not Applicable
C402.2.3
[IN6]1
Above-grade wall insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.2.2
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
1411 ofPage11/15/2018
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.5
[FI55]1
Building envelope contains a
continuous air barrier that has been
tested and deemed to limit air leakage
<= 0.40 cfm/ft2.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo doors.
Complies
Does Not
Not Observable
Not Applicable
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M1.1 schedules
C403.2.4.
1.2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Mechanical specification on M1.0,
section 18.
C403.2.4.
1.3
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.4.
2
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Mechanical specification on M1.0,
section 18
C403.2.4.
2.1,
C403.2.4.
2.2
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Mechanical specification on M1.0
section 18b
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Mechanical specification M1.0
section 27
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
1412 ofPage11/15/2018
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: mechanical specificastion M1.0
section 27
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date:
1413 ofPage11/15/2018
Project Title:
Data filename:
Boogies Building
\\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies
2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck
10/31/18Report date: