Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (7).ARBK0032-2017-ACBK_BuildingComments_1 Page: A-001 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide an existing site plan 520 N 8TH ST PERMIT SUBMISSION.pdf (14) Page: A-001 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: If there is to be any snowmelt, provide the following: 1. Snowmelt plan showing square footage. 2. RREMP worksheet 3. Insulation detail Page: A-101 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide access to the crawlspace, including the new crawlspaces created by closing off the tops of the pool and spa (2009 IRC R408.4). Page: A-102 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide access to the underfloor space created by the overframing at the new media room. (2009 IRC R408.4). Page: A-102 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide the finish floor level of the landings on each side of the new exterior door 111 as well as the threshold height. (2009 IRC R311.3) 7890' 7909.85'7890'19'-10 3/1 7901.68'7891' 7909.85'7892'17'-10 3/1 7909.85'7891.5'18'-4 3/16 7908.68'18'-10 3/1 11'-1 3/4" 7890' 7890' 7890.68' 7892' 7891.5' SAME SAME EXISTING SAME SAME PROPOSED SITE PLAN 1/4" = 1'-0" 1 A-001 Provide an existing site plan (10.1') TRASHENCLOSURE IRR. DITCH 18" C.M . P . EXISTING CONCRETE DRIVEWAY FLAGSTONEPATH E WS G B MB CO SHED FOUND REBAR AND ORANGEPLASTIC CAP LS28643 S14°50'49"W 138.21' N14°19' 4 6 " W 1 3 8 . 2 7'N75°11'36"W 60.18'(N74°06'24"W 60.11')(N13°11'45 " W 1 3 8 . 5 7 ' ) (BASIS OF BEARINGS) 10' REAR BUILDING SETBACK 15' SIDE BUILDING SETBACK15.0' 10' FRO N T B U I L D I N G S E T B A C K 10.0'7 15 18 19 20 21 22 23 18" C.M.P. APPROX. LOCATION OF C.M.P.OTHER END NOT LOCATED ASPHALT(TYP.)ALLEY7890 7891 7892 7891 789278917890 AT GARAGE7889.85'7892.81'AT ENTRY C 7891 7891.9' 7892.1' 7890.7' 7891.4' SITE BENCHMARK ELEV: 7892.08' GHTH ST R E E T 7892 78907891 EXISTING TO REMAIN 16'-1 12"8'-0"FENCETO REMAIN CONCRETEPATIO TO BE REPLACED EXISTING WALLSTO REMAIN EXISTING WALLTO REMAIN FENCETO REMAIN EXISTING FLAGSTONE PATH TOP OF THRESHOLDTOP OF CONCRETE CITY OF ASPEN BLOCK: 8 LOT: A&B13,256 SQ.FT.±100'-0" = 7889.85' EXISTING MECHANICAL ACCESSTO REMAIN EXISTING PORTION OF HOUSE WITHIN THE REAR SETBACK WILL NOTBE INCREASED IN ANY NON-CONFORMITY RELATIVE TO THEELEMENTS WITHIN THE PROPERTY SETBACK 1 2 3 45 ROOF DECK ELEVATION #GRADE ELEVATION ROOF HT. OVERTOPOGRAPHY ACTUAL ROOF HT.OVER RESTRICTIVE GRADE 7890' 2 7909.85'7890'19'-10 3/16" 3 7901.68'7891' 4 7909.85'7892'17'-10 3/16" 5 7909.85'7891.5'18'-4 3/16" 7908.68'18'-10 3/16"1 (PROPOSED) ROOF HEIGHT OVER TOPOGRAPHY 11'-1 3/4" GRADE ELEVATION 7890' 7890' 7890.68' 7892' 7891.5' (EXISTING)MOSTRESTRICTIVE SAME SAME EXISTING SAME SAME SURVEYORVERIFICATION 520 N 8th StreetPR PROPOS SITE PLA 1/8 If there is to be any snowmelt, provide thefollowing:1. Snowmelt plan showing square footage.2. RREMP worksheet3. Insulation detail Provide access to the crawlspace, includingthe new crawlspacescreated by closing offthe tops of the pooland spa (2009 IRCR408.4). Provide access to theunderfloor spacecreated by theoverframing at thenew media room.(2009 IRC R408.4). Provide the finish floor level of the landings on each side of the new exterior door 111 as well as the threshold height. (2009 IRC R311.3) Existing survey has has been provided that accurately represents existing conditions. Existing site plan has also been added to the sheet set (Sheet A-001-X). Sheet index on sheet G-001 has been updated to show changes. We have incorporated a small amount of snow melt on the roof deck at the exterior of the hatch as well as some limited snow melt on the front walk. We have included a RREMP worksheet as well as the insulation information on the insulation schedule. See sheet A-001 for snow melt areas Crawl space access locations have been provided and called out on plans. The access for this area will be provided from the existing mechanical crawlspace that is accessed from a door on the outside of the home. See sheets A-101 & A-102 A crawl space access hatch has been added in the closet in Hall 114. See sheet A-102 for note. Elevations have been called out, as well as threshold height on door 111. See sheet A-102. 