610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com
ST. MARY CATHOLIC CHURCH
PERMIT COMMENT RESPONSES - BUILDING
1. See attached letter requesting exemption
2. See attached Civil Drawings from SGM
3. See attached drawing of trash enclosure
4. See attached crawlspace access diagram from Structural Associates
5. Sheet A2.5 & A8.3
Complies with side approach ANSI figure 308.3.2 (b). Also see interior elevation 1/A8.3
6. Sheet A2.5
See sheet A2.4 – wall construction to comply with UL U309 assembly.
7. The window in question is no longer in the project scope
8. Countertop height complies with code
See Sheet A8.3
9. A custom ramp is planned for this space and will be stored in the vesting sacristy; see
attached cutsheet of proposed portable ramp
10. Sheet A2.6
Sink has been relocated per attached drawing
11. Per discussions and additional mechanical drawings attached, no shafts penetrate the
floor of the nave in the proposed design
12. Confessional design under review – not under the purview of the ADA; if possible in the
historic structure, all possible allowances made of accessible access. See attached letter
13. Sheet A2.6
Wheelchair locations have been accommodated per revised sheet.
14. Handrails will be provided as part of the altar rail design with is on-going; handrails are
not required for this project.
15. Sheet A 2.7
Door width revised to 3’-0” wide
16. Sheet A 4.1
Projector has been eliminated from scope of work
City of Aspen
Received
5/2/17
Building Department
610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com
17. Sheet A4.1 & A7.10
Insulation to be a combination of R-38 batt insulation over ~4” closed cell sprayed-on
insulation (R-28). Refer to details 1, 2, 5, & 6/A7.10
An attic ventilation fan has been added as required. Re: sheet M2.6.
18. Sheet A4.1
Permanent raised platform is not to be used for storage and therefore not required to
be rated construction.
19. Sheet A4.2
Dimensions have been provided on revised sheet A4.2
20. Sheet A4.2
Light fixtures and penetrations to be protected and ceiling to rated similar to UL U309
with 2 layers of gypsum board at ceiling.
21. Sheet A2.6
See revised drawing
22. Sheet A6.1
See revised drawing.
23. Sheet A6.1
See revised drawing.
24. Sheet A6.1
See revised drawing.
25. Sheet A6.1
See revised drawing.
26. Sheet A6.1
See revised drawing. Per electrical drawings, outlets are shown on side walls.
27. Sheet A6.1
See elevations 6 & 8 on sheet A6.1
28. Sheet A7.10
See revised drawing.
29. Sheet A6.1
GC option to provide sprinkler heads or non-combustible insulation in concealed
spaces.
30. Sheet A2.6 & A8.4
See revised drawing.
31. General notes and structural design load specifications can be found on Sheet S0.1.
Additional specifications can be found in the book specifications that have been
assembled for this project.
32. Requirements for continuous –vs- periodic inspections are indicated in the text
City of Aspen
Received
5/2/17
Building Department
610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com
descriptions of the Special Inspections table on sheet S0.0.
33. See comment 18 above
34. See attached signed inspection agreement
35. The church employs a full-time maintenance professional who is responsible to clear
snow from the intake wells. Also, there is an existing intake well that has no issue with
remaining clear of snow; the tremendous snowfalls land typically and approximately 7’
away from the face of the church.
36. Minimum headroom below ductwork in basement occupied spaces is 7 ft.
37. Revised drawings show additional exit from boiler room as required.
38. All spaces are provided with natural ventilation meeting IMC requirements, and do not
require mechanical ventilation. Areas not naturally ventilated are restroom groups, which
are provided with mechanical exhaust at code-required rates. Exhaust fan schedule has
been updated to include notes indicating code-required rates.
39. Refer to General Note #20, sheet M0.0, for thermostat mounting height requirement.
40. AHU access hatch requirement has been noted on revised plans. Refer to revised
architectural drawings for hatch design details.
41. Specification section 233113 Metal Ducts has been updated to reflect requirements.
42. AHU access hatch requirement has been noted on revised plans. Refer to revised
architectural drawings for hatch design details.
43. Snowmelt insulation requirement has been noted in mechanical diagrams, and detailed
in civil pavement diagrams.
44. Sacristy sink shall be re-connected to existing sacristy sink discharge line, which routes to
the crawlspace. Expected daily fluid amount is approximately ¼ cup of fluid. The
Scrarium drains into the earth itself beneath the church and is not seen on the civil
drawings.
45. All lighting in the lower level is existing to remain. The main level lighting plan is in the
drawing set
46. Occupancy sensors are being provided to turn off lighting when no occupants are
present.
City of Aspen
Received
5/2/17
Building Department
610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com
47. The exit signs at the ends of the corridor have integral frog eyes. We are also providing
an additional egress fixture (X2) in the middle of the corridor.
48. All exterior lighting has been removed from scope of work. Interior lighting cutsheets
related to the main level will be provided in addition to the main level lighting
COMcheck. See attached letter requesting exemption for Sanctuary-level COMcheck
49. All controls and receptacles that must meet ADA requirements shall be mounted within
44” above finish floor.
50. The assisted listening system is shown on the functional diagram on sheet T3.0.
Attachments:
Numbered building department comments
Letter requesting exemption
Portable ramp cut sheet
Special Inspections Agreement
IBC form
REMP worksheet
Separate files:
o Crawlspace diagram
o Architectural Drawings
o Mechanical Drawings
o Civil Drawings
o Trash Enclosure drawings
City of Aspen
Received
5/2/17
Building Department
0004-2017-ACBK_BuildingComments_1
Page: 9
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 9
The two stairways from the
sanctuary level are open to each
other and come together on the
main level, providing only a
single exit from the sanctuary
level. You exceed the common
path travel distance (132' vs 75'
allowed). Draft a letter to the
building official requesting
exemption from the required two
exits, separation of exits, and
common path travel distance per
2009 3409.
00.Plans.Combined.pdf (50)
Page: 19
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 20
If insulation is perforated, you
must increase the thickness to
achieve an area weighted
average of R-10 minimum.
Typically this requires 3" of
R5/inch rigid insulation.
Page: 24
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 25
If wall surrounding transformer is
modified, contact City of Aspen
Electric.
Page: 4
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 37
You are performing structural
and mechanical improvements
to the crawlspaces. Provide
access to crawlspaces per 2009
IBC 1209.1.
Page: 5
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 38
The new coffee
counter/kitchenette must be
accessible (2009 IBC 1109.4).
Provide a detailed plan and
elevations with clearances and
dimensions shown.
OCCUPANCY CALCULATIONS (IBC 2009)
ROOM / AREA OCC. LOAD OCC LOAD EXISTS REQ'D PROVIDED
MAIN LEVELMEETING ROOM 1,654 SF / 15 SF EA: 110 2 2OFFICE AREA 962 SF / 100 SF EA: 10 1 1KITCHEN451 SF / 200 SF EA: 3 1 2123
SANCTUARY LEVELNARTHEX 187 SF / 7 SF EA: 13 2 2NAVE 18" PER OCC 354 2 2SACRISTIES 222 SF / 100 SF EA: 0 1 1CHOIR LOFT 129 SF/ 7 SF EA 18 1 1SANCTUARY495 SF / 100 SF EA: 4 1 1TOTAL 389
TRAVEL DISTANCES REQUIRED MAX. DISTANCEEXIT ACCESS TRAVEL DISTANCEL (1028.7) MAX. 250' W/ SPRINKLERS 132' FROM SACRISTY AT 2ND LEVEL TO EXIT AT MAIN ENTRANCECOMMON PATH OF TRAVEL MAX 75'
SEPARATION OF EXITS (IBC SECTION 1015.2.2)PER IBC 3409 HISTORIC BUILDINGS ARE EXEMPT FROM THIS REQUIREMENT. IN ADDITION, PROJECT ALTERATIONS TOEXISTING STRUCTURE DECREASES THE OCCUPANT LOAD OF THE NAVE BY HAVING THE NEW CHOIR LOFT OCCUPANTSEXIT DIRECTLY INTO THE EXISTING STAIR AND THEREFORE ARE NOT INCLUDED IN THE NAVE OCCUPANT LOAD.
