Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (21).ARBK aec Architectural Engineering Consultants, Inc. Mechanical, Electrical, & Lighting Design Services An Office with LEEDTTMM Accredited Professionals 40801 US Hwy 6 & 24,Suite 214,Eagle-Vail, CO 81620 Post Office Box 8489,Avon, CO 81620 phone: 970-748-8520 email: stan@aec-vail.com:www.aec-vail.com March 13, 2017 Matthew Smith Thunderbowl Architects 300 Spring St. Suite 20 Aspen, CO 81611 Re: 520 N. 8th St. Dear Matthew, This document is intended to show compliance of the remodeled residence located at 520 N. 8th St. in Aspen, CO with the 2009 International Energy Conservation Code (2009 IECC). We propose to use a prescriptive approach per sections 402.1-402.3 and 403.2.1 of the 2009 IECC. Project The project is a remodel with a total floor area of 4,900 sf. For heat load calculations, please refer to the following pages of this document. The heat load calculations are performed using the Carrier Hourly Analysis Program and provides a more detailed and accurate load than Manual J. A dewpoint calculation is not included in these permit documents, as the roof assembly meets the requirements of section R806.5 of the 2015 IRC. Building Envelope The following table lists the mandatory minimum insulation and fenestration requirements for the project in climate zone (7). Any assemblies not being altered during the remodel will remain as is, and all new assemblies will meet the following requirements. Fenestration U-factor Skylight U-factor Ceiling R-value Wood frame wall R-value Floor R-value Basement wall R-value Slab R-value Crawl Wall R-value Code Minimums 0.35 (1) 0.60 49 21 38 (2) 15/19 (3) 10 (4) 10/13 (5) Notes: 1) Fenestration SHGC requirements do not apply in climate zone (7) 2) Or insulation sufficient to fill the framing cavity, R-19 minimum 3) R-15 continuous insulation on the interior or exterior or R-19 cavity insulation on the interior of the basement wall. Can be satisfied with R-13 cavity plus R-5 continuous. 4) 4 ft deep and R-15 edge insulation for heated slabs 5) R-10 continuous insulation or R-13 cavity insulation. Sincerely, Bryan Webster City of Aspen Received 3/20/17 Building Department Zone Sizing Summary for hvac Project Name: 17003 - 520 N 8th St 03/13/2017 Prepared by: AEC 12:47PM Air System Information Air System Name hvac Equipment Class UNDEF Air System Type SZCAV Number of zones 1 Floor Area 4250.0 ft² Location Eagle, Colorado Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Calculation Months Jan to Dec Sizing Data Calculated Zone Sizing Data Maximum Design Minimum Time Maximum Zone Cooling Air Air of Heating Floor Sensible Flow Flow Peak Load Area Zone Zone Name (MBH)(CFM)(CFM)Load (MBH)(ft²)CFM/ft² Zone 1 132.8 9799 9799 Jul 1500 128.9 4250.0 2.31 Zone Terminal Sizing Data No Zone Terminal Sizing Data required for this system. Space Loads and Airflows Cooling Time Air Heating Floor Zone Name /Sensible of Flow Load Area Space Space Name Mult.(MBH)Load (CFM)(MBH)(ft²)CFM/ft² Zone 1 100a Entry 1 9.8 Jul 1500 683 10.8 275.0 2.48 100b Back Hall 1 1.5 Jul 1700 104 0.7 105.0 0.99 101 Laundry 1 7.5 Aug 1500 524 2.3 60.0 8.73 102 Garage 1 1.5 Jul 1600 370 7.9 450.0 0.82 103 Bedroom 1 1 2.8 Jul 1500 193 2.8 195.0 0.99 104 Bathroom 1 1 0.7 Jul 1500 52 0.2 60.0 0.86 105 Bedroom 2 1 3.8 Jul 1500 264 4.4 185.0 1.43 106 Bathroom 2 1 1.4 Jul 1000 96 1.2 65.0 1.47 107 Bathroom 3 1 1.7 Jul 1300 115 1.7 60.0 1.92 108 Bedroom 3 1 7.2 Jul 1300 501 7.6 185.0 2.71 109 Kitchen / Dining 1 30.0 Sep 1400 2082 23.2 590.0 3.53 111 Living Room 1 31.6 Aug 1500 2195 29.9 675.0 3.25 112 Media 1 4.3 Jul 1400 298 3.2 175.0 1.70 201 Closet 1 3.2 Aug 1500 225 4.1 105.0 2.15 202 Master Bath 1 10.1 Jul 1500 702 8.6 250.0 2.81 203 Master Bedroom 1 8.6 Jul 1400 596 9.2 365.0 1.63 204 His Master Bath 1 4.3 Jul 1400 296 3.5 190.0 1.56 205 Bath 4 1 0.9 Jul 1400 61 0.6 40.0 1.52 206 Bedroom 4 1 6.4 Jul 1400 443 7.0 220.0 2.01 Hourly Analysis Program v4.50 Page 1 of 1 City of Aspen Received 3/20/17 Building Department