Loading...
HomeMy WebLinkAboutFile Documents.534 E Cooper Ave.0117.2018.ACBK1 William Lewis From:David Radeck <david.radeck@cityofaspen.com> Sent:Tuesday, February 12, 2019 11:23 AM To:Les Rosenstein; Bonnie Muhigirwa; Mike Horvath Cc:John Barker; William Lewis; nwsoho@gmail.com Subject:RE: Responses are in for 534 E Cooper change order Les, I spoke to Nick and he is aware that I will need the following before Parks can sign off on the change order. Please submit an updated planting plan showing sod locations vs other plantings along with an irrigation plan showing a POC (Point of Connection) with a backflow prevention device along with a lockable shutoff master valve. Netafim or a similar product is required for areas with less than 10ft width, which will apply for all of the planting areas. The trees will need to be on a separate zone fed by a drip irrigation system. This should be a relatively easy process and should allow Parks to sign off quickly. I believe that I mentioned electric service out to the trees to William and am not sure if it got addressed. Please confirm that if it is still desired, that the stubs end outside of the root balls of the trees. Thanks! David Radeck Project Technician Parks Department 585 Cemetery Lane Aspen, CO 81611 p: 970.429.2025 f: 970.920.5128 www.cityofaspen.com To apply for a Tree Removal/Dripline Excavation Permit, register here: https://www.surveymonkey.com/r/SFNewUser Tree Removal/Dripline Excavation Permit Online Permit Application: https://cityofaspen.force.com/applicantportal/s/login/?startURL=%2Fapplicantportal%2Fs%2F&ec=302 If you need assistance for the online portal, please contact customer support: sfsupport@cityofaspen.com or call 970-920-5065 From: Mike Horvath Sent: Tuesday, February 12, 2019 9:35 AM To: Les Rosenstein <lrosenstein@billposs.com>; Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com>; David Radeck <david.radeck@cityofaspen.com> 2/22/2019 2 Cc: John Barker <john.barker@cityofaspen.com>; William Lewis <wlewis@billposs.com> Subject: RE: Responses are in for 534 E Cooper change order Les, I am in the process of reviewing the plans. I need to coordinate with some City staff before sending comments, but I will have comments. Mike Horvath, PE, CFM City Engineer II Engineering Department 201 N. Mill St. Aspen, CO 81611 970-429-2776 www.cityofaspen.com For Information about the CASTLE CREEK BRIDGE/HALLAM ST IMPROVEMENTS: p: 970.618.5379 e: info@castlecreekbridge.com www.castlecreekbridge.com From: Les Rosenstein <lrosenstein@billposs.com> Sent: Tuesday, February 12, 2019 9:31 AM To: Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com>; Mike Horvath <mike.horvath@cityofaspen.com>; David Radeck <david.radeck@cityofaspen.com> Cc: John Barker <john.barker@cityofaspen.com>; William Lewis <wlewis@billposs.com>; Les Rosenstein <lrosenstein@billposs.com> Subject: RE: Responses are in for 534 E Cooper change order Hi Bonnie, Can we please get a status update. We have not heard anything definitive from anyone since we met with you. Thanks for your help, Les LES ROSENSTEIN Architect | Partner ARCHITECTURE + PLANNING 605 East Main Street Aspen, CO 81611 970/ 925-4755 www.billposs.com 2/22/2019 3 CONFIDENTIALITY NOTICE | The information contained in this e-mail is confidential and shall not be shared by a third party except as necessary to perform your work. If you have received this e-mail in error, please notify the sender and delete this e-mail. From: Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com> Sent: Friday, February 8, 2019 1:07 PM To: Mike Horvath <mike.horvath@cityofaspen.com>; David Radeck <david.radeck@cityofaspen.com> Cc: John Barker <john.barker@cityofaspen.com>; Les Rosenstein <lrosenstein@billposs.com>; William Lewis <wlewis@billposs.com> Subject: Responses are in for 534 E Cooper change order Hi Mike and Dave, As we discussed on the phone yesterday, the responses are now in for engineering and parks on the 534 E Cooper change order (0117.2018.ACBK // 126-275-277). William and Les at Poss Architecture would much appreciate any updates you can give as to when you anticipate being able to complete your review. Thanks, Bonnie Muhigirwa Plans Examiner Community Development 130 S Galena St. Aspen, CO 81611 p 970.429.2787 c 970.309.5119 www.cityofaspen.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. 2/22/2019