FIRE PROTECTION (IBC 903.2.1 AND 903.2.1.3)BUILDING IS CURRENTLY PROTECTED WITH FIRE SPRINKLER SYSTEM. EXISTING SYSTEM TO BE EXTENDED FOR NEWPARTITIONS AND CEILING CONFIGURATION ON BOTH FLOOR LEVELS.
PLUMBING FIXTURE COUNTSAREA WATER CLOSETS REQ'D.PROVIDEDSANCTUARY LEVEL (PRIMARY OCCUPANCY)390 TOTAL OCCUPANTS = 195M + 195W 2 M 3 W 3 M 3 W
A-3: M=1 per 150: W= 1 per 75
** CHURCH FUNCTIONS WOULD NOT ALLOW SIMULTANEOUS USE OF SANCTUARY AND MEETINGS ROOMS. THEREFORE,SANCTUARY LEVEL HAS BEEN USED FOR CALCULATIONS.
EXIT REQUIREMENT CALCULATIONS (PER IBC 1005.1 & 10286.1.4)
EXIT OCC. LOAD CALC OCCUPANTS WIDTH REQUIRED @.2"/OCC WIDTH PROVIDEDPROVIDEDEXIT A 50% OF NAVE 215 43" 72"50% OF MEETING RM 1015% OF MTG RM 102-107
EXIT B 50% OF NAVE 214 42.8" 72"50% OF MEETING RM 1015% OF MTG RM 102-107
EXIT C 90% OF MTG RM 102-108 96 19.2" 36"
BUILDING CODE SUMMA
APPLICABLE CODES:AS ADOPTED, MOD
2009 INTERNATIONAL BU 2009 INTERNATIONAL PL 2009 INTERNATIONAL ME 2014 NATIONAL ELECTR 2009 INTERNATIONAL FU 2009 INTERNATIONAL FIR 2009 INTERNATIONAL EN
ICC/ANSI A117.1.2003
CONSTRUCTION TYPE:TYPE III-B (IBC 200 ALL MASONRY EXT INTERIOR CONSTR
USE AND OCCUPANCY C MAIN OCCUPANCY SECONDARY:
BUILDING HEIGHT AND A ALLOWABLE AREA: ALLOWABLE HEIG
ACTUAL AREA: ACTUAL HEIGHT:
FIRE PROTECTION SYST BUILDING IS FULLY
BUILDING HEIGHT AND A FRONTAGE AREA IN SPRINKLER AREA A
MIXED USE AND OCCUP CONSIDERED AS N MOST RESTRICTIVE BUILDING FALLS W NO FIRE-RESISTIVE
The two stairwaysfrom the sanctuary
level are open to each
other and cometogether on the main
level, providing only asingle exit from the
sanctuary level. You
exceed the common
path travel distance
(132' vs 75' allowed).Draft a letter to the
building officialrequesting exemption
from the required two
exits, separation ofexits, and common
path travel distanceper 2009 3409.
If insulation is
perforated, you must
increase the thickness
to achieve an area
weighted average of
R-10 minimum.
Typically this requires
3" of R5/inch rigid
insulation.
If wall surrounding
transformer is
modified, contact City
of Aspen Electric.
STORAGE
STORAGE
BOILERROOM
CRAWLSPACE
CRAWLSPACE
CRAWLSPACE
R D A T
EL.= 89'-7 1/2"
COORDINATE WALL PENETRATIONSWITH DUCTWORK, RE: MECH
1
PROPOSED BASEMENT LEVELCONSTRUCTION PLAN
You are performing
structural andmechanicalimprovements to thecrawlspaces. Provide
access to crawlspacesper 2009 IBC 1209.1.
9
4
2
A4.2
VEST.120
120B
120A A
B
STOR121
A3.5
1
EL.= 100'-0"
202
233
2'-6 1/2"8'-3 1/16"6"
ALIGN, TYP.
231
234232
REFER TO A1.0 AND A3.5- A3.10FOR PROPOSED FRONT PORCHAND STEPS DESIGN.6"4'-1 1/4"6"4'-1 1/4"6"6'-7 3/4"5'-7 1/2"T" +/-DISPLAYDISPLAYREFDISPLAYALIGN, TYP.
4'-7 1/4"2'-1 9/16"4'-1 1/2"4'-1 1/2"
ALIGN, TYP.
246
1'-4" 2'-3" 2'-2"EQ3'-7 3/8"EQ1'-4"121
42"H WALL
A
A
TEL: 97
FAX: 9 Y CATHOLIC CHURCHThe new coffee
counter/kitchenette
must be accessible
(2009 IBC 1109.4).
Provide a detailed
plan and elevations
with clearances and
dimensions shown.
1
2
3
4
1
SEE ATTACHED LETTER
SEE UPDATED CIVIL
DRAWINGS
SEE UPDATED TRASH
ENCLOSURE DRAWINGS
SEE ATTACHED
CRAWLSPACE DIAGRAM
SHEET A2.5 & A8.3
5
City of Aspen
Received
5/2/17
Building Department
Page: 5
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 38
Enclosed usable areas beneath
stairs must be protected with 1
hour fire rated walls and soffits
per 2009 IBC 1009.6.3. Indicate
this requirement on the plans
and put listed assemblies on the
plans.
Page: 5
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 38
Provide the U factor of the new
windows complying with 2009
IECC 502.3 or include the
windows in your letter to the
building official requesting
historic exemption per 2009
IECC 101.4.2.
Page: 5
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 38
If the reception counter is used
for any sales or for the
distribution of goods or services
it must be accessible (2009 IBC
1109.11.3).
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
Provide an accessible route to
the platform (2009 IBC
1108.2.8).
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
The centerline of the alter server
vesting sink must be at least 24"
off the finished face of the
sidewall to allow for a 48" long
accessible clearspace to be
centered for a parallel approach.
(ICC/ANSI A117.1-2003 606.
CA8.3
4
1
3
2 1A4.1
ENTRY100
MEETINGRM102
HALL117
RECEPT118
OFFICE119
120B
120A
117
119
111A
A8.3
8
6
5
7
100
E
A
B
D
MEETINGRM101
STOR122
122
101A102A
101B101C102C102B
A6.1
1
STOR121
A3.5
1
EL.= 100'-0"
202
203
217
219
233
2'-6 1/2"8'-3 1/16"2'-1 7/16"12'-5"
10'-3 1/4"5'-2"
3'-7"3'-8"4'-4"
ALIGN ALIGN, TYP.
231
231
234
234
232
A
A
A
A
A
1'-8"8A9.1
REFER TO A1.0 AND A3.5- A3.10FOR PROPOSED FRONT PORCHAND STEPS DESIGN.6"4'-1 1/4"6"4'-1 1/4"6"6'-7 3/4"5'-7 1/2"EXIST3'-6 1/8" +/-EXIST3'-6 1/8" +/-DISPLAYDISPLAYREFDISPLAYALIGN, TYP.
4'-7 1/4"2'-1 9/16"4'-1 1/2"4'-1 1/2"
ALIGN, TYP.4'-10"246
246 246
1'-4" 2'-3" 2'-2"EQ3'-7 3/8"EQ1'-4"121
42"H WALL
A
A
1'-8"
SHEET NO.
JOB NO.
PROPOSEDCONSTRUCTIONPLANSST. MARY CATHOLIC CHUR 533 E. MAIN STREETASPEN, COLORADOISSUE: DATE:50% DD SET 09/02/16100% DD SET 10/11/16DD ADDENDUM #1 11/14/1650% CD SET 12/20/16PERMIT DRAWINGS 1/12/17
Enclosed usable areasbeneath stairs must beprotected with 1 hour
fire rated walls andsoffits per 2009 IBC1009.6.3. Indicate thisrequirement on theplans and put listedassemblies on theplans.