09/22/2017 Page: A-102 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Show all handrails in plans. Ends must return. (2009 IRC R311.7.7.2) Page: A-102 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide a fireplace registration form listing all fireplaces. If any are gas log inserts, provide full details complying with 2009 IRC ch 10. If factory built appliances, demonstrate compliance with manufacturer's installation instructions and provide the instructions. Page: A-104 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide details on the curb mounted roof access hatch clearly demonstrating compliance with what we discussed over email. Page: A-202 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: The east elevation is less than 3' from the property line. 2009 IRC R302.1 does not allow any windows at that distance. No new windows may be added. Existing windows pose a hazard. Walls and eaves must be 1 hour fire rated (provide assemblies). We should meet to discuss. Page: A-202 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Window 25 must be safety glazed due to proximity to the tub and shower. (2009 IRC R308.4) Show all handrails in plans. Ends must return. (2009 IRC R311.7.7.2) Provide a fireplace registrationform listing all fireplaces. If anyare gas log inserts, provide fulldetails complying with 2009 IRCch 10. If factory built appliances,demonstrate compliance withmanufacturer's installationinstructions and provide theinstructions. C E FBD 3 1 2 2A-301 1A-301 13'-6 3/4"10'-1 5/8"3'-3 1/2"22'-0 3/8"6'-8"18'-8 3/4"22'-9 1/4"DN 1/8":1'1/8":1'1/8":1'1/8":1'1/8":1'1/8":1' 1/8":1' 1/8":1' 1/8":1' /8":1' 8":1' 1/8":1'1/8":1' 1/8 ": 1/8":1'1/8":1'1/8":1' 1/8" :1 ' 1/8":1' 1/8":1' 1/8":1' 1/8":1' 1/8":1' 1/8":1'3'-0"3'-0" EXISTING CHIMNEY FEATURES TOREMAIN - TYPICAL ALL CHIMNEYS LOW ROOF TO NOT EXCEED EXISTINGNON - CONFORMITY RELATIVE TOENCROACHMENT WITHIN SETBACK ROOF DECK 301 TOP OF FFEL. = 120'-0" CONTINOUS GUARDRAIL AT 36" A.F.F.AROUND ENTIRETY OF ROOF DECKAND ROOF DECK ACCESS HATCH HANDRAIL ATTACHED TO GUARDRAILAT JUNCTION OF HATCH AND ROOFDECK - LIMIT DISCONTINUITY TOEXTENT POSSIBLE - PROVIDE FULLLANDING AT TOP OF STAIRS EVENWITH ROOF DECK SURFACE NEW HINGED CURB MOUNTED ROOFACCESS HATCH - BABCOCK DAVIS OREQUIVALENT PROVIDE DOWNLIGHT POLE MOUNTEDFIXTURE AT HATCH ENTRY TO ROOFDECK FULLY ADHERED MEMBRANEROOF W/ DECORATIVE BALLAST TREX DECKING OR SIMILAR 30 32 14'-3 7/8"TOP OF FFEL. = 120'-0" ROOF PLAN GENERAL NOTES 1. 2. ROOF MATERIALS ARE SHOWN - PATTERNS ARE ILLUSTRATI ALL DIMENSIONS ON THIS PLAN ARE TO FACE OF FINISH, Provide details on thecurb mounted roofaccess hatch clearlydemonstratingcompliance with whatwe discussed overemail. T.O. EXISTING ROOFEL. = +118' 10" T.O. F.F. @ MAIN LEVELEL. = +100' 0" T.O. F.F. @ ENTRYEL. = +103' 0" T.O. F.F. @ UPPER LEVELEL. = +108' 11" 1A-301 C B AEFD 11 17 18 19 20 21 12 13 14 15 16 PROPOSED GRADE EXISTING GRADE18'-9 3/4"22'-4 1/8"18'-10"EXISTING CHIMNEY FEATURES TOREMAIN - TYPICAL ALL CHIMNEYS 22'-4 1/8"22'-4 1/8"20'-0"2A-301 51234 T.O. EXISTING ROOFEL. = +118' 10" 16 22 23 24 25 0"23'-1 1/2"EAST ELEVATION1/4" = 1'-0"1A-202 The east elevation is less than 3' from theproperty line. 2009 IRC R302.1 does notallow any windows at that distance. No newwindows may be added. Existing windowspose a hazard. Walls and eaves must be 1hour fire rated (provide assemblies). Weshould meet to discuss. A-301 25 8'-10"Window 25 must be safety glazed due to proximity to the tub and shower. (2009 IRC R308.4) Handrails with returns have been shown. See sheets