Loading...
HomeMy WebLinkAboutFile Documents.534 E Cooper Ave.0117.2018 (4).ACBKCOMcheck Software Version 4.1.0.0 Envelope Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Vertical Glazing / Wall Area:29% Location:Aspen, Colorado Climate Zone:7 Construction Site: 534 East Cooper Aspen, CO 81611 Owner/Agent: William Lewis Poss Architecture + Planning 605 East Main Street Aspen, CO 81611 970-925-4755 wlewis@billposs.com Designer/Contractor: Martin Zourek AEC PO Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Project Information Energy Code: Boogies Building High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Additional Efficiency Package(s) Building Area Floor Area 1-OFFICES, RETAIL & CORRIDORS (Retail) : Nonresidential 13360 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 5444 28.0 25.0 0.019 0.021 Roof 2 Elevator: Attic Roof with Wood Joists, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 59 28.0 25.0 0.019 0.021 Roof 2 Elevator copy 1: Attic Roof with Wood Joists, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 115 5.0 35.0 0.024 0.021 NORTH NORTH WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 1286 20.0 5.0 0.047 0.051 Window 1: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 175 ------0.280 0.290 NORTH WALL 2: Concrete Block:8", Solid Grouted, Normal Density, Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 268 ---5.0 0.143 0.071 Door 1: Wood, Swinging, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 27 ------0.640 0.370 NORTH WALL 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 82 20.0 5.0 0.047 0.051 Window 2: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, PF 0.64, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 45 ------0.280 0.290 Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 141 ofPage11/15/2018 02/21/2019 bonniem Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter EAST EAST WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 2284 20.0 5.0 0.047 0.051 Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 694 ------0.280 0.290 EAST WALL 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 100 20.0 5.0 0.047 0.051 Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, PF 0.64, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 23 ------0.280 0.290 Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.64, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 71 ------0.350 0.770 EAST WALL 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 120 20.0 5.0 0.047 0.051 Window 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 55 ------0.280 0.290 Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 58 ------0.350 0.770 EAST WALL 4: Concrete Block:8", Solid Grouted, Normal Density, Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 10 ---5.0 0.143 0.071 SOUTH SOUTH WALL 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 120 20.0 5.0 0.047 0.051 Window 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 55 ------0.280 0.290 Door 4: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 58 ------0.350 0.770 SOUTH WALL 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 1303 20.0 5.0 0.047 0.051 Window 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID na, SHGC 0.36, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 387 ------0.280 0.290 Door 5: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.34, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] (b) 64 ------0.350 0.770 SOUTH WALL 3: Concrete Block:8", Solid Grouted, Normal Density, Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 10 ---5.0 0.143 0.071 WEST WEST WALL: Wood-Framed, 16" o.c., [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 268 20.0 5.0 0.047 0.051 WEST WALL 2: Concrete Block:8", Solid Grouted, Normal Density, Furring: None, [Bldg. Use 1 - OFFICES, RETAIL & CORRIDORS] 10 ---5.0 0.143 0.071 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 142 ofPage11/15/2018 Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 0.3% better than code Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 143 ofPage11/15/2018 COMcheck Software Version 4.1.0.0 Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Location:Aspen, Colorado Climate Zone:7 Construction Site: 534 East Cooper Aspen, CO 81611 Owner/Agent: William Lewis Poss Architecture + Planning 605 East Main Street Aspen, CO 81611 970-925-4755 wlewis@billposs.com Designer/Contractor: Martin Zourek AEC PO Box 8489 40801 US 6 & 24, Ste 214 Avon, CO 81620 970-748-8520 martin@aec-vail.com Project Information Energy Code: Boogies Building High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Additional Efficiency Package(s) Mechanical Systems List Quantity System Type & Description Heating: Hot Water Boiler, Capacity 399 kBtu/h, Gas Proposed Efficiency: 98.00 % Et, Required Efficiency: 88.00 % Et 2 Boilers B-1, B-2: Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 144 ofPage11/15/2018 Inspection Checklist Requirements: 52.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.0.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: schedules on M1.1 C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 145 ofPage11/15/2018 Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C403.2.4. 5, C403.2.4. 6 [FO9]3 Snow/ice melting system sensors for future connection to controls. Freeze protection systems have automatic controls installed. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 146 ofPage11/15/2018 Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 147 ofPage11/15/2018 Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: P1.0 schedule Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 148 ofPage11/15/2018 Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.2.6 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable C403.2.13 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.5. 1 [ME114]2 Hot water boilers supplying heat via one- or two-pipe systems include outdoor setback control. Complies Does Not Not Observable Not Applicable C403.2.6. 1 [ME59]1 Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Location on plans/spec: This item will be provided during TI finish C403.2.6. 2 [ME115]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.8 [ME116]3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.9 [ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Specification on M1.0 and General notes on each page M2.0 - M2.3 C403.2.9 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Mechanical specification M1.0 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 149 ofPage11/15/2018 Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.2. 2 [ME64]2 Two-pipe hydronic systems using a common distribution system have controls to allow a deadband >=15 ºF, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 ºF. Complies Does Not Not Observable Not Applicable C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.5, C403.5.1, C403.5.2 [ME123]3 Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 1410 ofPage11/15/2018 Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable C402.2.3 [IN6]1 Above-grade wall insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C402.2.2 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 1411 ofPage11/15/2018 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.5 [FI55]1 Building envelope contains a continuous air barrier that has been tested and deemed to limit air leakage <= 0.40 cfm/ft2. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo doors. Complies Does Not Not Observable Not Applicable C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M1.1 schedules C403.2.4. 1.2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Mechanical specification on M1.0, section 18. C403.2.4. 1.3 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.4. 2 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Mechanical specification on M1.0, section 18 C403.2.4. 2.1, C403.2.4. 2.2 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Mechanical specification on M1.0 section 18b C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Mechanical specification M1.0 section 27 C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 1412 ofPage11/15/2018 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: mechanical specificastion M1.0 section 27 C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 1413 ofPage11/15/2018 Project Title: Data filename: Boogies Building \\EgnyteDrive\Projects\Current Projects\15075.02 - 534 East Cooper Boogies 2018\Calculations\COMcheck\Boogies - REVISED FOR 2015 - u-value 0.28 shgc 0.36 NC.cck 10/31/18Report date: 1414 ofPage11/15/2018