6 7 8
9
2A4.2
ANY
ORTITIONOUSTIC
FOR OFSHALL
TABLE.OWS,
RECEIVE
MS TO BE
TION IN
O
XISTING
EFER
CONSTRUCTION KEYNOTES
202 3CM GRANITE TRANSACTION TOP W. WOOD TRIM SURROUND AT OPENING. RE: ELEVS.203 3CM GRANITE COUNTER WITH 4" BACKSPLASH. STAINED WD BASE CABINETS W. RAISED PANEL DOORS.213 3CM GRANITE COUNTER TOP W. CUSTOM WOOD BASE CABIENTS AND UPPER CABINETS.217 DUAL-HEIGHT ADA DRINKING FOUNTAIN218 EXTEND (E) LANDING WITH 2X WD FRAMING AND PLYWOOD SUBSTRATE TO ALIGN WITH EDGE OF DOOR TRIM.MATCH EXISTING HEIGHT.219 P.LAM UPPER CABINETS, RE: ELEV.220 NEW OPERABLE PARTITION AND TOP TRACK, TYP OF (6). BASIS OF DESIGN: HUFCOR-642. UTILIZE (E) STRUCT.SUPPORTS ABOVE CEILING.221 (E) ROLL DOWN GRILLE AT KITCHEN TO REMAIN.
222 INFILL STUD WALL. MATCH ADJACENT CONSTRUCTION AND WALL TEXTURE.231 NEW STAINED GLASS WINDOW IN (E) OPENING. PROVIDE LINEAR LED BACK LIGHT FIXTURE. PROVIDE NEWACCESS PANEL ON INSIDE.232 NEW DRYWALL PILASTER 14" DEPTH.233 NEW GRANITE COFFEE COUNTER.234 REFINISH (E) WD STAIRS AND HANDRAILS. RE: FINISH PLANS.237 SAND & REFINISH (E) WDW FRAMES AND WDW SASHES, INSIDE AND OUT AND DOOR CASING/TRIM. REPLACENON-HISTORIC HDWARE W. ACCURATE HDWARE.238 NEW STORM WDWS ON EXTERIOR OF ALL WINDOWS, BOTH LEVELS.241 NEW CONCRETE STEPS AND SIDEWALK. RE: SITEPLAN244 LAVATORY COUNTER (ST-2)246 MULTIPLE 18" DEEP WOOD SHELVES (PAINT GRADE)AT 16" O.C. VERTICALLY.
Provide the U factor ofthe new windows
complying with 2009
IECC 502.3 or include
the windows in your
letter to the building
official requesting
historic exemption per
2009 IECC 101.4.2.
CA8.3
4
1
3
2 1A4.1
ENTRY100
MEETINGRM102
MEETINGRM103
MEETINGRM104
MEETINGRM105
WOMEN110
HALLWAY111
MEN116
OFFICE113
OFFICE114
HALL115
HALL117
RECEPT118
OFFICE119
120A
117
119114
113A
110
111A
116
A8.3
8
6
5
7
100
E
A
B
D
MEETINGRM101
STOR122
122
101A102A103A104A105A
101B101C102C103C104C102B103B104B105B
CONF RM112
A6.11
112
105C
113B
STOR121
A3.5
1
EL.= 100'-0"
202
203
217
219
238
220
233
2'-6 1/2"8'-3 1/16"2'-1 7/16"12'-5"12'-5"12'-5"11'-11"9'-3 3/4"5'-0"GN
6'-0 1/4"ALIGN10'-3 1/4"5'-2"
3'-7"3'-8"4'-4"
ALIGN ALIGN, TYP.
231
231
234
234
232
244
244B
A A A
A
A
A
A A
A
A
B
AA
238 237
237
1'-8"8A9.1
REFER TO A1.0 AND A3.5- A3.10FOR PROPOSED FRONT PORCHAND STEPS DESIGN.6"4'-1 1/4"6"4'-1 1/4"6"6'-7 3/4"5'-7 1/2"EXIST3'-6 1/8" +/-EXIST3'-6 1/8" +/-DISPLAYDISPLAYREFDISPLAYALIGN, TYP.
4'-7 1/4"2'-1 9/16"4'-1 1/2"4'-1 1/2"
ALIGN, TYP.4'-10"246
246 246
1'-4" 2'-3" 2'-2"EQ3'-7 3/8"EQ1'-4"121
42"H WALL
A A
1'-8"
COPYRIGHT CHARLES CUNNIFFE ARCHITECTSC
SHEET NO.
JOB NO.
A2.5
PROPOSEDCONSTRUCTIONPLANSST. MARY CATHOLIC CHU 533 E. MAIN STREETASPEN, COLORADO 3/16" = 1'-0"1 PROPOSED MAIN LEVEL CONSTRUCTION PLAN
ISSUE: DATE:50% DD SET 09/02/16100% DD SET 10/11/16DD ADDENDUM #1 11/14/1650% CD SET 12/20/16PERMIT DRAWINGS 1/12/17
If the receptioncounter is used for anysales or for thedistribution of goods orservices it must beaccessible (2009 IBC1109.11.3).
1 2 3 4
1
A4.
VESTING /SACRISTY208
A8.313
14
15
16
A3.6
EL.= 114'-0 1/2"
EL.= 114'-0 1/2"
213
214
213
215
212
208
209212
208
208
239
238
237
3'-9 1/4"8'-4 1/8"11'-2 5/8"3'-9 1/4"2'-4"1'-8"204
REF
A
A
Provide an accessibleroute to the platform
(2009 IBC 1108.2.8).
ALTARSERVERVESTING209
A8.39
11
10
12
EL.= 114'-0 1/2"
213
214
213
215
209
237
238 11'-2 5/8"4'
212
212
A
3/16" = 1'-0"1 SANCTUARY
The centerline of the
alter server vesting
sink must be at least
24" off the finished
face of the sidewall to
allow for a 48" long
accessible clearspace
to be centered for a
parallel approach.
(ICC/ANSI
A117.1-2003 606.
6
7
8
9
2
SHEET A2.5
this window no
longer in scope
SHEET A8.3
SEE ATTACHED
CUTSHEET
10
SHEET A2.6
City of Aspen
Received
5/2/17
Building Department
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
The shafts for the ductwork are
not shown on the main level
plan. How do they connect to the
lower level mechanical area and
maintain fire rated shaft
continuity? Ductwork penetrating
non-fire-resistance-rated floor
assemblies must be protected
with either a shaft or fire
dampers at each floor line if
connecting 3 levels. If only
connecting 2 levels, protect the
annular space. (2009 IB
716.6.3).
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
Provide an accessible route into
and out of both rooms of the
confessional. One is a public
access area, the other is an
employee work area. (2009 IBC
1103.2.3, 1104.2)
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
You have seating for 354
people, requiring 6 wheelchair
spaces. Spaces must be
dispersed throughout the nave
and each space requires a
companion seat. If an audio
amplification system is used, an
assistive listening system is
required. (2009 IBC 1108.2)
Page: 6
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 39
Provide handrails to the platform
(2009 IBC 1012).
Page: 7
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 40
Door 302 is shown as 2'8" in the
door schedule. It must allow 32"
clear between jamb and leaf
when open to 90 degrees (2009
IBC 1008.1.1).
UP
1 2 3 4 5 9
A8.2
2
4
3
1
1A4.2
2A4.2
STAIR201
STOR202
STAIR203
NARTHEX204
VEST205
NAVE206SANCTUARY207
VESTING /SACRISTY208
ALTARSERVERVESTING209
(E) ROOF BELOW
205
CONFESSIONAL
A8.313
A8.39
14
15
16
11
10
12
B
C
C
A
A
204B
204A
A9.13
A3.61
A3.7
1
EL.= 114'-0 1/2"
EL.= 115'-2 1/2"
EL.= 114'-0 1/2"
CONFESSIONALEL.= 114'-0 1/2"
202A
213
214
213
215
213
214
213
215
212
250
212
208
209
209
209
204
205
206
211
211
212
208
210
210
3'-8" 1'-9"
2'-7"4'-6"7 1/4"
ALIGN
208
209
239
239
236
236
238
237
237
238 234
234
24
EL.= 112'-10 1/2"
3'-9 1/4"8'-4 1/8"11'-2 5/8"3'-9 1/4"10'-6"10'-6"3'-9 1/4"11'-2 5/8"4'-5"8'-4"8'-4"4'-5"EL.= 113'-4 1/2"
EL.= 113'-4 1/2"204
2'-4"1'-8"2'-4"4'-4"204
204
EL.= 112'-10 1/2"
202B
212
ALIGN
ALIGN
5A8.4
212 EQ.EXIST3'-0 3/4"
5'-10"1'-10"2'-7"
1'-2"
2'-5 1/2"3'-4"4'-8"1'-8"1'-2"REF
V.I.F.50'-11 3/4"A9.21
212
249
212
212
11A7.10
245
2452'-6"2'-6"248
248
4'-0"
A
A
AA
237 237
237
237
237
237
252
252
A
A
A
A2.73
254
254
254
3/16" = 1'-0"1 SANCTUARY LEVEL CONSTRUCTION PLAN
250 NEW ALTAR, RE: DETAILS.251 EXISTING ENTRY CANOPY TO REMAIN.252 STAINED WOOD CASED OPENING254 PROVIDE LEVELING COMPOUND UNDER PEW AREA TO ACHIEVE LEVEL TRANSITION WITH NEW FINISHES IN AISLES.COORDINATE WITH FINISH PLANS.