A-102 & A-103. These are gas appliances. Manufacturers information has been provided. More information on the roof access hatch has been provided. See sheet A-301 for new stair section. All points discussed over email have been shown. Roof hatch will be custom size that is manufactured by Rollamatic or similar (rollamatic.com). The wall from Grid line D to Grid line A is 5' from the property line. These are existing openings and new windows will be installed. The wall from Grid line D to Grid line F is 3'6" from the property line and will be fire rated (see sheets A-501 & A-502). All eves on the East side of the house will be fire rated (see Sheets A-501 & A-502). Window 11 has been removed (proposed window numbering has been updated on all drawings). Window 25 on sheet A-202 is now shown as tempered. 09/22/2017 Page: A-301 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Show the thermal envelope in the sections throuhout. Are the crawlspaces part of the thermal envelope? If not, they must be vented. Detail your approach complying with 2009 IRC R408. Page: A-501 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide documentation that your proposed roof assembly is a minimum Class B rated assembly (Ordinance 30, 2011). Depending on the roofing product, an underlayment may be required. This is typically an ESR or UL report. Revise roof details to match the report. Revise drawings as necessary to match report requirements. Page: G-001 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Provide an asbestos abatement clearance report. Page: G-002 File Name: 520 N 8TH ST PERMIT SUBMISSION.pdf Subject: PlanCheck Author: nickt Color: Include the area covered by the pergola as fire area. If total is greater than 5000 sqft, provide a sprinkler system. (Ordinance 31, 2011) Page: 3 File Name: Mechanical Design Narrative - 3-13-2017.pdf Subject: PlanCheck Author: nickt Color: Locate all equipment and provide access on the plans. Mechanical Design Narrative - 3-13-2017.pdf (5) LOWER LEVEL C E GBDF MECHANICAL PROJECT SCALE PROPOSED BUILDINGSECTIONS 1/4" = 1'-0" 16030.00 A-301ASPEN COLORADOPARCEL ID #273512114003520 N 8th StreetDATE PROPOSED BUILDING SECTION E/W 1/4" = 1'-0" 1A-301 PROPOSED BUILDING SECTION N/S 1/4" = 1'-0" 2A-301 Show the thermalenvelope in thesections throuhout.Are the crawlspacespart of the thermalenvelope? If not, theymust be vented. Detailyour approachcomplying with 2009IRC R408. INTERIOR INTERIOR Provide documentation that your proposed roof assembly is aminimum Class B rated assembly(Ordinance 30, 2011). Depending onthe roofing product, anunderlayment may be required. Thisis typically an ESR or UL report.Revise roof details to match the report. Revise drawings asnecessary to match reportrequirements. Provide an asbestos abatement clearance report. Include the area covered by the pergola as fire area. If total is greater than 5000 sqft, provide a sprinkler system. (Ordinance 31, 2011) 520 N. 8th St Design Assist Narrative Page 3 of 11 March 13, 2017 -Electric Heating Mats Provide electric heating mats for each of the main level bathrooms, and laundry room as the sole source of heating. Exact shape and coverage to be determined in the field to achieve the following minimum heat outputs/areas based on standard 12 W/sf electric mats. • Laundry 101 – 720 W (60 sf) • Bathroom 104 – 84 W (7 sf) • Bathroom 106 – 408 W (34 sf) • Bathroom 107 – 552 W (46 sf) -Fan Coils Provide fan coils based upon performance requirements shown below. Precise location of fan coils TBD, but general locations are as follows: Main level units in mechanical room or full height crawl space. Upper level unit in possible attic spaces above Bedroom 108 / Media room, or in mechanical room or crawl space using chases through the main level. Supply grilles shall be linear bars placed around perimeter or positioned to provide conditioned air to wash the