Loading...
HomeMy WebLinkAboutFile Documents.520 E Hyman Ave.0158.2018.ARBK Page 1 of 1 TRANSMITTAL Project: 0149.2019.ARBK – 520 E. Hyman 3 A/B Subject: Clarifications Date: 18 November 2019 To: City of Aspen, c/o Lauren Litchet Attachments:See below Clarifications Narrative: The attached documents represent clarifications to the permit documents. Attachments: · 0149.2019.ARBK_520 E Hyman 3AB_CLARIFICATIONS_20191118.pdf List of Transmitted Sheets: · A0.0 - revised; sheet index updated · A6.31 - revised; planter/spa construction and waterproofing updated to more accurately reflect structural detailing. Assembly conditions updated to match approved roof assembly. · A6.33 - new sheet; Planter construction and waterproofing detail clarifications. · A7.1 - revised; R-1 revised to match existing conditions. Added dewpoint table. · A7.1.1 - revised; Indoor air temp chart moved here from A7.1. · A7.2.1 - revised; Additional assemblies added. W-11 same as W-10 except exterior finish. · A7.12 - revised; Planter details revised to match changes on A6.31. · A7.13 - revised; Additional detail added to better define parapets, planters, etc.. Detail conditions around Patio 318 added. · A7.14 - revised; Planter details revised. Total: 9 sheets (24x36) _________________________________________________________________________________________ Thank You, Tim Owen (970) 549-0682 11/18/2019