Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (20).ARBK aec Architectural Engineering Consultants, Inc. Mechanical, Electrical, & Lighting Design Services An Office with LEEDTTMM Accredited Professionals 40801 US Hwy 6 & 24,Suite 214,Eagle-Vail, CO 81620 Post Office Box 8489,Avon, CO 81620 phone: 970-748-8520 email: stan@aec-vail.com:www.aec-vail.com 520 N. 8th St Design Assist Narrative To: Matthew Smith From: Bryan Webster Company: Thunderbowl Architects Project: 520 N. 8th St Phone: 970-618-1645 Project No.: 17003 Date: 08-22-2017 Re: MEP Planning Intro The Residence at 520 N. 8th St is approximately 4,900 square-feet (sf) in size and located in Aspen, CO. We are providing this document to set a basis of design and to assist a contractor in sizing and scope for the mechanical system. This document is intended to provide general design specifications and intent, but does not serve as a construction document. It is the contractor’s responsibility to provide a fully functioning system which adheres to local codes as well as best design practices. All sizing has been completed using computer load calculations based on the Architectural floor plans provided in March 2017. Reference permit documents for envelope assumptions & design conditions. Windows assumed to have U-values not exceeding 0.35 and Shading coefficients of 0.45 max. It should be noted that any changes to those plans may change the load calculations. Heating Systems Hydronic heating (under floor radiant and baseboard), forced air heating, domestic hot water production, kitchen makeup air requirements, and ~1000 sf of snowmelting (future) will be served by (2) 285 MBH input condensing boilers B-1 & B-2. Plant Equipment -Boilers B-1 & 2 – (2) 285 input MBH condensing boilers to serve domestic hot water (73 MBH), space heat (129 MBH), and make-up air (87 MBH based on 1200 cfm) using 30% Propylene Glycol (PG) & 140°F max supply temp. A heat exchanger (HX) will be used to separate the (future) snowmelt system (125 MBH) using 50% PG & 140°F max. -Water heater WH-1&2 – (1) 120 Gallon side-arm water heater -Pumps Provide variable speed boiler pumps and heating loop pump, and single speed domestic water pump, MUA FC-2 pump, and snow melt pumps. -Glycol Feeders Provide glycol feeder on either side of snowmelt HX. 09/22/2017 01/19/2018 nickt 520 N. 8th St Design Assist Narrative Page 2 of 10 March 13, 2017 -Expansion Tank Provide expansion tank on either side of snowmelt HX. Sequence of Operations (See boiler piping diagram for reference) - Boilers B-1 & B-2: The boilers and their associated boiler pumps shall stage and rotate to provide heating & domestic hot water. Upon a call for heating the boilers shall fire based upon an outdoor reset schedule with a maximum temperature at the boiler supply water temperature sensor of 140°F. Each boiler pump (P-1 & P-2) shall be controlled with a 0-10 VDC signal from its respective boiler to maintain a 30°F ΔT (adj.) between the supply water temperature sensor in the secondary loop and the boiler return water temperature sensor. Upon a call for domestic water heating, P-4 shall start (duty standby), and the boiler(s) shall provide 180°F supply water. - (Future) Snowmelt: The boilers shall provide heating for snowmelt operations. The snowmelt system will be located on the roof and other areas TBD by the Architect and shall not exceed ~1000 sf. The system shall be controlled according to an outdoor temperature sensor and a slab snow/ice sensor via Tekmar 654 controller (set into boiler control mode to provide slab protection). When the outdoor temperature is below 35°F (adj.), the snowmelt system shall be enabled, P-7 shall run, and the boilers and P-6 shall cycle/modulate to maintain a slab temperature of 28°F (adj.). If the system is enabled and moisture is sensed on either slab, boilers and P-6 shall cycle/modulate to maintain a slab temperature of 38°F (adj.). Space Heating Equipment -Radiant Heating Provide tubing loops to the bottom side of framing using Uponor Joist-Trak heat transfer panels (insulate below with R-19 minimum) for the following areas: Entry/Living Room/Kitchen, Media Room, Master Bedroom, Master Bath 202, Master Bath 204, Bedroom 206, Bath 205. Each area shall be a separate zone that will operate as either the first stage heating or just to maintain a warm floor. Coordinate loop quantity and lengths in field (not to exceed 250’), and install per manufacturer guidelines. -Baseboard Heating Runtal Baseboard Radiators to be used as the sole source of heating for all of the main level bedrooms. The exact length, height and model of heaters to be determined, but sizing shall be calculated to provide the following de- rated*, minimum heating output to each space. • Bedroom 103 – 3100 btu/hr • Bedroom 105 – 4900 btu/hr • Bedroom 108 – 8400 btu/hr * De-rated heat output to be calculated using 70°F EAT, and 125°F AWT 09/22/2017 520 N. 8th St Design Assist Narrative Page 3 of 10 March 13, 2017 -Electric Heating Mats Provide electric heating mats for each of the main level bathrooms, and laundry room as the sole source of heating. Exact shape and coverage to be determined in the field to achieve the following minimum heat outputs/areas based on standard 12 W/sf electric mats. • Laundry 101 – 720 W (60 sf) • Bathroom 104 – 84 W (7 sf) • Bathroom 106 – 408 W (34 sf) • Bathroom 107 – 552 W (46 sf) -Fan Coils Provide fan coils based upon performance requirements shown below. Precise location of fan coils TBD, but general locations are as follows: Main level units in mechanical room or full height crawl space. Upper level unit in possible attic spaces above Bedroom 108 / Media room, or in mechanical room or crawl space using chases through the main level. Supply grilles shall be linear bars placed around perimeter or positioned to provide conditioned air to wash the windows. Return grilles shall be high in rooms to prevent stratification. All grilles shall be sized to limit noise to 25 N.C. Consider noise mitigation when placing units and extensively coordinate access with Architects and Interior Designers. -Condensing Units Provide a condensing unit (at least 2-stage) for each fan coil sized to properly match the cooling load. All condensing units shall be placed on the roof with clearances and line set lengths coordinated with the manufacturer. Precise location and screening TBD to limit visibility. Final placement to adhere to local sound ordinances. Fan Coil Number Area Served Heating Load (MBH) Cooling Load (MBH) Airflow (cfm)* 1 Living, Entry 44 50 3100 2 Kitchen, Dining (MUA) 113 36 2200 3 Upper Level 33 36 2200 *Sized for 55°F discharge air for cooling. Ensure heating/cooling capacities are met and coordinate airflow with manufacturer at altitude. -Unit Heater The garage has a heating load 8 MBH. This load should be met with a hydronic unit heater sized by the manufacturer to provide output of 8 MBH using 140°F fluid with 30% Propylene Glycol at 8000’ asl. This will result in a unit with a nominal rating much higher than 8 MBH. -Exhaust Fans Provide exhaust in all bathrooms (~50-100 cfm for smaller bathrooms, and ~200 cfm for master bath) and ensure either dedicated fans or separate exhaust inlets in all toilet and