Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.520 E Hyman Ave.0158.2018 (15).ARBK
Asbestos Inspection and Sampling Report 520 E Hyman Ave, Aspen, Colorado 81611 Presented To: Mr. Jerry Cavaleri Hansen Construction (970) 920-4480 jcavaleri@hansenconst.com Performed & Prepared By: Mr. Zack Westfall DS Environmental Consulting 12477 W Cedar Dr, Ste 101 Lakewood, CO 80228 (303) 304-1329 Project Details: Project Number: 16883 Conducted: September 5, 2017 06/11/2018 2 TABLE OF CONTENTS PROJECT OVERVIEW 1.0 Introduction 2.0 Scope of Work 3.0 Site Description 4.0 Certifications 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures 5.2 Sampling Procedures 5.3 Analytical Procedures 6.0 Homogeneous Areas 6.1 Material Friability 6.2 Material Classifications 6.3 Material Conditions 6.4 Sample Quantities 7.0 Overview of Findings 8.0 Conclusion & Recommendations 9.0 Asbestos Abatement & Demolition Requirements 10.0 Major & Minor Asbestos Spill Response Actions 11.0 Project Design & Project Manager Requirements 12.0 Disclaimer & Limitations 13.0 Copyright Notice APPENDIX A Inspector & Firm Asbestos Certificates APPENDIX B Analytical Data 06/11/2018 3 PROJECT OVERVIEW 1.0 Introduction On September 5, 2017, Mr. Zack Westfall with DS Environmental Consulting (DS) conducted a limited asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACM) within a portion of the single-family residence located at 520 E Hyman Ave, Aspen, Colorado. The purpose of the limited inspection was to identify and sample potentially hazardous friable and non- friable ACM that may be impacted by renovation activities. The following are the suspect asbestos-containing materials that were collected and their respective asbestos content: Material Asbestos Content Skip Trowel textured surfacing material, joint compound, and drywall found on the walls and ceilings throughout the residence None-Detected Mastic found behind the 12x12 tan ceramic wall tiles in the master bathroom None-Detected Mastic found behind the 12x12 tan ceramic wall tiles in the guest bathroom None-Detected Mastic found behind the 4x4 tan ceramic wall tiles in the children’s bathroom None-Detected Stucco surfacing material found on the exterior of the residence None-Detected White fibrous roof membrane found on the roof None-Detected 2.0 Scope of Work The scope of the limited inspection and bulk-sampling was limited to specific areas and materials of the residence defined by the restoration company as listed above. The remaining areas and materials within the residence, garage or any out-building on the property were not included in the scope of the inspection. The limited asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. 3.0 Site Description The residence is a single-level, single-family residence built in 1988. 4.0 Certifications The limited asbestos inspection and bulk-sampling was conducted by Mr. Zack Westfall with DS. DS is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm, Registration No. 14912. Mr. Westfall is a CDPHE certified Building Inspector; having certification number 22529 (see Appendix A for certificates). 06/11/2018 4 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and CDPHE certified Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk-samples. 5.2 Sampling Procedures Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE Regulation Number 8, Part B - Asbestos (Reg. 8). DS has collected the appropriate number of bulk-samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. Some minor destructive sampling was conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. 5.3 Analytical Procedures All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see Appendix B for laboratory report). The percentage of asbestos within each individual bulk-sample can vary depending on sample location, homogeneity of the material, and the type of application. Any sample reporting a “TRACE” amount of asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the point-count method and verified to be less than 1%. Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B – Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited to, the appropriate asbestos training for the type of material being removed/disturbed as well as having a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers, personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be landfill disposal requirements for these materials, depending on the facility. DS recommends that all demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been completed, but before any containments are dismantled and the area is reoccupied. 6.0 Homogeneous Areas A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of application. The asbestos content of the bulk-samples collected within a homogeneous area can be applied to the entire homogenous area if they conform to the above characteristics and the regulated minimum sample quantities of each type of material are collected and analyzed. 