HomeMy WebLinkAboutFile Documents.533 E Main St.0004.2017 (9).ACBK0004-2017-ACBK_BuildingComments_3
Page: A10.1
File Name: Revised RD2 Plan Set.pdf
Subject: PlanCheck
Author: nickt
Color:
Specify hinges that will permit a
32" clear opening at door 302
when open at 90 degrees
between leaf and jamb.
Revised RD2 Plan Set.pdf (4)
Page: S0.1
File Name: Revised RD2 Plan Set.pdf
Subject: PlanCheck
Author: nickt
Color:
Sanctuary platform live load
should be 125 psf per 2009 IBC
1607.1
Page: S0.1
File Name: Revised RD2 Plan Set.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide the snow load used (min
75 psf roof snow load per
Ordinance 31, 2011)
Page: S0.1
File Name: Revised RD2 Plan Set.pdf
Subject: PlanCheck
Author: nickt
Color:
List all items that must be
special inspected and note
whether the inspection may be
periodic or continuous in
accordance with the special
inspection agreement and 2009
IBC 1704.
1/4"
4 1/2"
1/4" 3/4"
1/2"
119 3'-0" 7'-0"
120A 5'-0" 9'-0"
120B 5'-0" 8'-0"
121 2'-6" 7'-0"
122 3'-0" 6'-8"
202A 2'-6" 7'-0"
202B 1'-6" 8'-0"
204A 3'-0" 7'-9"
204B 3'-0" 7'-9"
205 5'-0" 9'-7"
208 3'-0" 7'-0"
209 3'-0" 7'-0"
301 2'-6" 6'-8"
302 2'-10" 6'-8"
401 1'-6" 3'-0"
HEX 4Specify hinges that will
permit a 32" clear
opening at door 302
when open at 90
degrees between leaf
and jamb.
LIVE LOADS
DESIGN LIVE LOAD
LOADS MAY BE RE
ROOF LIVE
FLOOR LIVE
EARTHQUAKE DESI
SEISMIC FOR
Ie
Ss
S1
SITE CLASS
Sds
Sd1
SEISMIC DES
R
ANALYSIS PR
REDUNDANC
WIND DESIGN DAT
BASIC WIND
OCCUPANCY CAT
Sanctuary platform live
load should be 125 psf
per 2009 IBC 1607.1
GENERAL N
SCOPE
THE SCOPE MAIN AND
COORDIN
DETAILS SH IDENTIFICA
ARCHITECT STRUCTURA
LAYOUT, D CONFLICTS
WORK.
CONTRAC
GFDS ENG CONTRAC METHODS,
THE CONTR THESE RIGH
UNLESS OT
WINDOWS INSTALLED DAMAGE T
EXISTING C
THE CONTR
THAT MAY ANY DISCR
NOT NOTED HAZARDS M
FRAMING M
CUTTING A
DO NOT C UNLESS AP DESIGNED
SLOTS NEA SURFACES.
LIVE LOADS
DESIGN LIVE LOADS PER CBC TABLE 1607.1 [IBC TABLE 1607.1]AND AS FOLLOWS. LIVELOADS MAY BE REDUCED IN ACCORDANCE WITH CBC SECTION 1607.9 [IBC TABLE 1607.9].
ROOF LIVE 20 PSF
FLOOR LIVE 100 PSF
EARTHQUAKE DESIGN DATA
SEISMIC FORCE-RESISTING SYSTEM:Ie 1.25Ss0.35
S1 0.076SITE CLASS D
Sds 0.355Sd10.122
SEISMIC DESIGN CATEGORY CR1.5 [ORDINARY PLAIN MASONRY SHEARWALLS]ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCEREDUNDANCY FACTOR 1.0
WIND DESIGN DATA
BASIC WIND SPEED, V 90 MPHIw1.25 (CATEGORY III)
EXPOSURE [C (OPEN TERRAIN)]
MAIN WIND-FORCE RESISTING SYSTEMS
ANALYSIS PROCEDURE METHOD 2, RIGID, LOW-RISE, h < or = 60 FT
COMPONENTS & CLADDING
CODE AND STANDARDS
DESIGN IS BASED ON THE INTERNATIONAL BUILDING CODE, 2009 EDITION. CONSTRUCTIONSHALL CONFORM WITH APPLICABLE SECTIONS OF THIS CODE.