The shafts for the ductwork arenot shown on the main levelplan. How do they connect tothe lower level mechanical areaand maintain fire rated shaftcontinuity? Ductwork penetratingnon-fire-resistance-rated floorassemblies must be protectedwith either a shaft or firedampers at each floor line ifconnecting 3 levels. If onlyconnecting 2 levels, protect theannular space. (2009 IB716.6.3).
STAIR203
E
D
CONFESSIONAL
C
A9.1
3
CONFESSIONAL
202A
205
211
210
ALIGN
2344'-5"EL.= 113'-4 1/2"204
ALIGN
5A8.4EQ.245
248
237
237
251
252
254
CTION PLAN
Provide an accessible
route into and out ofboth rooms of the
confessional. One is a
public access area,
the other is an
employee work area.
(2009 IBC 1103.2.3,
1104.2)
2
You have seating for 354 people,
requiring 6 wheelchair spaces.
Spaces must be dispersed
throughout the nave and each
space requires a companion seat. If
an audio amplification system is
used, an assistive listening system
is required. (2009 IBC 1108.2)
1 2 3 4 5
A8.2
2
41
1
A4.2
NAVE206SANCTUARY
VESTING /SACRISTY208
A8.313
14
15
16
A3.6
1
A3.7
1
EL.= 114'-0 1/2"
EL.= 115'-2 1/2"
EL.= 114'-0 1/2"
213
214
213
215
212
250
208
209212
208
208
239
236
238
237
EL.= 112'-10 1/2"
3'-9 1/4"8'-4 1/8"11'-2 5/8"3'-9 1/4"10'-6"2'-4"1'-8"204
5'-10"1'-10"2'-7"
1'-2"
2'-5 1/2"3'-4"4'-8"
REF
V.I.F.0'-11 3/4"A9.2
1
212
11 2'-6"6"248
4'-0"
A
A
254
249 MODIFY EXISTING REREDOS AND HIGH ALTAR. RE: DETAILS.250 NEW ALTAR, RE: DETAILS.251 EXISTING ENTRY CANOPY TO REMAIN.252 STAINED WOOD CASED OPENING254 PROVIDE LEVELING COMPOUND UNDER PEW AREA TO ACHIEVE LEVEL TRANSITION WITH NEW FINISHES IN AISLES.COORDINATE WITH FINISH PLANS.
Provide handrails to
the platform (2009 IBC
1012).
DN D
OPEN TOBELOW
BALCONY303
301
224
223 3
A7.111'-3
302 OPE BEL
A
A7.10
9
255
Door 302 is shown as
2'8" in the door
schedule. It must allow
32" clear between
jamb and leaf when
open to 90 degrees
(2009 IBC 1008.1.1).
11
12
13
14
3
no shafts penetrate
floor; all ductwork
goes UP
see attached letter
handrails to be
provided as part of
altar rail design
15
SHEET A2.6
SHEET A2.7
City of Aspen
Received
5/2/17
Building Department
Page: 19
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 52
Detail how you will air seal
between the projector screen
opening and the attic.
Page: 19
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 52
Indicate the type of insulation
used in the attic and
demonstrate how the attic is
vented. If not vented, provide
dew point calculations.
Page: 19
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 52
Verify that the space under the
platform will not be used for
storage or anything other than
equipment, plumbing, and
electrical. Otherwise you must
frame the platform with 1 hour
fire rated construction. (2009
IBC 410.4)
Page: 20
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 53
Provide new stair tread and riser
dimensions.
Page: 20
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 53
Protect penetrations of 1 hour
enclosed space under stair.
CHOIR LOFT LEVEL
122'-4 1/2"
EXIST. BELFRY LEVEL
136'-3 1/2"
NEW CEILING
RECONSTRUCT SANCTUARY ARCH, RE: 1/A4.2 FOR D
NEW MOTORIZED PROJECTOR SCREEN. TYP OF 2
DEMO AND RECONSTRUCT CURVED CEILING, 3 SIDE
HIGH ALTAR TO BE DISASSEMBLED, PROTECTED, AN OFFSITE STORAGE BY OWNER.
NEW PLATFORM FRAMING,
MECH DUCTWORK, RE: MECH
Detail how you will air
seal between the
projector screen
opening and the attic.
1
EXISTING TRUSS PACKS IN ATTIC
NEW WD TRIM AT COFFERED CEILING, RE: DETAILS
RECESSED SLOT FOR CONCEALED LIGHT FIXTURE
PROVIDE NEW R-60 INSULATION THROUGHOUT ENTIREATTIC SPACE ABOVE CEILING AIR BARRIER.
6
A
T
F
Indicate the type of
insulation used in the
attic and demonstrate
how the attic is
vented. If not vented,
provide dew point
calculations.
MAIN LEVEL
100'-0"
SANCTUARY LEVEL
112'-10 1/2"
SANCTUARY207
CHOIR LOFT LEVEL
122'-4 1/2"
CRAWLSPACE
HIGH ALTAR TO BE DISASSEMBLED, PROTECTED OFFSITE STORAGE BY OWNER.
NEW PLATFORM FRAMING,RE: STRUC
INFILL WALL WHERE DOOR WAS REMOVED.
EXTEND LANDING, RE: PLAN
MECH GRILLE,RE: MECH
MECH DUCTWORK,RE: MECH
Verify that the space
under the platform will
not be used for
storage or anything
other than equipment,
plumbing, and
electrical. Otherwise
you must frame the
platform with 1 hour
fire rated construction.
(2009 IBC 410.4)
SANCTUARY LEVEL
112'-10 1/2"
CHOIR LOFT LEVEL
122'-4 1/2"
NEW STAIR AND HANDRAIL
NEW FLOOR STRUC, RE: STRUC
(E) WD WAINSCOT TO REMAIN
NEWWALL MNT'D STAINED
WD HANDRAIL
Provide new stair
tread and riser
dimensions.
MAIN LEVEL
100'-0"
SANCTUARY LEVEL
112'-10 1/2"
CHOIR LOFT LEVEL
122'-4 1/2"
ENTRY100
STAIR203 STAIR201
CRAWLSPACE
STOR202
BALCONY303
STOR121
OOD GUARDRAILBALUSTERSOIR LOFT RAILING
INSTALL (2) HISTORIC FXITURESFROM CHURCH
NEW STAIR AND HANDRAIL
NEW FLOOR STRUC, RE: STRUC
NEW FIN. ON EXISTING STAIR
FINISH AND PROTECT UNDERSIDEOF STAIR AS STORAGE SPACE,(2) LA OF GYP. BD.
A7.108
A7.112A7.11
3
(E) WD WAINSCOT TO REMAIN
NEWWALL MNT'D STAINEDWD HANDRAIL
1 3/16" = 1'-0"2 BUILDING SECTION - FACING SOUTH
Protect penetrations of1 hour enclosed space
under stair.
16
17
18
19
4
PROJECTOR
ELIMINATED FROM
SCOPE
20
SHEET A4.1 & A7.10
AND MECHANICAL
DRAWINGS
SHEET A4.2
SHEET A4.2
SHEET A2.6
City of Aspen
Received
5/2/17
Building Department
Page: 20
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 53
Provide handrail extensions and
returns per 2009 IBC 1012.6.
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Dimension all grab bars, mirrors,
and accessories.