06/11/2018 5 6.1 Material Friability A material can either be friable or non-friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 6.2 Material Classifications Sampled materials are divided into one of the following three categories: Surfacing Material: sprayed or troweled onto structural building members Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation Miscellaneous Material: all other materials not classified in the above two categories 6.3 Material Conditions Sampled materials are placed into one of the three following categories of conditions: Good: none to very little visible damage or deterioration Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 6.4 Sample Quantities DS collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required. The following outlines the minimum sample quantities required per homogeneous area: Surfacing Materials: up to 1,000 ft2 of material requires a minimum of three (3) samples; between 1,000 ft2 and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ft2 of material requires a minimum of seven (7) samples; one (1) sample of each patch Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T’s. Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content 06/11/2018 6 7.0 Overview of Findings DS collected a total of sixteen (16) asbestos bulk-samples of seven (7) homogeneous areas. The following are the suspect asbestos-containing materials that were collected and their respective asbestos content: Material Asbestos Content Skip Trowel textured surfacing material, joint compound, and drywall found on the walls and ceilings throughout the residence None-Detected Mastic found behind the 12x12 tan ceramic wall tiles in the master bathroom None-Detected Mastic found behind the 12x12 tan ceramic wall tiles in the guest bathroom None-Detected Mastic found behind the 4x4 tan ceramic wall tiles in the children’s bathroom None-Detected Stucco surfacing material found on the exterior of the residence None-Detected White fibrous roof membrane found on the roof None-Detected Table 1 below describes the materials composing each homogeneous area as well as the locations of each bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample. Please see Appendix B: Analytical Data for the layer break-down of each bulk-sample. 06/11/2018 TABLE 1 HA - Homogeneous Area G - Good CHRY - Chrysotile SM - Surfacing Material ND - None-detected D - Damaged ACT - Actinolite MM - Miscellaneous Material TR - Trace, <1% Visual Estimate SD - Significantly Damaged TSI - Thermal System Insulation HA # Sample ID Sample Location Material Description Material Classification Material Condition Estimated Quantity Material Friability Asbestos Content 1 SM1-2 Dining Room – Northeast Corner Skip Trowel Textured Surfacing Material SM G ~2500 ft2 Friable ND SM1-3 Hallway Closet – East Wall SM1-4 Laundry Room – North Wall SM1-5 Living Room – Ceiling SM1-6 Children’s Bedroom – Ceiling SM1-7 Children’s Bathroom – Northwest Corner 2 JC1-1 East Guest Bedroom – Northwest Corner Skip Trowel Textured Surfacing Material and Joint Compound MM G ~2500 ft2 Friable ND 3 MA1-1 Master Bathroom – North Wall Mastic Behind 12x12 Tan Ceramic Wall Tiles MM G ~200 ft2 Friable ND 4 MA2-1 Guest Bathroom Shower – South Wall Mastic Behind 12x12 Tan Ceramic Wall Tiles MM G ~150 ft2 Friable ND 5 MA3-1 Children’s Bathroom – West Wall Mastic Behind 4x4 Tan Ceramic Wall Tiles MM G ~120 ft2 Friable ND 6 STCO 1-1 Main Outdoor Patio – South Wall Exterior Stucco Surfacing Material SM G ~800 ft2 Friable ND STCO 1-2 Main Outdoor Patio – East Wall STCO 1-3 Children’s Bedroom Patio – South Wall 06/11/2018 8 7 RM1-1 Roof White Fibrous Roofing Membrane MM G ~1000 ft2 Non-Friable ND RM1-2 Roof 06/11/2018 8.0 Conclusion & Recommendations Asbestos was not identified within the materials of the residence that were within the scope of the limited inspection and bulk-sampling performed on September 5, 2017; therefore, no professional abatement activities are required to remove or disturb the above-referenced sampled materials. 9.0 Asbestos Abatement & Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 50 linear ft. on pipes, 32 ft2 on other surfaces, or the volume equivalent of a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ft2 on other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DS can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated concrete), these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction-related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal- exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 10.0 Major & Minor Asbestos Spill Response Actions If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is deemed a “Major Asbestos Spill.” The area is consequently subject to the requirements in Reg. 8, Section III.T.1. – Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. 