REFERENCE STANDARDS SHALL BE THE EDITION NOTED IN THE CODE, UNLESS OTHERWISE
INDICATED.
OCCUPANCY CATEGORY III / A-3
Provide the snow loadused (min 75 psf roofsnow load per
Ordinance 31, 2011)
HAZARDS MAY INCLUDE BUT ARE NOT LIMITED TO TOXIC MATERIALS AND DECAYED OR BROKEN
FRAMING MEMBERS.
CUTTING AND PATCHING
DO NOT CUT EXISTING OR NEW STRUCTURAL ELEMENTS EXCEPT AS SHOWN ON THE DRAWINGSUNLESS APPROVED BY THE ENGINEER. IN GENERAL USE HAND OR SMALL POWER TOOLSDESIGNED FOR SAWING AND GRINDING, NOT HAMMERING AND CHOPPING. CUT HOLES ANDSLOTS NEATLY TO MINIMUM SIZE REQUIRED AND WITH MINIMUM DISTURBANCE TO ADJACENTSURFACES.
RESTORE WORK WHICH HAS BEEN CUT, REMOVED OR DAMAGED BY ADJACENT WORK. REFINISHENTIRE SURFACES AS NECESSARY TO PROVIDE AN EVEN FINISH TO MATCH ADJACENT FINISHES.
CONSTRUCTION PHASE SITE VISITS
GFDS ENGINEERS WILL PROVIDE CONSTRUCTION SITE VISITS AND OBSERVE THE PROGRESS ANDQUALITY OF STRUCTURAL PORTIONS OF THE WORK. THESE VISITS AND OBSERVATIONS ARE NOTINTENDED TO BE AN EXHAUSTIVE CHECK OR DETAILED INSPECTION OF THE CONTRACTOR'S WORK,BUT RATHER TO ALLOW GFDS ENGINEERS TO BECOME GENERALLY FAMILIAR WITH THE WORK INPROGRESS AND TO DETERMINE, IN GENERAL, IF THE WORK IS PROCEEDING IN ACCORDANCEWITH THE CONTRACT DOCUMENTS.
THE GENERAL CONTRACTOR SHALL TAKE THE APPROPRIATE ACTION TO CORRECT PORTIONS OFTHE WORK INDICATED AS BEING NOT IN COMPLIANCE WITH THE CONTRACT DOCUMENTS.
SPECIAL INSPECTION AND TESTING
IN ACCORDANCE WITH CBC 2013 [IBC 2006], CHAPTER 17 THE OWNER OR OWNER'S AGENTSHALL ENGAGE A SPECIAL INSPECTOR TO PROVIDE SPECIAL INSPECTIONS. UNLESS OTHERWISESPECIFICALLY INDICATED, GFDS ENGINEERS SHALL NOT PROVIDE SPECIAL INSPECTION.CONTRACTOR SHALL REVIEW THE SPECIAL INSPECTION REQUIREMENTS SHOWN ON THECONTRACT DOCUMENTS AND/ OR ON COMPLETED FORMS ISSUED BY THE BUILDINGDEPARTMENT HAVING JURISDICTION OVER THE WORK AND SHALL NOTIFY TESTING AGENCIES ATLEAST 24 HOURS IN ADVANCE OF TIME WHEN WORK THAT REQUIRES TESTING OR INSPECTING WILLBE PERFORMED.