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Show and dimension clear
spaces at one urinal and
lavatory in each toilet room as
well as turnaround space.
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Dimension the accessible
clearances.
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Dimension height of accessible
urinal rim and toilet seat
CHOIR LOFT LEVEL
122'-4 1/2"
FROM CHURCH
NEW STAIR AND HANDRAIL
NEW FLOOR STRUC, RE: STRUC
NEWWALL MNT'D STAINED
WD HANDRAIL
Provide handrail
extensions and returns
per 2009 IBC 1012.6.4'-6"A6.110
TILE TO 48
PARTITION ASSCHEDULED
TILE BASE
O 48"2'-10"4'-6"10A6.1
TILE UP TO 48" AFF
PARTITION AS SCHEDULED
TILE BASE REMOVEABLEAPRON WD PANEL2'-10"4'-0"TILE UP TO 48" AFF
TILE UP TO 48" AFF
WEST ELEVATIONNORTH ELEVATIONEAST ELEVATION
1/4" = 1'-0"7
WEST ELEVATIONMEN 116
1/4" = 1'-0"8
WEST ELEVATIONMEN 116
1/4" = 1'-0"6
SOUTH ELEVATIONMEN 116
Dimension all grabbars, mirrors, andaccessories.
TA-10 18" GRAB BAR BOBRICK B-5806 X 18TA-11 WOOD GRAIN LAMINATE PARTITION
MEN116
WOMEN110
A6.1 8
9
7
6
A6.1
5
2
3
4 1'-6" EQ EQ5'-0" CLR.6'-10 3/8"
5'-0" CLR 3'-1" 3'-1"7'-1 3/4" 5'-0" CLR.
11'-3"
2'-1 1/2" 3'-6" 3'-6" 2'-1 1/2"1'-4" 2'-4" 1'-4"
TA-7
TA-6TA-2
TA-5TA-4
TA-10
TA-1
TA-3
TA-9
TA-8 TA-8
TA-10TA-1TA-2
TA-6
TA-8TA-7
TA-9
TA-11
TA-11
TA-9
4'-6"TILE TO 48" AFF
TILE UP TO 48" AFF
SHEET N
JOB NO
EN FLO ST. MARY CATHO
1/4" = 1'-0"
SOUTH ELEVATION
MEN 116
ISS 50% DD S 100% DD DD ADDEN 50% CD S PERMIT D
Show and dimension
clear spaces at one
urinal and lavatory ineach toilet room aswell as turnaround
space.
REMOVEABLE WD APRON
PER ADA CLEARANCES
PROVIDE PLYWD BACKING IN WALL FOR
ANCHORAGE OF WALL MOUNTED ITEMS.
NOTE BACKERBOARD AND TILE WALLFINISH, PER ELEVATIONS2'-10" TO RIM OF SINK4"2"1 3/4"610 EAST HY
ASPEN, CO
TEL: 970.925
FAX: 970.92
cunniffe. RCHAT LAVATORY
Dimension the
accessible clearances.4'-0"4'-0"7 1/4" = 1'-0"8
WEST ELEVATION
MEN 116
Dimension height of
accessible urinal rim
and toilet seat
21
22
23
24
5
25
SHEET A6.1
SHEET A6.1
SHEET A6.1
SHEET A6.1
SHEET A6.1
City of Aspen
Received
5/2/17
Building Department
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Outlets must be within
accessible reach range. Max
height to center 44" if sink is
greater than 20" deep. If less,
then 48" max.
Page: 21
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 54
Provide interior elevations of
women's accessible water closet
with dimensions.
Page: 24
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 57
Dimension the guard height (42"
min).
Page: 24
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 57
Concealed combustible space
will require sprinkler protection if
space between bottom of joist
and top of dropped ceiling
framing is 6" or greater (NFPA
13 section 8.15.1.2.3)
Page: 29
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 62
Provide handrails on both sides
of all new or altered stairs (2009
IBC 1009.12).
PARTITION PER PLAN, RE: ELEVATIONSFOR MIRRORS
MOUNT OUTLETS 4" ABOVE COUNTERTOPTO BOT OF COVER PLATE. RE: ELEC.
BACKSPLASH TRIM AT SIDES AND BACK.PROVIDE SEALANT WHERE MEETS TILE.
SINK, RE: SPECS.COUNTERTOP, RE: FINISH SCHED
4""CH CU AR
610
cun
Outlets must be within
accessible reach
range. Max height to
center 44" if sink is
greater than 20" deep.
If less, then 48" max.
TA-1 SEMI RECESSED TOILET TISSUE DISPENSOR BOBRICK B-3888TA-2 42" GRAB BAR BOBRICK B-5806 X 42TA-3 RECESSED SANITARY NAPKIN DISPOSAL BOBRICK B-353TA-4 PARTITION MNTD DUAL SANITARY NAPKIN DISPOSAL BOBRICK B-354TA-5 PARTITION MNTD DUAL TOILET TISSUE DISPENSOR BOBRICK B-386TA-6 36" GRAB BAR BOBRICK B-5806 X 36TA-7 MIRROR, POLISHED EDGES, FRAMELESS BOBRICK B-290TA-8 SEMI RECESSED PAPER TOWEL DISPENSOR BOBRICK B-359TA-9 RECESSED BABY CHANGING STATION BOBRICK KB110TA-10 18" GRAB BAR BOBRICK B-5806 X 18TA-11 WOOD GRAIN LAMINATE PARTITION
TOILET ACCESSORIES SCHEDULE
MEN116
WOMEN
A6.1 8
9
7
6
3 1'-6" EQ EQ5'-0" CLR.6'-10 3/8"
5'-0" CLR 3'-1" 3'-1"5'-0" CLR.1'-4" 2'-4" 1'-4"
TA-6TA-2
TA-5TA-4
TA-10
TA-1
TA-3
TA-10TA-1TA-2
TA-6
TA-8
TA-7
TA-9
TA-11
TA-11
TA-9TILE UP TO 48" AFF
ENLARGE FLOOR PLA ST. MARY CATHOLIC CHURC 533 E. MAIN STREET 1" = 1'-0"10 SECTION AT LAVATORY
1/4" = 1'-0"6
SOUTH ELEVATION
MEN 116
ISSUE: D
50% DD SET 0
Provide interiorelevations of women'saccessible watercloset with
dimensions.
5 1/2"
Dimension the guard
height (42" min).
PLYWD OVER WOOD FRAMINGRE: STRUC
FIELD TILE, RE: FINISH PLAN
1" = 1'-0"8 DETAIL AT EXIST FLOOR
Concealed
combustible space will
require sprinkler
protection if spacebetween bottom ofjoist and top ofdropped ceilingframing is 6" or greater
(NFPA 13 section
8.15.1.2.3)
NEW STEP, RE: PLAN
MODIFY EXISTING WALL HEIGHTAND WOOD WALL CAP TO MATCHNEW FLOOR STEP CONFIGURATION
EDGE OF EXISTING WALL TO REMAIN
MATCH (E) WD BASE
REMOVE PORTION OF EXISTINGWALL TO ACCOMODATE NEWWALL HEIGHT
Provide handrails on
both sides of all new or
altered stairs (2009
IBC 1009.12).
26
27
28
30
6
29
SHEET A6.1
SHEET A6.1
SHEET A7.10
SHEET A6.1
SHEET A2.6 & A8.4
City of Aspen
Received
5/2/17
Building Department
Page: Sheet: S0.0 - GENERAL NOTES
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 70
Provide a general notes sheet
with structural design load
specifications.
Page: Sheet: S0.0 - GENERAL NOTES
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 70
Revise special inspection
schedule to note which
inspections require continuous
vs. periodic inspection.
Page: Sheet: S2.6 - PROPOSED - SANCTUARY FRAMING
PLAN
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 80
Concealed combustible space
under the platform must be
provided sprinkler protection
(NFPA 13 section 8.15.1.2.3).
Page: Sheet: S7.1 - STEEL DETAILS
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 85
Provide a signed special
inspection agreement form for
the structural steel welds, high
strength bolting, and epoxy
anchors.
Page: 35
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 92
How will the outside air intake
and combustion air intake wells
be kept clear of snow?
Submitted photos show snow up
against this side of the building.