06/11/2018 10 Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish none-detected air pressure within the contaminated area in accordance with paragraph III.J. (Air Cleaning and None-detected Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings, corridor entrances, grills, drains, grates, diffusers and skylights. HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the contaminated area, or discard these materials. Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). HEPA vacuum or wet clean all surfaces in the contaminated area. Discard all materials in accordance with subsection III.R. (Waste Handling). Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area and Comply with any other measures deemed necessary by the Division to protect public health. In the event of an asbestos spill involving less than or equal to the trigger levels, the building owner or contractor should take the following non-mandatory steps: Restrict entry to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. Shut off or temporarily modify the air handling system to prevent the distribution of fibers to other areas in the building. Seal all openings between the contaminated and uncontaminated areas. This is to be accomplished by using polyethylene sheeting to cover all areas such as windows, doorways, elevator openings, corridor entrances, drains, grills, grates, diffusers and skylights. HEPA vacuum or steam clean all carpets, draperies, upholstery and other non-clothing fabrics in the contaminated area, or discard all contaminated materials in accordance with subsection III.R. (Waste Handling). Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). HEPA vacuum or wet clean all non-fabric surfaces in the contaminated area. Following completion of subparagraphs III.T.2.a. through III.T.2.f. of Regulation 8, conduct air monitoring as described in paragraph III.P.3 of Regulation 8. (Final Clearance Air Monitoring and Sample Analyses); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the work area. 06/11/2018 11 11.0 Project Design & Project Manager Requirements DS can provide an Asbestos Project Design as well as fulfill the Colorado Asbestos Project Manager requirements for any asbestos abatement project, as applicable below. Project Design An abatement Project Design is an accurate and detailed scope of work, which includes project specifications and procedures, containment design/equipment placement, and descriptions of engineering controls and work practices for an asbestos abatement project or response action that is required by CDPHE Regulation Number 8, Part B - Asbestos (Reg. 8) on large asbestos abatement projects. Prior to the start of any asbestos abatement project in a non-school building, where the amount of asbestos-containing material (ACM) to be removed or disturbed exceeds 1,000 linear feet on pipes, or 3,000 square feet on surfaces, or in a school building in which the amount of friable ACM to be abated exceeds 3 linear feet on pipes, or 3 square feet on surfaces, a written Project Design must be developed by a State of Colorado certified Project Designer in accordance with subsection IV.G.7 of Regulation 8. A signed copy shall be posted on-site prior to commencing any abatement activities, shall be available on- site at all times, and shall remain onsite until final air clearances have been completed by a State of Colorado-certified Air Monitoring Specialist (AMS). Project Manager A Project Manager shall be used on all asbestos abatement projects in which the amount of friable asbestos-containing material to be abated exceeds 1,000 linear feet on pipes, or 3,000 square feet on other surfaces per CDPHE Regulation Number 8, Part B – Section III.B.6. An asbestos Project Manager on an abatement project shall be responsible for assessing that the project is conducted in accordance with Regulation 8, assessing that the Project Design is followed, assessing that the abatement project is cleared in accordance with Regulation 8, assessing that the asbestos waste generated on the project is properly manifested and disposed of in accordance with Regulation 8, and communicating these assessments to the building owner or GAC. Project Managers must have proof of Colorado certification as an asbestos Project Designer and Air Monitoring Specialist in accordance with Section II of CDPHE Regulation 8 as well as a minimum of one (1) year of experience supervising, overseeing or monitoring asbestos abatement projects. A 4-year college degree in industrial hygiene, a degree in environmental health with a major concentration in industrial hygiene, or the possession of a certified industrial hygienist (CIH) certificate given by the American Board of Industrial Hygiene (ABIH) may be substituted for the Colorado asbestos Air Monitoring Specialist course. The GAC shall notify the building owner during bid proposals as to whether or not a project manager is required. Project managers shall be independent of the asbestos abatement contractor and work strictly on behalf of the building owner to the extent feasible, unless the abatement is being performed in-house. Project managers must sign the original copy of the abatement permit for the permit to be valid. 