shower rooms. Provide exhaust fan for garage with 100 cfm per vehicle, and not combined with any other exhaust duct. 09/22/2017 520 N. 8th St Design Assist Narrative Page 4 of 10 March 13, 2017 -Energy Recovery Ventilators (ERV’s) The total ventilation rate shall be at least 200 cfm (according to ASHRAE 62.2) and connected into the return duct for FC-1. The ventilation rate can be achieved using (1) RenewAire EV200. Some exhaust fans can be eliminated and replaced with return air vents to the ERV’s to provide more pressure balance. All ERV return air is exhausted outside, and balanced by an equal amount of tempered outside air directly into the FC-1 return duct. -Make-Up Air / Economizer Provide 1200 cfm (size to match hood exhaust) of make-up air to kitchen area, interlock controls with kitchen hood. An insulated outdoor air duct shall route from an exterior louver (location TBD) and connect to a return mixing box on FC-2. Verify size of kitchen hood with owner prior to install, contractor to balance MUA with exhaust and revise heat requirements as needed. -Humidification Provide Nortec RH2 humidifier (or equivalent) on FC-1 & FC-3. Ensure proper space is available for straight, unlined supply duct on either side of humidifier nozzle (precise length coordinated with manufacturer), with sloped pan and drain. Sequence of Operations Radiant / Baseboard / Unit Heater – Upon a call for heating, P-4 shall start (duty standby) and the 2-way valve shall open from heating water loop to respective zone / radiator until call for heating is met. Electric Mats – Upon a call from either wall mounted t-stat or floor sensor (coordinate with Architect / Control Contractor), heating may shall be enabled. Fan Coils (FC-1, FC-3) – Upon a call for heating, P-4 shall start (duty standby) and the 2-way valve shall open from heating water loop to respective fan coil to provide heated supply air until the call for heating is met. Upon a call for cooling, respective condensing unit shall run and fan shall start to provide cold supply air until call for cooling is met. MUA (Fan Coil FC-1) – Upon a call for make-up air from kitchen hood (no heating call), enable heating coil in FC-2, P-5 shall start and the 3-way mixing valve shall modulate to provide 70F (adj) supply air temperature based upon the supply air sensor in the supply duct until call for make-up air is met. Upon a call for heat, the valve shall modulate to provide 90F supply air. Exhaust Fans – Bath exhaust fans to be controlled by wall switches. The garage exhaust fan shall be interlocked with a carbon monoxide sensor & wall switch. Whenever carbon monoxide is detected, the fan shall run until the levels drop. The wall switch shall enable fan operation, but not disable it if carbon monoxide is detected. Interlock mechanical room fan with cooling only thermostat and damper on outside air duct. Energy Recovery Ventilator- Shall include percentage timer and point of use controller. Notes: Dryer vents shall be routed directly to exterior and not exceed 30 equivalent feet (unless allowed by manufacturer). For 2 or more dryers, provide transfer grille. 09/22/2017 520 N. 8th St Design Assist Narrative Page 5 of 10 March 13, 2017 Mechanical Specification 1. GENERAL: a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED IN THE NARRATIVE AND/OR SPECIFIED HEREIN. b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR NARRATIVE, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS. 2. WORKMANSHIP: a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT. 3. MATERIALS: a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED. 4. SITE INSPECTION: a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK. b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. 