Loading...
HomeMy WebLinkAboutFile Documents.533 E Main St.0004.2017 (2).ACBK 610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com ST. MARY CATHOLIC CHURCH PERMIT COMMENT RESPONSES - ENGINEERING     Attachments:    Comments received from COA engineering Department, numbered and with responses  Updated Landscape Plan  Current Survey From SGM  Updated Civil drawings from SGM  Executed Transformer agreement from Archdiocese of Denver City of Aspen Received 5/2/17 Building Department 0004.2017.ACBK_Engineering_1 Page: 2 Author: jackd File Name: 00.Plans.Combined.pdf Manholes shown with no additional information. Provide adequate information for all manholes. 00.Plans.Combined.pdf (23) Page: 2 Author: jackd File Name: 00.Plans.Combined.pdf Is there a transformer here? Label and show all utilities. Page: 2 Author: jackd File Name: 00.Plans.Combined.pdf Show all underground utlities. There are storm and water lines in this area. Page: 11 Author: jackd File Name: 00.Plans.Combined.pdf Include this line work in legend Page: 11 Author: jackd File Name: 00.Plans.Combined.pdf Show electrical line feeding lamp post Manholes shown with no additional information. Provide adequate information for all manholes. Is there a transformer here? Label and show all utilities. Show all underground utlities. There are storm and water lines in this area. 13" 13" Include this line work in legend 17" Show electrical line feeding lamp post 1 2 3 4 5 SEE UPDATED SURVEY ATTACHED SEE UPDATED SURVEY ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED COMPILED RESPONSES TO COA ENGINEERING COMMENTS SUBMITTED 05.02.2017 ST. MARY CATHOLIC CHURCH City of Aspen Received 5/2/17 Building Department Page: 11 Author: jackd File Name: 00.Plans.Combined.pdf Provide Legend Page: 12 Author: jackd File Name: 00.Plans.Combined.pdf Show the granite path to be installed on appropriate sheets. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Label all inlets and outlet inverts for storm sewer. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Provide spot elevations. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Bring sidewalk construction to alley. 15"4" 8" 11" 2"2"4"4"3"4" 3" Show the granite path to be installed on appropriate sheets. Label all inlets and outlet inverts for storm sewer. Provide spot elevations. Bring sidewalk construction to alley. 6 7 8 9 10 LEGENDS PROVIDED ON DRAWING SET The granite path was conceptual, and is not being built. It has been taken off of the landscape plan set as well as our set. - revised landscape plan attached SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED City of Aspen Received 5/2/17 Building Department Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Submitted sheets need to be ready for construction. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Why does this section of sidewalk go up then down? Max longitudinal slope is 5%. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Sidewalk must be 6' wide. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf Provide spot elevations showing water will spill toward street. Page: 14 Author: jackd File Name: 00.Plans.Combined.pdf The longitudinal slope of this entire section needs to be 5%. The ADA ramp wings in the middle of the sidewalk can't exceed 5%. inary For uction 118 West Glenwood 970.945.1 Submitted sheets need to be ready for construction. Why does this section of sidewalk go up then down? Max longitudinal slope is 5%. Sidewalk must be 6' wide. 15" Provide spot elevations showing water will spill toward street. Revision# St. Mary Catholic Church Aspen, CO Preliminary Not For Construction 118 West Sixth Street, Suite 200Glenwood Springs, CO 81601970.945.1004 www.sgm-inc.com The longitudinalslope of this entiresection needs to be5%. The ADA rampwings in the middle ofthe sidewalk can'texceed 5%. 11 12 13 14 15 Water will not flow towards street. Water will flow into swale and either percolate into the grass swale, through the loamy sand, the screened rock, and into a 4” perforated PVC pipe, or go in to the 6” surface drain inlet at the end of the swale. SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED City of Aspen Received 5/2/17 Building Department Page: 15 Author: jackd File Name: 00.Plans.Combined.pdf What does this hatching indicate? Please provide a legend. Page: 15 Author: jackd File Name: 00.Plans.Combined.pdf The max allowable cross slope is 2%. Please revise. Page: 15 Author: jackd File Name: 00.Plans.Combined.pdf Parking will need to be removed in this area to accommodate sight triangles for driveway. Page: 15 Author: jackd File Name: 00.Plans.Combined.pdf Does this profile view go through the stair entrance to the church? Route profile around entryway stairs. Page: 19 Author: jackd File Name: 00.Plans.Combined.pdf The provided swale cross section has no side slopes... why? 30"26" What does this hatching indicate? Please provide a legend. 