Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (3).ARBKPROJECT ADDRESS: Parcel ID #: Permit Number: CONTACT INFORMATION : Owner: Name:City: Aspen Address:State: CO Email:Zip Code: 81611 Phone: Cell Phone: 970-618-1645 Owner's Representative : Name:City: Aspen Address:State: CO Email:Zip Code: 81611 Phone: Cell Phone: 970-618-1645 ` A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official? Hydro Snowmelt Electric Snowmelt Pool Spa Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft To be Removed 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New 500.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New (exempt)0.00 sqft 0.00 sqft 0.00 sqft Total on site 500.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total Snowmelt on site Boiler Efficiency 94.4%100%75.0% 75.0% Mitigation Fee ‐$                                        ‐$                         Total Fee for Mitigation:18,008.47$ B. ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System 35,115.29$ Use Thermal Worksheet Hot Water Panels -$ Use GSHP Cert Ground Source Heat Pump -$ Other Approved System -$ Total Mitigation Credits: 35,115.29$ Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I need? 2.62 or How many square feet of SHW (solar hot water) would I need? 80.16 R-REMP Fee: -$ Amount Previously Paid on This Permit:-$ TOTAL R-REMP FEE :-$ Refund (includes minus $750): ‐$                          C. PREPARED BY:Date: 8/28/2017 Print Name: Signature: Phone & EMail: REVIEWED:Date: jamietisch@aol.com 970-618-1645 A-001 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11.1 UPDATED MARCH 28 2017 520 N 8th Street Aspen CO 81611 2735121140003 0032-2017-ACBK matthew@thunderbowlarchitects.com Jamie Tisch 520 N 8th Street 970-618-1645 matthew@thunderbowlarchitects.com Matthew Smith 500.00 sqft 301 S Spring Street Suite 201 970-618-1645 Matthew Smith $18,008.47 Matthew Smith Yes (enter sqft below on the exempt row)No NT 11/7/17 Parcel ID #: Collector Aspect, Degress from True South Collector Tilt, Degrees From Horizontal Solar Orientation Adjustment Factor DC side capacity (kW) Inverter capacity (kW) kW for credit kW Mitigation Credit Collector Group 1 03099.90%5.52 5.12 5.12 5.11 kW Collector Group 2 87.00%0 0.00 kW Collector Group 3 87.00%0 0.00 kW Collector Group 4 87.00%0 0.00 kW Collector Group 5 87.00%0 0.00 kW Collector Group 6 87.00%0 0.00 kW Collector Group 7 87.00%0 0.00 kW Collector Group 8 87.00%0 0.00 kW Collector Group 9 87.00%0 0.00 kW Collector Group 10 87.00%0 0.00 kW Collector Group 11 87.00%0 0.00 kW Collector Group 12 87.00%0 0.00 kW Collector Group 13 87.00%0 0.00 kW Collector Group 14 87.00%0 0.00 kW Collector Group 15 87.00%0 0.00 kW Collector Group 16 87.00%0 0.00 kW Collector Group 17 87.00%0 0.00 kW Collector Group 18 87.00%0 0.00 kW Collector Group 19 87.00%0 0.00 kW Collector Group 20 87.00%0 0.00 kW Total: 5.11 kW $ Mitigation Credit: 35,115.29$ Instructions: 1) 2) 3) DC side capacity is the total labled panel output kW in a group. 4) Inverter capacity is the recommended input power in kW of your inverter(s). 5) 6) 7) 8) PREPARED BY:Date: 8/28/2017 Print Name: Signature: Phone & EMail: REVIEWED:Date: PV WORKSHEET CITY OF ASPEN VERSION 11.1 UPDATED MARCH 28 2017 Permit Number: 0032-2017-ACBK2735121140003 Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically calculated. PROJECT ADDRESS: The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP fee. Determine how many collector groups you have. Groups are used to differentiate between collectors (panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you might have just one group. 520 N 8th Street Matthew Smith 970-618-1645 matthew@thunderbowlarchitects.com The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit You will be given credit for the lesser of the labeled panel output or the inverter. The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. NT 11/7/17