windows. Return grilles shall be high in rooms to prevent stratification. All grilles shall be sized to limit noise to 25 N.C. Consider noise mitigation when placing units and extensively coordinate access with Architects and Interior Designers. -Condensing Units Provide a condensing unit (at least 2-stage) for each fan coil sized to properly match the cooling load. All condensing units shall be placed on the roof with clearances and line set lengths coordinated with the manufacturer. Precise location and screening TBD to limit visibility. Final placement to adhere to local sound ordinances. Fan Coil Number Area Served Heating Load (MBH) Cooling Load (MBH) Airflow (cfm)* 1 Living, Entry 44 50 3100 2 Kitchen, Dining (MUA) 113 36 2200 3 Upper Level 33 36 2200 *Sized for 55°F discharge air for cooling. Ensure heating/cooling capacities are met and coordinate airflow with manufacturer at altitude. Locate all equipmentand provide access on the plans. The converted crawlspace will be part of the thermal envelope. Drawings have been updated to show rigid insulation on the interior of the foundation wall. See sheets A-101, A-301, A-501 (Detail W-4), & A-602 The roof assembly has been updated to show "Class A" rating. Underlayment has been noted. See assembly R-1 on sheet A-501. Asbestos abatement has been completed. We are awaiting the final clearance report and will resubmit it prior to building permit. There was an error in our math when we originally calculated the total area. We have included the pergola within the fire area and still remain under 5000 sqft. See sheet G-002 This information has been added to the Architectural drawings. 09/22/2017 Page: 4 File Name: Mechanical Design Narrative - 3-13-2017.pdf Subject: PlanCheck Author: nickt Color: Indicate dryer duct routing and termination on plans. Page: 4 File Name: Mechanical Design Narrative - 3-13-2017.pdf Subject: PlanCheck Author: nickt Color: Provide a whole house ventilation system. Provide one line drawing showing ductwork and exterior intake. Page: 10 File Name: Mechanical Design Narrative - 3-13-2017.pdf Subject: PlanCheck Author: nickt Color: Note 22 requires contractor to use a complete set of MEP drawings prior to starting work. Provide those drawings. One line drawings are acceptable for building department review. Page: 10 File Name: Mechanical Design Narrative - 3-13-2017.pdf Subject: PlanCheck Author: nickt Color: Locate all wall and roof penetrations and dimension them from openings. Page: 2 File Name: Special Inspections.pdf Subject: PlanCheck Author: nickt Color: Special inspection agreement must be signed by the owner. Special Inspections.pdf (1) until call for cooling is met. MUA (Fan Coil FC-1) – Upon a call for make-up air from kitchen hood (no heating call), enable heating coil in FC-2, P-5 shall start and the 3-way mixing valve shall modulate to provide 70F (adj) supply air temperature based upon the supply air sensor in the supply duct until call for make-up air is met. Upon a call for heat, the valve shall modulate to provide 90F supply air. Exhaust Fans – Bath exhaust fans to be controlled by wall switches. The garage exhaust fan shall be interlocked with a carbon monoxide sensor & wall switch. Whenever carbon monoxide is detected, the fan shall run until the levels drop. The wall switch shall enable fan operation, but not disable it if carbon monoxide is detected. Interlock mechanical room fan with cooling only thermostat and damper on outside air duct. Energy Recovery Ventilator- Shall include percentage timer and point of use controller. Notes: Dryer vents shall be routed directly to exterior and not exceed 30 equivalent feet (unless allowed by manufacturer). For 2 or more dryers, provide transfer grille. Indicate dryer duct routing and termination on plans. 