610 East Hyman Avenue ▪ Aspen, Colorado 81611 ▪ 970.925.5590 ▪ Fax 970.920.4557 ▪ www.cunniffe.com
ST. MARY CATHOLIC CHURCH
PERMIT COMMENT RESPONSES 2 - BUILDING 19 June 2017
1. See attached revised letter to building department
2. See attached REMP worksheet
3. See attached REMP worksheet
4. See attached REMP worksheet
5. Complete drawings set submitted herein
6. S0.1 included in sheet set
7. 8.5 x 11 PDFs attached separately
8. See attached email chain with Aspen Electric
9. ADA clearances have been provided. See revised sheet A2.5
10. UL listing has been added. See revised sheet A2.5
11. ADA portable ramp has been provided. See revised sheet A2.6
12. See revised door schedule on sheet A10.1
13. Note has been added. See revised sheet A4.2. Handrails are shown in plan view as returning to
wall in previous submittal.
14. Grab bars have been added. See revised sheet A6.1
15. ADA clearance dimensions have been added. See revised sheet A4.1
16. ROXUL mineral wool insulation product has been specified over spray applied insulation.
17. Note has been added. See revised sheet A7.10
18. Countertop height revised. See revised sheet A8.3
19. Note has been added. See revised sheet A8.4. Handrails are shown in plan view as returning to
wall in previous submittal.
20. See revised MEP drawings attached
City of Aspen
Received
6/19/17
Building Department