HomeMy WebLinkAboutChange Order.520 N 8th St.0217.2018.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems____Ventilation Fans____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReviewDEFINITIONS08/14/2018 0032-20117-ARBK 0217.2018.ARBK
520 North 8th Street Aspen CO 81611 2735121140003
A and B 8 City and Townsite of Aspen with portions of vacated street
Jamie Alexander LLC 310-746-8887 jamiealexandertisch@icloud.com
Matthew Smith 970-618-1645 matthew@thunderbowlarchitects.com
Updates to roof deck layout & roof deck access hatch, addition of three windows, adjustment to snowmelt area, replacement of fence, updates to roof drain locations, removal of existing architectural site walls at entry
$1000.00
no change
no change
no change
no change
no change
no change
no change
JB 8/23/18x
25 x
x BM 10/11/18
x jd 9/7/18
x
**
08/23/2018
Dr 12/7/2018
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
LAND USE QUESTIONS
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or non-unit space
Work involves lot splitting or combining a lot
Work involves exterior of structure
Changing the number of residential units
Changes to number or location ofonsite parking
Work involves Landmark Parcel or Historic District
Located in 100-year flood plain or within 100’ of highwater mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
Does your permit involve any of the following?
ADDITIONAL SCOPE OF WORK QUESTIONS
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes plumbing fixturesDisturbs 1,000 sq ft or more of soil within 12 months
Work occurs in public right of way
Work affects trees or occurs within thedripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
August 2017
08/23/2018