Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (6).ARBK8th Street Remodel 520 N. 8th Street 3.8.17 1 1.0 - GENERAL CONDITIONS Division Cost 2 Subtotal:$44,871.40 3 2.0 - SITEWORK 4 Subtotal:$111,000.00 5 3.000 - CONCRETE 6 Subtotal:$40,980.00 7 4.0 MASONRY ALLOWANCES 8 Subtotal:$10,800.00 9 5.000 - METALS 10 Subtotal:$76,400.00 11 6.000 - WOOD & PLASTICS 12 Subtotal:$609,112.00 13 7.000 - THERMAL AND MOISTURE 14 Subtotal:$125,122.40 15 8.000 - DOORS AND WINDOWS 16 Subtotal:$104,680.80 17 9.000 - FINISHES 18 Subtotal:$281,429.20 19 10.0 - SPECIALTIES 20 Subtotal:$18,200.00 21 11.000 - APPLIANCES 22 Subtotal:$38,220.80 23 12.000 - FURNISHINGS 24 Subtotal:$14,000.00 25 13.0 - SPECIALTIES 26 Subtotal: 27 15.000 - MECHANICAL 28 Subtotal:$307,576.00 29 16.0 - ELECTRICAL 30 Subtotal:$170,900.00 31 Prepared by Scott C. Scherer 32 PRELIMINARY BUDGET:$1,953,292.60 PRELIMINARY PERMIT