Loading...
HomeMy WebLinkAboutFile Documents.533 E Main St.0004.2017 (46).ACBKCOMcheck Software Version 4.0.5.1 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Construction Site: 533 E. Main Street Aspen, CO 81611 Owner/Agent: Marina Skiles CCA 610 E. Hyman Avenue Aspen, CO 81611 970-925-5590 marinas@cunniffe.com Designer/Contractor: BG Buildingworks 222 Chapel Place Unit AC-201 Avon, CO 81620 970-949-6108 Project Information Energy Code: St. Mary Catholic Church Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Main level (Office)4454 0.82 3652 3652Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Main level ( Office 4454 sq.ft.) LED 19: DP3: Other:1 14 60 840 LED 20: DP4: Other:3 12 60 720 LED 21: DW1: Other:1 6 14 81 LED 22: (E): Other:1 6 120 720 LED 23: R1: Other:1 4 23 93 LED 24: R2/R2E: Other:1 21 23 487 LED 25: R3: Other:1 5 13 65 LED 26: R4W: Other:1 50 2 100 LED 27: R5: Other:1 4 1 4 LED 28: S2: Other:1 2 42 84 LED 29: S3: 96W Driver: Other:1 1 96 96 LED 30: X1: Other:1 2 1 Exempt Exemption:Exit Signs, Safety or Emergency Lighting LED 32: X2: Other:1 1 10 Exempt Exemption:Exit Signs, Safety or Emergency Lighting LED 31: X3: Other:1 3 5 Exempt Exemption:Exit Signs, Safety or Emergency Lighting 3290Total Proposed Watts = Project Title: Data filename: St. Mary Catholic Church S:\BGProjects\9727.00 St. Mary Catholic Church\Engineering\Energy\Calcs\St. Mary.cck 05/01/17Report date: 61 ofPageCity of Aspen Received 5/2/17 Building Department City of Aspen Received 5/2/17Building Department Inspection Checklist Requirements: 78.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.5.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E0.2, E3.2 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: St. Mary Catholic Church S:\BGProjects\9727.00 St. Mary Catholic Church\Engineering\Energy\Calcs\St. Mary.cck 05/01/17Report date: 63 ofPageCity of Aspen Received 5/2/17 Building Department Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E3.2 C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E3.2 C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E3.2 C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Exception: Lighting controlled by occupancy sensors. Location on plans/spec: E3.2 C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E3.2 C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E0.2, E3.2 C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E0.2 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: St. Mary Catholic Church S:\BGProjects\9727.00 St. Mary Catholic Church\Engineering\Energy\Calcs\St. Mary.cck 05/01/17Report date: 64 ofPageCity of Aspen Received 5/2/17 Building Department Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: St. Mary Catholic Church S:\BGProjects\9727.00 St. Mary Catholic Church\Engineering\Energy\Calcs\St. Mary.cck 05/01/17Report date: 65 ofPageCity of Aspen Received 5/2/17 Building Department Project Title: Data filename: St. Mary Catholic Church S:\BGProjects\9727.00 St. Mary Catholic Church\Engineering\Energy\Calcs\St. Mary.cck 05/01/17Report date: 66 ofPageCity of Aspen Received 5/2/17 Building Department