30" The max allowable cross slope is 2%. Please revise. Parking will need to be removed in this area to accommodate sight triangles for driveway. Does this profile view go through the stair entrance to the church? Route profile around entryway stairs. The provided swale cross section has no side slopes... why? 16 17 18 19 20 Existing no parking signs around the curb cut are already in place. SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED CIVIL DRAWINGS ATTACHED City of Aspen Received 5/2/17 Building Department Page: 20 Author: jackd File Name: 00.Plans.Combined.pdf Show appropriate clearances for transformer. Page: 20 Author: jackd File Name: 00.Plans.Combined.pdf Provide Existing transformer Easement or get a new transformer easement. Page: 20 Author: jackd File Name: 00.Plans.Combined.pdf Design for less than 8.33% so that there is room for error in the field. Page: 3 Author: jackd File Name: DrainageReport.pdf wqcv is required to be detained for the entire remodel area. DrainageReport.pdf (8) Page: 4 Author: jackd File Name: DrainageReport.pdf Include more information about all pervious paver sections that are proposed. Show appropriate clearances for transformer. 15" Provide Existing transformer Easement or get a new transformer easement. Design for less than 8.33% so that there is room for error in the field. pleted for the City of Aspen in 2001 and upd , the property is well outside of any zone for ect roposed interior work will demolish more th monstrate that the project is in compliance w P). Throughout the design process, the Low I ater runoff. As the project is located within t ture Volume (WQCV) is required to be detain ed when the sidewalk widens in that area.  wqcv is required to be detained for the entire remodel area. b s   B It by a grassed s swale, and the Basin 3 is the  t consists mo swale and dra e overflow w area betwee ostly of grass,  ain pipe. The W ill sheet flow  n Basins 1 an pervious pav WQ ac nd 2 ver Include more information about all pervious paver sections that are proposed. 21 22 23 24 25 SEE UPDATED TRASH ENCLOSURE DRAWINGS There was no existing transformer easement found. SGM has written a new easement and the church and archdiocese have executed the agreement with the city; see attached. SEE UPDATED CIVIL DRAWINGS ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED City of Aspen Received 5/2/17 Building Department Page: 4 Author: jackd File Name: DrainageReport.pdf Basin 3 includes the pathway that is proposed for removal and the new granite fines path. Include description of how the pathway changes impact drainage. Page: 5 Author: jackd File Name: DrainageReport.pdf The western portion of the church roof is in basin 3 and needs to be treated for WQCV Page: 8 Author: jackd File Name: DrainageReport.pdf Basin 3 must be included in the detention calculations. Page: 8 Author: jackd File Name: DrainageReport.pdf Total area in Table 8 does not match the total area in Appendix A. Page: 8 Author: jackd File Name: DrainageReport.pdf Basin 3 must be included in WQCV calculations. . Unde ht of w the cor d the g  will be  the sid nerally of, and er historic con way and into t rner of Hunte rass on the si e detained in  dewalk and in y the middle p d concrete, an nditions, surfa the gutter tha er St and Mai ide of the chu a subsurface nto Inlet 2.  portion of the nd has 56.4% ace runoff fro at runs along  n St. Under d urch will be c e detention ar e parcel. This  % impervious a om Basin 2 flo Hunter St. U developed con onveyed into rea below the basin is 13,1 area. Develop 2 ows over  ltimately,  nditions,  o Inlet 2  e grassed  78.3 SF.  ped  Basin 3 includes the pathway that is proposed for removal and the new granite fines path. Include description of how the pathway changes impact drainage. istoric drainage patterns; however, a slight decrease in surface  65 SF of concrete driveway with pervious pavers. Surface runoff for  e the basin.  