520 N. 8th St Design Assist Narrative Page 4 of 11 March 13, 2017 -Energy Recovery Ventilators (ERV’s) The total ventilation rate shall be at least 200 cfm (according to ASHRAE 62.2) and connected into the return duct for FC-1. The ventilation rate can be achieved using (1) RenewAire EV200. Some exhaust fans can be eliminated and replaced with return air vents to the ERV’s to provide more pressure balance. -Make-Up Air / Economizer Provide 1200 cfm (size to match hood exhaust) of make-up air to kitchen area, interlock controls with kitchen hood. An insulated outdoor air duct shall route from an exterior louver (location TBD) and connect to a return mixing box on FC-2. Verify size of kitchen hood with owner prior to install, contractor to balance MUA with exhaust and revise heat requirements as needed. -Humidification Provide Nortec RH2 humidifier (or equivalent) on FC-1 & FC-3. Ensure proper space is available for straight, unlined supply duct on either side of humidifier nozzle (precise length coordinated with manufacturer), with sloped pan and drain. Sequence of Operations Provide a whole house ventilation system. Provide one line drawing showing ductwork and exterior intake. 520 N. 8th St Design Assist Narrative Page 10 of 11 March 13, 2017 CONTRACTOR TO TEST CONDITIONS PRIOR TO SYSTEM FILL. WATER SOFTENERS OR OTHER DEVICES MAY BE REQUIRED TO IMPROVE WATER QUALITY. b. INCLUDE CORROSION INHIBITORS ON ALL PROPYLENE GLYCOL MIXTURES. c. PRIOR TO SYSTEM FILL, ALL TUBING SYSTEMS AND MANIFOLDS SHALL BE CLEANED AS PRESCRIBED BY THE TUBING MANUFACTURER. SUPPLY ALL TOOLS, CONNECTIONS, LABOR, AND ACCESSORIES NECESSARY TO PROPERLY REMOVE ALL FOREIGN MATERIAL, CHEMICAL, AND RESIDUE WITHIN THE TUBING SYSTEM BEFORE PERMANENTLY CHARGING THE SYSTEM AND PLACING INTO OPERATION. 22. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR. 23. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS. 24. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR Note 22 requires contractor to use a complete set of MEP drawings prior to starting work. Provide those drawings. One line drawings are acceptable for building department review. 520 N. 8th St Design Assist Narrative Page 10 of 11 March 13, 2017 CONTRACTOR TO TEST CONDITIONS PRIOR TO SYSTEM FILL. WATER SOFTENERS OR OTHER DEVICES MAY BE REQUIRED TO IMPROVE WATER QUALITY. b. INCLUDE CORROSION INHIBITORS ON ALL PROPYLENE GLYCOL MIXTURES. c. PRIOR TO SYSTEM FILL, ALL TUBING SYSTEMS AND MANIFOLDS SHALL BE CLEANED AS PRESCRIBED BY THE TUBING MANUFACTURER. SUPPLY ALL TOOLS, CONNECTIONS, LABOR, AND ACCESSORIES NECESSARY TO PROPERLY REMOVE ALL FOREIGN MATERIAL, CHEMICAL, AND RESIDUE WITHIN THE TUBING SYSTEM BEFORE PERMANENTLY CHARGING THE SYSTEM AND PLACING INTO OPERATION. 22. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR. 23. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS. 24. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR. 25. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS. Locate all wall and roof penetrations and dimension them from openings. Special inspection agreement must be signed by the owner. This information has been added to the drawing. This information has been clarified with the updated Mechanical Narrative. Per discussion with Taylor Critchlow at AEC - we have rewritten the narrative to indicate that these are not required. This information has been added to the drawing. This signature has been provided by owner. 09/22/2017 Page: S2.3 File Name: Structural Set .pdf Subject: PlanCheck Author: nickt Color: If a hot tub is ever expected to be placed on the roof deck, indicate on the structurals that the load is accounted for. Structural Set .pdf (1) If a hot tub is ever expected to be placedon the roof deck, indicate on the structurals that theload is accounted for. The submitted structural drawings are accounting for this hot tub load as noted. TJI spacing will go from 18" o.c. to 12" o.c. underneath the hot tub area - if provided in the future. 09/22/2017