5. CODES AND PERMITS: a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2009 INTERNATIONAL MECHANICAL CODE (IMC), 2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE CITY OF ASPEN BUILDING DEPARTMENT. b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT. 6. AS-BUILTS: a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. 7. GUARANTEE: a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. 8. SUBMITTALS: a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALL OPTIONS CLEARLY MARKED) SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED. 09/22/2017 520 N. 8th St Design Assist Narrative Page 6 of 10 March 13, 2017 PERFORMANCE SELECTIONS REQUIRED FOR FAN COILS, HEAT EXCHANGERS, AND PUMPS. 9. COORDINATION: a. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC. 10. CUTTING AND PATCHING: a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK. b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT. c. X-RAY SLABS PRIOR TO CORING. 11. CLEANUP: a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY. 12. MECHANICAL IDENTIFICATION a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON EQUIPMENT. b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING DIRECTION OF FLOW. c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER. d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE ENGINEER FOR RECORD. 13. DUCTWORK: a. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2009 IMC AND SMACNA STANDARDS. b. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES INDICATED ARE INSIDE TO INSIDE [OUTSIDE TO OUTSIDE] DIMENSIONS. c. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR MESH. d. ALL FINAL CONNECTIONS TO SUPPLY GRILLES SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT UNLESS OTHERWISE NOTED ON THE PLANS. MINIMUM LENGTH IS 3’, MAXIMUM LENGTH IS 5’. e. FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED, VINYL COATED, WIRE REINFORCED FIBERGLASS, WITH MAXIMUM THERMAL CONDUCTIVITY OF 0.30 BTU-IN/HR-FT2-°F AND A MAXIMUM LENGTH OF FIVE FEET. f. CLOTHES DRYER VENT EXHAUST DUCTWORK SHALL BE ALUMINUM. DUCTWORK SHALL NOT BE CONNECTED OR INSTALLED WITH SHEET METAL SCREWS OR OTHER FASTENERS THAT WILL OBSTRUCT THE EXHAUST FLOW. TERMINATE WITH A WALL CAP WITH A BACK DRAFT DAMPER. SCREENS ARE PROHIBITED. REFER TO SECTION M1502 OF THE 2009 IRC FOR MAXIMUM DRYER EXHAUST DUCT LENGTHS. g. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE DROP PER 100 FEET. h. EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES. i. CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATION j. DOUBLE THICKNESS TURNING VANES SHALL BE USED ON ALL DUCT TURNS OF 90°. 09/22/2017 520 N. 8th St Design Assist Narrative Page 7 of 10 March 13, 2017 14. HEATING PIPING: a. HEATING HOT WATER PIPING 2½” INCHES AND BELOW SHALL BE TYPE "L" COPPER, HARD DRAWN, WITH WROUGHT COPPER SWEAT FITTINGS. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER. CONDENSER WATER AND HEATING HOT WATER PIPING 3" AND ABOVE SHALL BE SCHEDULE 40 BLACK STEEL A-53 SEAMLESS PIPE WITH WELDED FITTINGS. b. VALVES SHALL BE DANFOSS OR EQUAL; SERVICE PRESSURE SHALL BE AS REQUIRED. VALVES SHALL BE SUITABLE FOR SERVICE INTENDED. PROVIDE PRESSURE INDEPENDENT CONTROL VALVE MODELS FOR ALL VARIABLE SPEED SYSTEMS UNLESS NOTED OTHERWISE. c. PROVIDE HANGERS, SUPPORTS AND INSULATION SADDLES AS REQUIRED AND PER ANSI REQUIREMENTS. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE. d. PIPING SHALL BE SIZED AT A MAXIMUM PRESSURE DROP OF 3.5 FT PER 100 FEET & 4 FEET/SEC VELOCITY. UNLESS OTHERWISE NOTED, ALL PIPING SHOWN ON PLANS HAS BEEN SIZED FOR COPPER. PROVIDE DEDUCT ALTERNATE PRICING FOR PEX. IF PEX IS USED, UPSIZE PIPE BY 1 NOMINAL SIZE. e. CONTROL VALVE Cv RATINGS SHALL BE SELECTED AT A MAXIMUM PRESSURE DIFFERENTIAL ACROSS THE VALVE OF 2 PSI. f. PROVIDE 3” DIA. x 24" L SCHEDULE 40 PVC INLINE FILTER FILLED WITH LIMESTONE AGGREGATE TO NEUTRALIZE THE BOILER'S CONDENSATE DRAIN. g. PROVIDE EXPANSION JOINTS OR LOOPS ON ALL HEATING WATER PIPING RUNS IN EXCESS OF 50’. 15. REFRIGERANT PIPING: a. REFRIGERANT LINE SETS SHALL BE FURNISHED BY THE CONDENSING UNIT MANUFACTURER AND BE PRE-INSULATED. b. REFRIGERANT PIPING CONNECTIONS SHALL BE BRAZED WITH 15% SILL FLOSS. PURGE PIPING WITH NITROGEN WHILE BRAZING. c. PROVIDE HANGERS, SUPPORTS AND INSULATION SADDLES AS REQUIRED AND PER ANSI REQUIREMENTS. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE. d. REFRIGERANT PIPING INDICATED IS SCHEMATIC ONLY. SIZE PIPING AND DESIGN THE ACTUAL PIPING LAYOUT, INCLUDING OIL TRAPS, DOUBLE RISERS, SPECIALTIES, AND PIPE AND TUBE SIZES, TO ENSURE PROPER OPERATION AND COMPLIANCE WITH WARRANTIES OF CONNECTED EQUIPMENT. e. EVACUATE THE ENTIRE REFRIGERANT SYSTEM WITH A VACUUM PUMP TO A VACUUM OF 500 MICROMETER FOR A PERIOD OF 12 HOURS PRIOR TO CHARGING. 16. DUCTWORK INSULATION: a. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 OF THE 2009 IMC. b. INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 50, PER THE 2009 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS. c. RECTANGULAR SUPPLY, RETURN & TRANSFER DUCTWORK SHALL BE INTERNALLY LINED WITH A VAPOR RESISTANT DUCT LINER OF THICKNESSES SPECIFIED BELOW. d. CONCEALED ROUND, CONCEALED OVAL & OUTDOOR AIR DUCTS SHALL BE EXTERNALLY WRAPPED WITH FIBERGLASS INSULATION WITH AN EXTERNAL VAPOR BARRIER. REQUIRED R-VALUES ARE SPECIFIED BELOW. e. ALL SUPPLY, RETURN & TRANSFER DUCTWORK LOCATED WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED TO A MINIMUM OF R-4 (1” LINER) UNLESS SPECIFIED OTHERWISE ON THE PLANS. f. ALL SUPPLY DUCTWORK LOCATED IN ATTICS OR OTHER UNCONDITIONED SPACES SHALL BE INSULATED TO A MINIMUM OF R-8 (2” LINER). ALL OTHER DUCTS IN UNCONDITIONED SPACES SHALL BE INSULATED TO A MINIMUM OF R-6 (1-1/2” LINER). 09/22/2017 520 N. 8th St Design Assist Narrative Page 8 of 10 March 13, 2017 g. ALL OUTDOOR AIR DUCTS SHALL BE INSULATED TO A MINIMUM OF R-6 WITH A VAPOR BARRIER. 17. PIPING INSULATION: a. ALL HYDRONIC PIPING SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 1204 OF THE 2009 IMC. b. INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE DEVELOPED INDEX NOT MORE THAN 450, PER THE 2009 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC REQUIREMENTS. c. ALL HYDRONIC PIPING SHALL BE INSULATED TO A MINIMUM OF R-3. d. ALL PIPING ROUTED BELOW THE SLAB UNDERGROUND SHALL BE TYPE "k" COPPER AND SHALL BE INSULATED WITH ARMIFLEX TYPE INSULATION. 18. TEMPERATURE CONTROL DEVICES: a. CONTRACTOR SHALL PROVIDE STAND-ALONE CONTROLS CAPABLE OF MEETING THE SEQUENCE OF OPERATION DESCRIBED IN THE DESIGN NARRATIVE. b. THE HVAC SYSTEM SHALL BE PROVIDED WITH 7-DAY PROGRAMMABLE AUTOMATIC SPACE TEMPERATURE CONTROL DEVICES (THERMOSTATS) AS SHOWN ON THE PLANS. THE THERMOSTATS SHALL BE CAPABLE OF SCHEDULING OCCUPANCIES AND PROVIDING SETBACK CAPABILITIES TO MAINTAIN ZONE SETPOINTS DOWN TO 55°F OR UP TO 85°F. c. CONTROLS SHALL BE CAPABLE OF PROVIDING A DEADBAND OF AT LEAST 5°F BETWEEN HEATING AND COOLING. d. THERMOSTATS SHALL HAVE NUMERIC SET POINTS IN °F, ADJUSTABLE SETPOINT STOPS, AND SHALL BE MOUNTED AT 46" ABOVE FINISHED FLOOR ADJACENT TO THE ROOM'S LIGHT SWITCH. e. COORDINATE CONTROL TIE-INS WITH CONTROLS CONTRACTOR AS NECESSARY. f. ALL THERMOSTATS SHALL BE APPROVED BY THE OWNER. 