unoff of each basin for the 10‐Yr and 100‐Yr storm events using the  0 acres. The runoff coefficients (C) were determined using the  and Figure 3.3‐Runoff Coefficients for NRCS HSG B of the City of  f Duration (Td) for each basin was considerably less than 5 minutes,   Td of 5 minutes be used. Rainfall intensity was calculated using a Td  f 0.77 inch/hour for the 10‐Yr event and 1.23 inch/hour for the 100‐ y, the peak flow (Q) was determined for each basin using Equation 2  ach basin the runoff coefficient (C), the rainfall intensity (I) for the  d together to determine the peak flow (see Appendix C). The tables  eveloped conditions for each basin.  The western portion of the church roof is in basin 3 and needs to be treated for WQCV Table 9 Width Length Depth Volum (ft) (ft) (Inch) W*L*D/12 287.710 43.9 Storage volume available for developed runoff of Basin 2 Dimension of the Detention Area Basin 3 must be included in the detention calculations. promoting filtration, infiltr is treated before entering    Table 8 below shows the c Using Figure 8.14 in the Cit effective imperviousness b was determined using the  determine the WQCV stora       Table 9 below shows the s required storage is adequa   Table 8 Basin ID Total Area Impe See Basin Exhibit (SF) 2 3674.8 Water Quality Capture Volume Sto Table 9 Storage volume available for deve Total area in Table 8 does not match the total area in Appendix A.  between the concrete sidewalks and the back of the curb was left to act as a buffer  red the gutter. This green space allows water to sheet flow over its surface,  tion, and settling to remove pollutants.  The site qualifies as MDCIA Level 1 as runoff  he city storm sewer system.   culated WQCV storage required for Basin 2‐the area on the east side of the church.   of Aspen URMP, the total imperviousness of the basin was reduced to a lower  cause MDCIA and other LID practices were used. The WQCV (in watershed‐inches)  ffective imperviousness and Figure 8.13 of the URMP. Finally, Equation 4 was used to  ge based on the watershed‐inches and the area of the basin (see Appendix C).    orage volume of the subsurface detention area. This illustrates that the WQCV  ely met by the subsurface detention area.  vious Area Imperviousness MDCIA Effective Imperviousness WQCV WQCV Storage (SF) (%) Level from Figure 8.14 Value from Figure 8.13 WQCV‐In*Area/12 297.3 0.63 1 0.61 0.12 36.7 ft3 age required for developed runoff of Basin 2 Void Space Volume epth Volume Sand = 30% nch) W*L*D/12*0.30 3/4" Screened Rock = 30% 10 43.9 ft3 ped runoff of Basin 2 in the Subsurface Detention Area Basin 3 must be included in WQCV calculations. 26 27 28 29 30 SEE UPDATED DRAINAGE REPORT ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED SEE UPDATED DRAINAGE REPORT ATTACHED City of Aspen Received 5/2/17 Building Department Page: 9 Author: jackd File Name: DrainageReport.pdf Include an Operation and Maintenance section in the report. Include all proposed BMPs. 31 SEE UPDATED DRAINAGE REPORT ATTACHED City of Aspen Received 5/2/17 Building Department  07.17.16City of Aspen Received 5/2/17Building Department Dan Cokley, P.E. 0029799 Project Engineer Vicinity Map St. Mary Catholic Church 533 Main Street Aspen, CO 81611 Parcel #273707331801 Sheet Index Owner / Applicant Revision#Date By Job #.File: TS-01 Cover Sheet GN-01 Legend, Notes, and Abbreviations EX-01 Existing Conditions CDM-01 Demolition Plan CGE-01 Geometry Plan CRD-01 Hunter Street Sidewalk Plan & Profile CRD-02 Highway-82 Sidewalk Plan & Profile CEC-01 Erosion Control Plan CSW-01 Stormwater Management Plan CDT-01 City of Aspen Standard Details CDT-02 Project Details CDT-03 Curb Ramp Cross Sections CDT-04 Striping Plan Permit Resub. Set April 2017 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com St. Mary Catholic Church Aspen, CO Project Location Site Plan Scale: 1" = 40' Project Contacts: Project Engineer: Dan Cokley, 970-384-9009 Site Superintendent: Josh Miller, 970-261-5389 Safety Specialist: Stuart Dalpiaz, 970-640-7284 Traffic Control Supervisor: Dick Perkins, 970-216-8603 Erosion Control Supervisor: Josh Miller, 970-261-5389 City of Aspen Engineering: 970-920-5080 City of Aspen Electric: 970-920-5148 Gas: Black Hills Energy 970-927-0482 City of Aspen Water Department: 970-920-5110 Aspen Consolidated Sanitation District: 970-429-5415 Lot: A-I Saint Marys Catholic Church Subdivision: City and Townsite of Aspen Block: 93 