STRUCTURAL OBSERVATION
GFDS ENGINEERS WILL PROVIDE STRUCTURAL OBSERVATION IN ACCORDANCE WITH CBC 2013[IBC 2006], CHAPTER 17, SECTION 1710 AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALLREVIEW THE STRUCTURAL OBSERVATION REQUIREMENTS SHOWN ON THE CONTRACT DOCUMENTS
AND NOTIFY GFDS ENGINEERS AT LEAST 48 HOURS IN ADVANCE OF TIME WHEN WORK THATREQUIRES STRUCTURAL OBSERVATION WILL BE COMPLETED.
SUBMITTALS
THE FOLLOWING SHALL BE SUBMITTED TO GFDS ENGINEERS, WITH COPY TO THE ARCHITECT, FORREVIEW.
CONTRACTOR PROPOSED CHANGES IN PRODUCTS, MATERIALS, EQUIPMENT, AND METHODS OFCONSTRUCTION FROM THOSE SPECIFIED ON THE STRUCTURAL DRAWINGS.
CONCRETE MIX DESIGNSTRUCTURAL STEEL ERECTION AND DETAIL DRAWINGS
BASIC WIND SPEED, V 90 MPHIw1.25 (CATEGORY III)EXPOSURE [C (OPEN TERRAIN)]
MAIN WIND-FORCE RESISTING SYSTEMS
ANALYSIS PROCEDURE METHOD 2, RIGID, LOW-RISE, h < or = 60 FT
COMPONENTS & CLADDING
ANALYSIS PROCEDURE METHOD 2, LOW-RISE, h < or = 60 FT
FOUNDATIONS
FOUNDATION DESIGN IS BASED ON REPORT BY: H-P KUMAR, AND IS ENTITLED "SUBSOILSTUDY FOR FOUNDATION DESIGN PROPOSED ADDITION TO ST. MARY'S CATHOLICCHURCH". SPREAD FOOTINGS BEAR ON UNDISTURBED SOIL, ENGINEERED FILL, OR ROCK.FOOTING DESIGN IS BASED ON A MAXIMUM ALLOWABLE SOIL BEARING PRESSURE OF 4,000PSF TOTAL LOADS, INCLUDING WIND OR SEISMIC.
EXCEPT WHERE OTHERWISE SHOWN, EXCAVATIONS SHALL BE MADE AS NEAR AS POSSIBLETO THE NEAT LINES REQUIRED BY THE SITE AND SHAPE OF THE STRUCTURE. ALL FOUNDATIONS
SHALL BE POURED WITH OUT THE USE OF SIDE-FORMS WHEREVER POSSIBLE. IF THE TRENCHESCAN NOT FULLY STAND, FULLY FORM SIDES TO DIMENSIONS SHOWN.
DO NOT ALLOW WATER TO STAND IN TRENCHES. IF BOTTOMS OF TRENCHES BECOMESSOFTENED DUE TO RAIN OR OTHER WATER BEFORE CONCRETE IS CAST, EXCAVATESOFTENED MATERIAL AND REPLACE WITH PROPERLY COMPACTED BACKFILL ORCONCRETE.
WATERPROOFING
WHERE STRUCTURAL DETAILS INDICATE ANY WATERPROOFING OR VENTILATION ITEMS, THEYARE SCHEMATIC ONLY AND FOR THE PURPOSE OF ASSISTING IN SHOWING A COMPLETESTRUCTURAL DETAIL. REFER ONLY TO ARCHITECTURAL PLANS AND SPECIFICATIONS FORTHE COMPLETE DESCRIPTION OF ALL REQUIRED WATERPROOFING AND VENTILATION
SYSTEMS.
Structuraldesign for fine
SHEET NO.
JOB NO.
S0.1
16055
GENERAL N ST. MARY CATHOLIC CHURCH533 E. MAIN STREET100% DDISSUE:
CD SET
List all items that mustbe special inspectedand note whether the
inspection may beperiodic or continuousin accordance with thespecial inspectionagreement and 2009IBC 1704.