Move intakes to be above snow
level.
S8.2 WOOD DETAILS
Provide a general notes sheet with structural design load
specifications.
ABBREVIATIONSINSUL INSULATION AB ANCHOR BOLTINT INTERIOR ABV ABOVEJNT JOINT ADH ADHESIVEJST JOIST ALT ALTERNATELOCN LOCATION ARCH ARCHITECTURAL
LSL LAMINATED STRAND LUMBER AWS AMERICAN WELDING SOCIETYLVL LAMINATED VENEER LUMBER @ AT_ON CENTERLWC LIGHT WEIGHT CONCRETE BLW BELOWMATL MATERIAL BLDG BUILDINGMAX MAXIMUM BLK BLOCK
MECH MECHANICAL BLKG BLOCKINGMFS MANUFACTURER BM BEAMMIN MINIMUM B.O. BOTTOM OF(N) NEW BRG BEARINGNA NOT APPLICABLE BOTT BOTTOMN.I.C. NOT IN CONTRACT BTWN BETWEENNO, # NUMBER C.I.P. CAST IN PLACE
NS NEAR SIDE CL, ¡ CENTERLINEN.T.S. NOT TO SCALE CLG CEILINGNWC NORMAL WEIGHT CONCRETE CLR CLEARO/ OVER COL COLUMNOC ON CENTER CONC CONCRETE
OH OPPOSITE HAND CONN CONNECTIONOPP OPPOSITE CONSTR CONSTRUCTIONOPNG OPENING CONT CONTINUOUSOSB ORIENTED STRAND BOARD CP COMPLETE PENETRATIONOWSJ OPEN WEB STEEL JOISTS CTR CENTERPDF POWER DRIVEN FASTENER DBL DOUBLEPERP PERPENDICULAR DET DETAIL
PERIM PERIMETER DF DOUGLAS FIRPL, ¢ PLATE DF-L DOUGLAS FIR-LARCHPLWD PLYWOOD DIA DIAMETERPSL PARALLEL STRAND LUMBER DIAG DIAGONALPT POST TENSIONED OR DIM DIMENSION
PRESSURE TREATED DWG DRAWINGREF REFERENCE (E) EXISTINGREINF REINFORCING EA EACHREQ'D REQUIRED EF EACH FACERET RETAINING EL ELEVATIONRO ROUGH OPENING EMBED EMBEDMENTRDWD REDWOOD EN EDGE NAIL
S.A.D. SEE ARCHITECTURAL DRAWINGS EQUIP EQUIPMENTSCHED SCHEDULE EW EACH WAYSEL STRUCT SELECT STRUCTURAL EXP EXPANSION
SFRS SEISMIC FORCE RESISTINGSYSTEM EXT EXTERIOR
SHTG SHEATHING FNDN FOUNDATIONSIM SIMILAR FIN FLR, F.F. FINISHED FLOOR
S.O.G. SLAB ON GRADE FLR FLOORSPEC SPECIFICATIONS F.O. FACE OFSQ SQUARE FRMG FRAMINGSS STAINLESS STEEL FS FAR SIDESTD STANDARD FT FOOTT & B TOP AND BOTTOM FTG FOOTINGT & G TONGUE AND GROOVE GA, ga GAGE
TN TOE NAIL GALV GALVINIZEDT.O. TOP OF GR GRADETYP TYPICAL GL GLULAMU.O.N. UNLESS OTHERWISE NOTED GYP BD GYPSUM BOARDVERT VERTICAL HDG HOT DIPPED GALVANIZED
WP WATER PROOFING OR HDR HEADERWORK POINT HGR HANGERWT WEIGHT HK HOOKWWF WELDED WIRE FABRIC HORIZ HORIZONTALW/ WITH HSB HIGH STRENGTH BOLTXS EXTRA STRONG HSS HOLLOW STRUCTURAL STEELXXS DOUBLE-EXTRA STRONG INFO INFORMATION
CHARLESCUNNIFFEARCHITECTS
610 EAST HYMAN AVE.ASPEN, CO 81611TEL: 970.925.5590FAX: 970.920.4557
cunniffe.com
GENERAL NOTESST. MARY CATHOLIC CHURCH533 E. MAIN STREETASPEN, COLORADOSPECIAL INSPECTIONSSPECIAL INSPECTION AND TESTINGA QUALIFIED SPECIAL INSPECTOR SHALL BE RETAINED TOPROVIDE SPECIAL INSPECTION. GFDS ENGINEERS SHALLNOT PROVIDE SPECIAL INSPECTION. SPECIALINSPECTION SHALL BE CARRIED OUT IN ACCORDANCEWITH IBC '09 CHAPTER 17.
INSPECTIONBY:
STEEL CONSTRUCTION (REF TABLE 1704.3) SP. INSP.HIGH-STRENGTH BOLTS, NUTS, AND WASHERS (PERIODIC)WELDS REQUIRING CONTINUOUS INSPECTION:CJP & PJP GROOVEMULTIPASS FILLETSINGLE-PASS FILLET > Ä"PLUG AND SLOTREINFORCEMENT BARS IN CONCRETEWELD REQUIRING PERIODIC INSPECTION:SINGLE PASS FILLET = Ä"FLOOR AND ROOF DECKWELDED STUDS IN STRUCTURAL DIAPHRAGMSCONCRETE CONSTRUCTION (REF TABLE 1704.4)CONCRETE SAMPLING - SLUMP, AIR CONTENT, ANDTEMPERATURE OF CONCRETE (CONTINUOUS)BOLTS INSTALLED IN CONCRETE (CONTINUOUS)CONCRETE AND SHOTCRETE PLACEMENT(CONTINUOUS)REINFORCING STEEL INCLUDING PLACEMENT(PERIODIC)POST INSTALLED ANCHORS (PERIODIC)VERIFYING USE OF REQUIRED DESIGN MIX (PERIODIC)LEVEL 1 MASONRY CONSTRUCTION (REF. TABLE 1704.5.1)MASONRY COMPRESSIVE STRENGTH PRIOR TOCONSTRUCTION (PERIODIC)SITE-PREPARED MORTAR AND MORTAR JOINTS(PERIODIC)PLACEMENT OF REINFORCEMENT, CONNECTORS,ANCHOR BOLTS (PERIODIC)GROUT SPACE IS CLEAN (PERIODIC)SOILS (REF TABLE 1704.7)GEOTECH.PROPER FOUNDATION DEPTH, VERIFICATION OFSUPPORTING STRATA (PERIODIC)X
COMPACTED FILL MATERIALS, SUBGRADE, AND SITEPREPARATION (PERIODIC)X
FOUNDATION UNDERPINNING AND/ OR SHORINGCAST-IN-PLACE DEEP FOUNDATION ELEMENTS (REFTABLE 1704.9)DRILLING OPERATIONS AND PIER CROSS SECTION ANDDEPTH (CONTINUOUS)STRUCTURAL WOOD (REF TABLE 1707.3) SP. INSP.WOOD SHEAR WALLSWOOD DIAPHRAGMSHOLDDOWNSSTRUCTURAL OBSERVATIONS GFDSENGINEERSSTRUCTURAL FOUNDATION XSTEEL FRAMING XCONCRETE CONSTRUCTION XMASONRY CONSTRUCTIONWOOD FRAMING X
SHEET LISTS0.0 GENERAL NOTESS0.2 TYPICAL CONCRETE DETAILSS0.3 TYPICAL WOOD DETAILSS0.4 TYPICAL SHEAR WALL DETAILSS2.1 DEMOLITION - BASEMENT LEVEL PLANS2.2 DEMOLITION - MAIN LEVEL PLANS2.3 DEMOLITION - SANCTUARY LEVEL PLANS2.3.1 DEMOLITION - CHOIR LOFT & BELFRY FRAMING PLANSS2.4 PROPOSED - FOUNDATION PLANS2.5 PROPOSED - MAIN LEVEL FRAMING PLANS2.6 PROPOSED - SANCTUARY FRAMING PLANS2.7 PROPOSED - CHOIR LOFT & BELFRY FRAMING PLANSS2.8 PROPOSED - ROOF FRAMING PLANS4.0 PROPOSED - BUILDING SECTIONSS5.1 CONCRETE DETAILSS7.1 STEEL DETAILSS7.2 STEEL DETAILSS8.1 WOOD DETAILSS8.2 WOOD DETAILS
ISSUE: DATE:
Revise specialinspection schedule tonote which inspectionsrequire continuous vs.periodic inspection.