4/17/2017 City of Aspen Received 5/2/17 Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Legend Notes and Abbreviations 2016.195.001 DCS 8/11/2016 DCS Admin XX GN-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com Additional Abbreviations Additional Line Types & Symbols 4/17/2017 City of Aspen Received 5/2/17 Building Department 15"4" 8" 11" 5" 5" 15" 13" 13" 17" 20" 20" 18" 6" 28" 26" 26" 30" 30"24"26"24"3"3"33"21" 8" 6" 18" 2" 2"2"4"4"3"4" 3" Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = ##' 0 ##### Existing Conditions 2016.195.001 AMC 8/11/2016 DCS DemoPlan XX EX-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department 15"4"8"11"5"5"15"13"13"17"20"20"18"6"28"26"26"30"30"24"26"24"3"3"33"21"8"6"18"2"2"2"4"4"3"4"3"Job No.Drawn by:Date:OfFile:PE:QC:Revision#DateByGraphic ScaleIn Feet: 1" = 15'081530Demolition Plan2016.195.001AMC/DCS8/11/2016DCSDemoPlanXXCDM-0114St. Mary Catholic ChurchAspen, COForConstruction118 West Sixth Street, Suite 200Glenwood Springs, CO 81601970.945.1004 www.sgm-inc.com 4/17/2017City of Aspen Received 5/2/17Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 20' 0 10 20 40 Geometry Plan 2016.195.001 AMC/DCS 8/11/2016 DCS GeometryPlan XX CGE-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department 15"13" 13"17" 24" Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 5' 0 3 5 10 Hunter Street Sidewalk Plan & Profile 2016.195.001 DCS 8/11/2016 DCS PlanProfile XX CRD-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department Max longitudinal slope is 5%. Raising a small portion of the alley might help obtain the required grades. 15" 13" 20" 20" 30" 30"24"26"24"3"3"33"21" Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 10' 0 5 10 20 Highway-82 Sidewalk Plan & Profile 2016.195.001 DCS 8/11/2016 DCS PlanProfile XX CRD-02 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 20' 0 10 20 40 Erosion Control Plan 2016.195.001 AMC/DCS 8/11/2016 DCS ErosionControlPlan XX CEC-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Stormwater Managment Plan 2016.195.001 DCS 8/11/2016 DCS Admin XX CSW-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By City of Aspen Standard Details 2016.195.001 DCS 8/11/2016 DCS Admin XX CDT-01 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Project Details 2016.195.001 DCS 8/11/2016 DCS Admin XX CDT-02 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department 13" 13" 3" 15" 4" 8" 17" Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 5' 0 2 5 10 Curb Ramp Cross Sections 2016.195.001 DCS 8/11/2016 DCS PlanProfile XX CDT-03 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department 15"13" 13"17" 24" Job No. Drawn by: Date: Of File: PE:QC: Revision#Date By Graphic Scale In Feet: 1" = 5' 0 3 5 10 Striping Plan 2016.195.001 AMC/DCS 8/11/2016 DCS PlanProfile XX CDT-04 14 St. Mary Catholic Church Aspen, CO For Construction 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com 4/17/2017 City of Aspen Received 5/2/17 Building Department City of Aspen Received 5/2/17 Building Department FUSIBLE DISCONNECT SOLID BRICK ENCLOSURE WALL PERFORATED BRICK ENCLOSURE WALL GRADE SLOPES EAST TO WEST 5'-7"17'-2"6'-0"5'-7"BRICK ENCLOSURE WALL GRADE SLOPES AWAY 10'-3" METERING CABINET FUSIBLE DISCONNECT BRICK ENCLOSURE WALL 10'-2"1'-0"6'-0"1'-6"A0.11 1 A0.112 A0.11 3 3 YD DUMPSTERXFMR METERING CABINET FUSIBLE DISCONNECT 9'-11"PERFORATED BRICK WALL A0.11 5 17'-2" 3'-0" 1'-0" 3'-0"3'-0"DUMPSTER TRANSFORMER METERING CABINET WITH FUSIBLE DISCONNECT BEYOND CMU WALL W/ BRICK EXTERIOR FACE PERFORATED BRICK WALL 5'-7"6'-0"1'-6"CHARLES CUNNIFFE ARCHITECTS COPYRIGHT CHARLES CUNNIFFE ARCHITECTSC 610 EAST HYMAN AVE. ASPEN, CO 81611 TEL: 970.925.5590 FAX: 970.920.4557 cunniffe.com SHEET NO. JOB NO.4/20/2017 4:51:09 PMA0.11 1511 ENCLOSURE ELEVATIONSST. MARY CATHOLIC CHURCH533 E. MAIN STREETASPEN, COISSUE: DATE: PERMIT RESUB. 04/17/17 1/2" = 1'-0"1 ENCLOSURE NORTH 1/2" = 1'-0"2 ENCLOSURE EAST 1/2" = 1'-0" 3 ENCLOSURE WEST 1/4" = 1'-0"4 ENLARGED ENCLOSURE PLAN 1/2" = 1'-0"5 ENCLOSURE SOUTH City of Aspen Received 5/2/17 Building Department 4'-9 1/8"6'-2 15/32"The existing transformer vault measures 5ft x 5ft. City of Aspen Received 5/2/17Building Department City of Aspen Received 5/2/17Building Department City of Aspen Received 5/2/17Building Department City of Aspen Received 5/2/17Building Department City of Aspen Received 5/2/17Building Department City of Aspen Received 5/2/17Building Department