Loading...
HomeMy WebLinkAboutChange Order.520 N 8th St.0217.2018.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact Energy Code REMP Ped. Amenity CMP (50%)Plan Check (Hourly)Housing Cash in Lieu Parks Review Zoning (Hourly)Stormwater Utility Review Engineering (Hourly)City Use Tax GIS County Use Tax SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted _________Census Code _________# of Dwellings _________Plans Location APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Re-viewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. DO YOU LIKE DOGS? December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReviewDEFINITIONS08/14/2018 0032-20117-ARBK 0217.2018.ARBK 520 North 8th Street Aspen CO 81611 2735121140003 A and B 8 City and Townsite of Aspen with portions of vacated street Jamie Alexander LLC 310-746-8887 jamiealexandertisch@icloud.com Matthew Smith 970-618-1645 matthew@thunderbowlarchitects.com Updates to roof deck layout & roof deck access hatch, addition of three windows, adjustment to snowmelt area, replacement of fence, updates to roof drain locations, removal of existing architectural site walls at entry $1000.00 no change no change no change no change no change no change no change JB 8/23/18x 25 x x BM 10/11/18 x jd 9/7/18 x ** 08/23/2018 Dr 12/7/2018 COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? LAND USE QUESTIONS ADDRESS: ____________________________PERMIT NUMBER: _______________________________ Part of an approved COA Land Use Review Work affects net leasable, net livable, or non-unit space Work involves lot splitting or combining a lot Work involves exterior of structure Changing the number of residential units Changes to number or location ofonsite parking Work involves Landmark Parcel or Historic District Located in 100-year flood plain or within 100’ of highwater mark Work involves changes in occupancy to structure Changes to elevator or stair configuration Changes to the use of existing structure or space Does your permit involve any of the following? ADDITIONAL SCOPE OF WORK QUESTIONS Exterior lighting added or changed Work involves roof penetrations Work adds, removes, or changes plumbing fixturesDisturbs 1,000 sq ft or more of soil within 12 months Work occurs in public right of way Work affects trees or occurs within thedripline of a tree Work involves exterior wall penetrations Work involves digging or excavation Work involves restaurant or food service Affects parking spaces/meters, loading zones, or alleys Adding structures or systems over utility lines Work within City Mall boundaries August 2017 08/23/2018