A
B
D
E @2x61'-4"(N) ¾" PLYWD OR AS REQ'DTO MATCH (E) FLOORSHEATHING DEPTH (E) MC10X22(E) MC10X22(E) MC10X22(E) 6.75x12(E) 6.75x12(E) 6.75x12(E) 6.75x12(E) W14X34 (2)1¾x11Í
(2)1¾x11ÍCROSS HATCHED AREA INDICATESNEW RAISED PLATFORM WITH 2X6MIN OVERFRAMING W/ 6'-0" MAXSPAN. COORDINATE FRAMINGWITH INTEGRATED DUCTING LAYOUT.
(2)1¾x11Í(2)1¾x11Í
HEADERHEADERHEADER8
S0.3TYP
(E) 3X11½" @16" W/(1) 1¾X11Í" REINF. JOISTS(E) 3X11½" @16" W/(1) 1¾X18" REINF. JOISTS(E) 3X11½" @16"
(E) 3X11½" @16" W/(2) 1¾X11Í" REINF. JOISTS
(E) 3X11½" @16" W/(1) 1¾X11Í" REINF. JOISTS
(E) 3X11½" @16" W/(1) 1¾X18" REINF. JOISTS(E) 3X11½" @16"
(E) 3X11½" @16" W/(2) 1¾X11Í" REINF. JOISTS
(E) 3X11½" @16"
(E) 3X11½" @16"
Concealedcombustible spaceunder the platformmust be providedsprinkler protection(NFPA 13 section8.15.1.2.3).
C
F
C
1
C
S7
Provide a signed special inspection agreement form for the
structural steel welds, high strength bolting, and epoxy anchors.
(N) COMBINED BOILER VENTTHROUGH (E) CHIMNEY, FASNSEALFLEX TYPE OR EQUIVALENT,ESTIMATED 14"ø MAX, TO BEFINALIZED WITH VENDORENGINEERED BREECHING DESIGN.
(E) BOILER COMBUSTIONAIR INTAKE AREA WELL.TO REMAIN.
WELL.
61
A
TE
FA
c
How will the outside
air intake and
combustion air intake
wells be kept clear of
snow? Submitted
photos show snow up
against this side of the
building. Move intakes
to be above snow
level.
31
32
33
34
35
7
City of Aspen
Received
5/2/17
Building Department
Page: 39
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 96
Indicate the provided headroom
beneath the ductwork. Minimum
7' (2009 IBC 1208.2).
Page: 39
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 96
Each boiler is greater than 400
kBtu, requiring two exit access
doorways from the boiler room
(2009 IBC 1015.3).
Page: 39
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 96
Provide calculations determining
minimum outdoor ventilation
rates per 2009 IMC 403.3 for all
occupied spaces.
Page: 40
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 97
Thermostats must be within
accessible reach range (2009
IBC 1109.12).
Page: 41
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 98
Provide access to AHUs per
2009 IMC 306.
ELEV EQUIP002
CEILING-HUNG FANCOIL UNIT.
ELEV LOBBY001
12x3 OSAUP.
STORAGE
STORAGE
BOILERROOM
CRAWLSPACE
CRAWLSPACE
CRAWLSPACE
B -1B -1 WH-1
8"ø TYP.
SPACE FORHWS/RPUMPS. GF,ET, HX, ETC.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
12x12 24x12
14x12 14x12
18x12 24x1224x1234x1624x12 18x12 OSA
8ø8ø12x38ø8ø8ø24x1224x1218x12
18x12
14x12
14x12
14x12
14x12
18x12
14x12
FC -2
FC -3
FC -1
FC -4
FC -5FC -6
12x1212x1212x1212x1218x12
8ø
18x12SPACE FORCHW PUMPS.GF, ET, ETC.
1
1
1
1
1
FIELD COORDINATE DUCT ANDPIPE ROUTING WITH ELECTRICALTO AVOID ROUTING ABOVEELECTRICAL PANELS.8ø8ø8øBT -1ø10
ø10
ø10 ø10
(E) CRAWLSPACE VENILATIONTO REMAIN, TYP.
Indicate the providedheadroom beneath theductwork. Minimum 7'(2009 IBC 1208.2).
STORAGE
STORAGE
BOILERROOM
CRAWLSPACE
AWLACE
CRAWLSPACE
B -1B -1 WH-1
8"ø TYP.
SPACE FORHWS/RPUMPS. GF,ET, HX, ETC.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
8"ø TYP.
14x12 14x12
18x12 24x1224x1234x1624x12 18x12 OSA
8ø8ø12x38ø8ø8ø24x1224x1218x12
18x12
14x12
14x12
14x12
14x12
18x12
14x12
FC -2
FC -3
FC -1
FC -4
FC -5FC -6
12x1218x12
8ø
SPACE FORCHW PUMPS.GF, ET, ETC.
1
1
1
1
1
8ø8ø8øBT -1ø10
Each boiler is greater
than 400 kBtu,
requiring two exitaccess doorways fromthe boiler room (2009IBC 1015.3).
Provide calculations determining
minimum outdoor ventilation rates
per 2009 IMC 403.3 for all
occupied spaces.
A
C
B
TEL: 970.925.5
FAX: 970.920. THOLIC CHURCHAND LOCATION.
ALL DUCTWORK SHALL BE ROUTED AS HIGHAS POSSIBLE IN THE CEILING SPACE.UTILIZE JOIST SPACE WHEN POSSIBLE,ESPECIALLY WHERE CROSSING OTHERDUCTS, PIPES, AND ELECTRICAL.
ALL RA & SA RECTANGULAR DUCT TOINCLUDE 1" INTERNAL LINER, UNO. OSA ANDEXH DUCT SHALL BE UNLINED.
CONNECT ALL SA AND RA DEVICES WITHINACOUSTIC FLEX DUCT, 5' MIN. & 8' MAXLENGTH.
UTILIZE REMOTE BALANCE DAMPERS ILOOBD OR BALANCE DAMPERS AT GRILLE.FLEX DUCT TO BE LOCATED BETWEENDEVICE AND BALACE DAMPER, AS SHOWN.
11.
12.
13.
14.
FLAG NOTES:
WALL-MOUNTED THERMOSTATADJACENT TO LIGHT SWITCH,COORDINATE EXACT LOCATION ANDAPPEARANCE WITH ARCHITECT.
CUSTOM DECORATIVE GRILLE, EITHER(1) CONTINUOUS WITH MULTIPLE DUCTCONNECTIONS, OR MULTIPLE
MATCHING CONNECTION QTY. BELOW.TBD IN ARCH. COORD.
CONNECT (N) EF-1 TO (E) EXHAUSTDUCT, WITH BDD.
DUCT ROUTED IN JOIST SPACE TODIFFUSER.
1
2
3
4
Thermostats must be
within accessible
reach range (2009 IBC
1109.12).
Provide access to
AHUs per 2009 IMC
306.
36
37
38
39
40
8
City of Aspen
Received
5/2/17
Building Department
Page: 41
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 98
Ductwork in attic must be
insulated to R5 per 2009 IECC
503.2.7.
Page: 42
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 99
Provide access to AHUs per
2009 IMC 306.
Page: 43
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 100
R-10 insulation is required under
snowmelt.
Page: 50
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 107
Detail where this drains to in
your civil drawings.
Page: 63
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 120
Provide a lower level lighting
plan.
LE
CHARLESCUNNIFFEARCHITECTS
610 EAST HYMA
ASPEN, CO 81
TEL: 970.925.55
FAX: 970.920.4
cunniffe.co CHURCHVERIFY ALL EQUIPMENT ACCESS PANELSWITH MANUFACTURER AND ARCHITECT.
ALL SOURCES OF IGNITION ON MECHANICALEQUIPMENT SHALL BE MOUNTED 18" AFF.