19. SNOWMELT INSULATION: a. INSULATION SHALL BE INSTALLED UNDER ALL SNOWMELT AREAS, MINIMUM R-10. CONFIRM COMPRESSIVE STRENGTH RATING REQUIREMENTS WITH THE STRUCTURAL ENGINEER FOR EACH APPLICATION. INSULATION UNDER TRAFFIC AREAS MUST BE TRAFFIC RATED. BUBBLE-TYPE INSULATION IS PROHIBITED ENTIRELY. 20. GAS APPLIANCE VENTING: a. ACCEPTABLE VENT MATERIALS, ROUTING, DISTANCE AND TERMINATION LOCATIONS SHALL COMPLY WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS AND ALL REQUIREMENTS IN CHAPTER 8 OF THE 2009 IMC. PVC PIPING IS NOT ACCEPTED FOR BOILER OR WATER HEATER VENTING. POLYPROPYLENE PIPING MUST BE APPROVED FOR USE WITH APPLIANCE MANUFACTURER. CPVC MUST COMPLY WITH ASTM F441. 21. WATER QUALITY: a. HEATING AND CHILLED WATER CONDITIONS SHALL BE WITHIN HARDNESS AND PH RANGE SUITABLE FOR MECHANICAL EQUIPMENT (PER MANUFACTURER). CONTRACTOR TO TEST CONDITIONS PRIOR TO SYSTEM FILL. WATER SOFTENERS OR OTHER DEVICES MAY BE REQUIRED TO IMPROVE WATER QUALITY. b. INCLUDE CORROSION INHIBITORS ON ALL PROPYLENE GLYCOL MIXTURES. c. PRIOR TO SYSTEM FILL, ALL TUBING SYSTEMS AND MANIFOLDS SHALL BE CLEANED AS PRESCRIBED BY THE TUBING MANUFACTURER. SUPPLY ALL TOOLS, CONNECTIONS, LABOR, AND ACCESSORIES NECESSARY TO PROPERLY REMOVE ALL FOREIGN MATERIAL, CHEMICAL, AND RESIDUE WITHIN THE TUBING SYSTEM BEFORE PERMANENTLY CHARGING THE SYSTEM AND PLACING INTO OPERATION. 09/22/2017 520 N. 8th St Design Assist Narrative Page 9 of 10 March 13, 2017 22. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR. 23. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS. 24. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR. 25. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS. 26. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION. 27. TEST & BALANCING: a. THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST AND BALANCE COMPANY. b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ELECTRONIC DISTRIBUTION PREFERRED. c. ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE CONTRACTOR. d. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS. 28. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT). 29. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL. 30. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION & MAINTENANCE MANUAL’S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES. 31. FILTERS: a. SHALL BE UL RATED AND APPROVED. b. PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE. 32. ELECTRICAL CONNECTIONS: 09/22/2017 520 N. 8th St Design Assist Narrative Page 10 of 10 March 13, 2017 a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY THE MECHANICAL CONTRACTOR. b. UNLESS OTHERWISE SPECIFIED, ALL MOTORIZED DAMPERS SHALL BE LOW VOLTAGE. ALL WIRING AND POWER CONNECTIONS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. c. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE DRAWINGS. d. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS. e. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL. f. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION. g. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR. 33. ACOUSTICAL COMPLIANCE a. AEC IS NOT ABLE TO PROVIDE ACOUSTICAL MODELING OF EXTERIOR EQUIPMENT, NOR PROVIDE DOCUMENTATION SUPPORTING COMPLIANCE WITH THE CITY OF ASPEN NOISE ORDINANCE. AN ACOUSTICAL CONSULTANT IS RECOMMENDED TO VERIFY COMPLIANCE. NOISE MITIGATION MEASURES (BY OTHERS) MAY BE REQUIRED. 34. TEMPORARY HEATING DURING CONSTRUCTION: a. MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING. b. GAS FIRED TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. 09/22/2017