Loading...
HomeMy WebLinkAboutFile Documents.520 N 8th St.0032.2017 (13).ARBK Date: Jun To: From: Permit No On June 8 Engineeri 520 North All addres Civil E ne 20th, 2017 Jack D Civil E Phone jack.da Roger High C 1517 B Glenw rneal@ o. 0032.2017. 8, 2017, High ing Departme h Eighth Stree ssed commen Engineerin 7 Danneberg Engineer, City 970/429-275 anneberg @c Neal Country Engin Blake Ave wood Springs, @hceng.com | .ARBK, 520 N Country Eng nt relating to et. A copy of nts by High C ng An Employ y of Aspen 50 ityofaspen.co neering CO 81601 970-945-867 N 8th St gineering, Inc the construct the original c ountry Engin yee-Owned Com om 76 c. (HCE) recei tions documen comments is a neering are un mpany ived commen nts and drain attached with nderlined and nts from the C nage study for responses. in red. Lan City of Aspen r the site locat nd Surveyin ted at ng 10/10/2017 0032 Page Index: 5 Author: jackd File Name: Civil Set .pdf Provide trench drain slope and detail. Civil Set .pdf (8) Page Index: 5 Author: jackd File Name: Civil Set .pdf The max curb cut is 18ft with 3ft wings. Page Index: 5 Author: jackd File Name: Civil Set .pdf How will irrigation ditch be protected during construction? Will the CMP under driveway remain during construction? If any portion of the ditch is being replaced provide details. Page Index: 5 Author: jackd File Name: Civil Set .pdf Is the existing water line being modified or retained? If there is any water line work proposed call out abandonment plans and proposed water line plans. Page Index: 5 Author: jackd File Name: Civil Set .pdf The architectural plans show a foundation 9ft deep in places. How will this foundation be installed? Provide excavation stabilization plans. Provide trench drain slope and detail. The max curb cut is 18ft with 3ft wings. How will irrigation ditch be protected during construction?Will the CMP under driveway remain during construction?If any portion of the ditch is being replaced provide details. Is the existing water line being modified or retained? If there is any water line work proposed call out abandonment plans and proposed water line plans. Trench drain slope has been added to grading plan and trench drain detail has been added to details sheet. Driveway curb cut has been revised to meet standards. Erosion control logs and additional silt fencing has been added to plans to protect ditch during construction. CMP will remain, and no portion of the ditch is to be replaced. Existing water line will be retained. No new foundations are being poured outside the existing building footprint-everything is existing to remain. 10/10/2017 Page Index: 5 Author: jackd File Name: Civil Set .pdf Provide profile view of pipes. Call out pipe size, type and slope on plan view. Page Index: 5 Author: jackd File Name: Civil Set .pdf Show asphalt patch according to city of aspen Construction and Excavation standards. Page Index: 7 Author: jackd File Name: Civil Set .pdf There are multiple dimensions here that are inconsistent with the plan, specifically diameter. Make sure that all dimensions are correct. Page Index: 12 Author: jackd File Name: Drainage Report 520 N 8th-Stamped.pdf Verify tree canopy credit with areal photography and more detailed calculations. Drainage Report 520 N 8th-Stamped.pdf (1) Provide profile viewof pipes.Call out pipe size,type and slope onplan view. Show asphalt patch according to city ofaspen Constructionand Excavation standards. There are multiple dimensions here that are inconsistent with the plan, specifically diameter. Make sure that all dimensions are correct. BASIN AREA (S.F.) IMPERVIOUS AREA (SF) PERCENT IMPERVIOUS PR-1 5,187 5,016 96.7%PR-2 5,707 45 0.8% PR-3 1,342 78 5.8%PR-4 996 121 12.1% TOTAL 13,232 5,260 39.7% Table 3. Tree Canopy Credit and Proposed WQCV TREE CANOPY CREDIT TREE TYPE CANOPY AREA (SF) CONIFEROUS 2,503.0 DECIDUOUS 3,640.0 IMPERVIOUSNESS SITE TOTAL AREA 5,260 EFFECTIVE AREA 3,963 EFFECTIVE (%) 29.9% WQCV (watershed-inches) 0.065 Volume (CF) 67.3 D. Operation and Maintenance The drywell will need to be inspected and cleared of rubbish and debris quarterly to make sure that the filter/riser pipe has not become clogged and is functioning properly. The top three inches of the lower chamber infiltration media shall be scarified yearly or more frequently to obtain optimum infiltration of surface runoff. If water is pooling, then the filter material may need to be scarified more frequently. If the filter material continues to fail, then the top six Verify tree canopy credit with areal photography and more detailed calculations. Pipe size, type and slope has been added to plan view of the grading plan. With the approval of the city engineer, profile views have not been provided. Drywell dimensions have been revised and updated. An additional exhibit has been provided in the drainage study to verify tree canopy credit. Asphalt patch is now shown on site and grading plans. 10/10/2017