HomeMy WebLinkAboutFile Documents.533 E Main St.0004.2017 (52).ACBKDan Cokley, P.E. 0029799
Project Engineer
Vicinity Map
St. Mary Catholic Church
533 Main Street
Aspen, CO 81611
Parcel #273707331801
Sheet Index
Owner / Applicant
Revision#Date By
Job #.File:
TS-01 Cover Sheet
GN-01 Legend, Notes, and Abbreviations
EX-01 Existing Conditions
CDM-01 Demolition Plan
CGE-01 Geometry Plan
CRD-01 Hunter Street Sidewalk Plan & Profile
CRD-02 Highway-82 Sidewalk Plan & Profile
CEC-01 Erosion Control Plan
CSW-01 Stormwater Management Plan
CDT-01 City of Aspen Standard Details
CDT-02 Project Details
CDT-03 Curb Ramp Cross Sections
CDT-04 Striping Plan
Permit Resub. Set
April 2017
118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
St. Mary Catholic Church
Aspen, CO
Project
Location
Site Plan
Scale: 1" = 40'
Project Contacts:
Project Engineer: Dan Cokley, 970-384-9009
Site Superintendent: Josh Miller, 970-261-5389
Safety Specialist: Stuart Dalpiaz, 970-640-7284
Traffic Control Supervisor: Dick Perkins, 970-216-8603
Erosion Control Supervisor: Josh Miller, 970-261-5389
City of Aspen Engineering: 970-920-5080
City of Aspen Electric: 970-920-5148
Gas: Black Hills Energy 970-927-0482
City of Aspen Water Department: 970-920-5110
Aspen Consolidated Sanitation District: 970-429-5415
Lot: A-I Saint Marys Catholic Church
Subdivision: City and Townsite of Aspen
Block: 93
4/17/2017
City of Aspen
Received
5/2/17
Building Department
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Legend Notes and
Abbreviations
2016.195.001
DCS
8/11/2016
DCS
Admin
XX
GN-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
Additional Abbreviations Additional Line Types & Symbols
4/17/2017
City of Aspen
Received
5/2/17
Building Department
15"4"
8"
11"
5"
5"
15"
13"
13"
17"
20"
20"
18"
6"
28"
26"
26"
30"
30"24"26"24"3"3"33"21"
8"
6"
18"
2"
2"2"4"4"3"4"
3"
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = ##'
0 #####
Existing Conditions
2016.195.001
AMC
8/11/2016
DCS
DemoPlan
XX
EX-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
15"4"8"11"5"5"15"13"13"17"20"20"18"6"28"26"26"30"30"24"26"24"3"3"33"21"8"6"18"2"2"2"4"4"3"4"3"Job No.Drawn by:Date:OfFile:PE:QC:Revision#DateByGraphic ScaleIn Feet: 1" = 15'081530Demolition Plan2016.195.001AMC/DCS8/11/2016DCSDemoPlanXXCDM-0114St. Mary Catholic ChurchAspen, COForConstruction118 West Sixth Street, Suite 200Glenwood Springs, CO 81601970.945.1004 www.sgm-inc.com 4/17/2017City of Aspen Received 5/2/17Building Department
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 20'
0 10 20 40
Geometry Plan
2016.195.001
AMC/DCS
8/11/2016
DCS
GeometryPlan
XX
CGE-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
15"13"
13"17"
24"
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 5'
0 3 5 10
Hunter Street Sidewalk Plan
& Profile
2016.195.001
DCS
8/11/2016
DCS
PlanProfile
XX
CRD-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
15"
13"
20"
20"
30"
30"24"26"24"3"3"33"21"
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 10'
0 5 10 20
Highway-82 Sidewalk Plan
& Profile
2016.195.001
DCS
8/11/2016
DCS
PlanProfile
XX
CRD-02
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 20'
0 10 20 40
Erosion Control Plan
2016.195.001
AMC/DCS
8/11/2016
DCS
ErosionControlPlan
XX
CEC-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Stormwater
Managment Plan
2016.195.001
DCS
8/11/2016
DCS
Admin
XX
CSW-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
City of Aspen
Standard Details
2016.195.001
DCS
8/11/2016
DCS
Admin
XX
CDT-01
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
Job No.Drawn by:Date:OfFile:PE:QC:Revision#DateByProject Details2016.195.001DCS8/11/2016DCSAdminXXCDT-0214St. Mary Catholic ChurchAspen, COForConstruction118 West Sixth Street, Suite 200Glenwood Springs, CO 81601970.945.1004 www.sgm-inc.com 04/17/2017City of Aspen Received 5/2/17Building Department
13"
13"
3"
15"
4"
8"
17"
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 5'
0 2 5 10
Curb Ramp Cross Sections
2016.195.001
DCS
8/11/2016
DCS
PlanProfile
XX
CDT-03
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department
15"13"
13"17"
24"
Job No.
Drawn by:
Date:
Of
File:
PE:QC:
Revision#Date By
Graphic Scale
In Feet: 1" = 5'
0 3 5 10
Striping Plan
2016.195.001
AMC/DCS
8/11/2016
DCS
PlanProfile
XX
CDT-04
14
St. Mary Catholic Church
Aspen, CO
For
Construction 118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
970.945.1004 www.sgm-inc.com
4/17/2017
City of Aspen
Received
5/2/17
Building Department