PROTECT PIPING ROUTED ALONGCOLUMNS, WALLS, ETC. FROM DAMAGE ASNECESSARY WITH CAGES. COORDINATEWITH ARCHITECT.
ALL RETURN AIR GRILLES SHALL BEPROVIDED WITH SOUND BOOT WITH 1"LINER.
T-STATS SHALL BE LOCATED NEAR THELIGHT SWITCH WITHIN THE ROOM SHOWN.COORDINATE WITH ARCHITECT &ELECTRICAL ENGINEER TO MATCH HEIGHTAND LOCATION.
ALL DUCTWORK SHALL BE ROUTED AS HIGHAS POSSIBLE IN THE CEILING SPACE.UTILIZE JOIST SPACE WHEN POSSIBLE,ESPECIALLY WHERE CROSSING OTHERDUCTS, PIPES, AND ELECTRICAL.
ALL RA & SA RECTANGULAR DUCT TOINCLUDE 1" INTERNAL LINER, UNO. OSA ANDEXH DUCT SHALL BE UNLINED.
CONNECT ALL SA AND RA DEVICES WITHINACOUSTIC FLEX DUCT, 5' MIN. & 8' MAXLENGTH.
UTILIZE REMOTE BALANCE DAMPERS ILOOBD OR BALANCE DAMPERS AT GRILLE.FLEX DUCT TO BE LOCATED BETWEENDEVICE AND BALACE DAMPER, AS SHOWN.
6.
7.
8.
9.
10.
11.
12.
13.
14.
FLAG NOTES:
1 ACOUSTIC IMPACTS OF CUSTOMGRILLE TO BE EVALUATED, EXACT SIZE,AND CONFIGURATION TBD.
Ductwork in attic must
be insulated to R5 per
2009 IECC 503.2.7.
S -2
AHU -1
Provide access to
AHUs per 2009 IMC
306.
SNOWMELT CONN
NO SCALE
R-10 insulation is
required under
snowmelt.
SACRARIUM BASIN W ROUTED TO
STORM/DAYLIGHT. REGULARBASIN W ROUTED TO SANITARYWASTE.
Detail where this
drains to in your civil
drawings.
Provide a lower level
lighting plan.
41
42
43
44
45
9
City of Aspen
Received
5/2/17
Building Department
Page: 63
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 120
Provide light reduction controls
per 2009 IECC 505.2.2.1.
Page: 63
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 120
Provide emergency power to
lights in the corridor. (2009 IBC
1006.3)
Page: 63
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 120
Provide interior and exterior
lighting COMchecks; lighting
cutsheets with the maximum
fixture wattage highlighted
(should match COMcheck) and
the NRTL listing highlighted.
COMcheck must match lighting
plans and lighting schedule.
Page: 66
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 123
Controls and receptacles must
be withing accessible reach
ranges (2009 IBC 1109.12).
Provide dimensions above floor.
Page: 72
File Name: 00.Plans.Combined.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 129
Provide assistive listening
system (2009 IBC 1108.2.7)
oc
SS
oc
DDDD
D
JJJ
ococococ
oc
S
S
oc ococococococ SoSSSSSSSS
S S
oc oc
oc
SSS SoS
SSC
E
B
D
1 2 3 4 5 6 7 8 9
DP3
DP3
S3
R3
R3
R3
R1
R1
DP4
R2
R2
R1
R1
DW1DW1
R2ER2
R2
DP4 DP4 DP4DP4
DW1
DW1
DW1
DW1
R2
R2E
R2
R2
(E)(E)(E)(E)DP3DP3DP3
DP3
DP3
DP3
DP3 DP3
DP3
DP3
DP3 DP3
DP3 DP3
DP3
DP3
DP3 S2
S2
R5
X1X3X3
1
R5
R5
DP3
K K
E3
E2
3
3
1 1
R2
R2 R2E
R2ER2
R5
R5
R2E
DP3
3 3 3 3 3 3 3
444
4
5
6 6
7
7
R2E
R2E
HALLWAY111
WOMEN110
MEN116
KITCHEN109
ENTRY100
MEETING RM101MEETING RM102MEETING RM103MEETING RM104MEETING RM105MEETING RM106MEETING RM107
STOR122
S3
S3
S3
S3
8
3
3
9
11
12
RECEPT118
S2
13131313
TOLIGHTSIN STAIRABOVE
TO LIGHTSIN STAIRABOVE
15
15
E3
P1A-2P1A-4P1A-6P1A-8P1A-10P1A-12P1A-14
12P1A-20
M0-42
M0-42
M0-42
SCALE: 3/16" = 1'-0"
MAIN LEVEL LIGHITNG PLANProvide light reductioncontrols per 2009IECC 505.2.2.1.
oc
SS
oc
DDDD
D
JJJ
ococ
ococ
oc
S
S
oc ococococococSSSSSS SS
S S
oc
oc
SSS SoSSoc
A
C
E
B
D
1 2 3 4 5 6 7 8
DP3
R3
R3
R3
R1
R1
DP4
R2
R2
R1
R1
DW1DW1
R2ER2
R2
DP4 DP4 DP4DP4
DW1
DW1
DW1
DW1
R2
R2E
R2
R2
(E)(E)(E)(E)DP3DP3DP3
DP3
DP3
DP3
DP3 DP3
DP3
DP3
DP3 DP3
DP3 DP3
DP3
DP3
DP3
E1
R5
R5
X1
X3
X3X3
1
2
DP3
K K
(E)
E2
3
3
1 1
R2
(E)(E)
R5
R5
R2E
DP3
3 3 3 3 3 3 3
444
4
5
6 6
7
7
R2E
R2E
HALLWAY111
WOMEN110
MEN116
OFFICE113
CONF RM112
KITCHEN109
OFFICE114 OFFICE119
ENTRY100
MEETING RM101MEETING RM102MEETING RM103MEETING RM104MEETING RM105MEETING RM106MEETING RM107
S
VEST.120
3
3
9
10
11
RECEPT118
13131313
1313
3
13 14
X4
15
15
15
P1A-22
P1A-2P1A-4P1A-6P1A-8P1A-10P1A-12P1A-14
P1A-5
P1A-20
M0-42
M0-42 M0-42
Provide emergencypower to lights in thecorridor. (2009 IBC1006.3)
Provide interior and
exterior lighting
COMchecks; lighting
cutsheets with the
maximum fixture wattage
highlighted (should match
COMcheck) and the NRTL
listing highlighted.
COMcheck must match
lighting plans and lighting
schedule.
WINDOW
BACK SPLASH
COUNTERTOP
CL
EQ EQ
CL
--6" MIN 20"MAX
ALIGN POWER-BASED DEVICES(RECEPTACLES, SWITCHES,ETC.) VERTICALLY. DO NOTVERTICALLY ALIGN POWER ANDCOMMUNICATION DEVICESSIMULTANEOUSLY.
Controls and
receptacles must be
withing accessible
reach ranges (2009
IBC 1109.12). Provide
dimensions above
floor.
MOUNT. HOMERUN CABLING TO
REFER TO LOUDSPEAKER SCHE
SHEET T0.1. REFER TO DIAGRAM
SHEET T4.0 FOR MOUNTING.
Provide assistive listening system
(2009 IBC 1108.2.7)
46
47
48
49
50
10
City of Aspen
Received
5/2/17
Building Department
Page: 1
File Name: IBC building form.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 1
Submit an IBC building
description form.
IBC building form.pdf (1)
Page: 1
File Name: REMP owrksheet_2017-01-18.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 1
SM1.1 shows 711sqft snowmelt
new. The 243 sqft egress portion
is exempted.
REMP owrksheet_2017-01-18.pdf (2)
Page: 1
File Name: REMP owrksheet_2017-01-18.pdf
Subject: PlanCheck
Author: nickt
Color:
Page Index: 1
Your snowmelt plan SM1.1
shows 487 sqft of existing
snowmelt to be reused, this
means you are only removing
620 sqft.
Submit an IBC
building description
form.
SM1.1 shows 711sqft
snowmelt new. The
243 sqft egress
portion is exempted.
Your snowmelt plan
SM1.1 shows 487 sqft
of existing snowmelt to
be reused, this means
you are only removing
620 sqft.
51
52
53
11
City of Aspen
Received
5/2/17
Building Department