12.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. No warranty is either expressed or implied. DS assumes no responsibility or liability for error in public information utilized, statements from sources other than DS, or developments resulting from situations outside the scope of this project. 06/11/2018 12 The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date, the limited number of bulk-samples collected, and the laboratory results of those bulk-samples. The laboratory results contained in this report apply specifically to the materials in which bulk-samples were collected. The results do not include or apply to any other materials within the structure that were not sampled, but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk- sampling activities would be required to determine if any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the Client, with specific application to their project as discussed in the scope of work. The results of any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, etc. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the scope of work for abatement activities, bidding or billing purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. DS can provide a full scope of work for abatement upon request. DS does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 13.0 Copyright Notice © DS Environmental Consulting 2017. All Rights Reserved. This document contains material protected under Federal Copyright Laws. No part of this document or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author and DS Environmental Consulting. 06/11/2018 13 APPENDIX A INSPECTOR & FIRM ASBESTOS CERTIFICATES 06/11/2018 14 06/11/2018 15 APPENDIX B ANALYTICAL DATA 06/11/2018 Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2015 T:\QAQC\Lab\Reservoirs Environmental QA Manual.doc Subcontract Number:NA Laboratory Report:RES 389049-1 Project # / P.O. # 520 E. Hyman Ave. Aspen, CO Project Description:None Given RES 389049-1 Sincerely, September 13, 2017 Dear Customer, Reservoirs Environmental,Inc.is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP),Lab Code 101896-0 for Transmission Electron Microscopy (TEM)and Polarized Light Microscopy (PLM)analysis and the American Industrial Hygiene Association (AIHA),Lab ID 101533 -Accreditation Certificate #480 for Phase Contrast Microscopy (PCM)analysis.This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively. Reservoirs Environmental,Inc.has analyzed the following samples for asbestos content as per your request.The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office. DS Environmental Consulting 12477 W. Cedar Dr., Suite 101 Lakewood CO 80228 Zack Westfall is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer.Reservoirs Environmental,Inc.will not discuss any part of this study with personnel other than those of the client.The results described in this report only apply to the samples analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S.Government.This report shall not be reproduced except in full,without written approval from Reservoirs Environmental,Inc.Samples will be disposed of after sixty days unless longer storage is requested.If you have any questions about this report, please feel free to call 303-964-1986. Jeanne Spencer President P: 303-964-1986 F: 303-477-4275 5801 Logan Street, Suite 100 Denver, CO 80216 Page 1 of 1 1-866-RESI-ENV www.reilab.com 06/11/2018 RES Job Number: Client: Client Project Number / P.O.: Client Project Description: Date Samples Received: Turnaround: Date Samples Analyzed: RES 389049-1 DS Environmental Consulting 520 E. Hyman Ave. Aspen, CO None Given September 05, 2017 3-5 Day September 13, 2017 TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2015 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc RESERVOIRS ENVIRONMENTAL INC. NVLAP Lab Code 101896-0 Client Sample Number Lab ID Number L A Y E R Mineral Method:EPA 600/R-93/116 - Short Report, Bulk Physical Description Sub Part (%) Visual Estimate (%) ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite Non Asbestos Fibrous Components (%) Non- Fibrous Components (%) Asbestos Content SM1-1 EM 1934069 Sample Not Received. 1000SM1-2 EM 1934070 White joint compoundA 4 ND 595White tapeB 7 ND 1000Off white compound w/ off white paintC 8 ND 8515Gray/tan drywallD 81 ND 1000SM1-3 EM 1934071 Off white compound w/ off white paintA 12 ND 8515Gray/tan drywallB 88 ND 1000SM1-4 EM 1934072 Tan compound w/ off white paintA 15 ND 8515Gray/tan drywallB 85 ND 1000SM1-5 EM 1934073 White joint compoundA 8 ND 595White tapeB 10 ND 1000Off white compound w/ off white paintC 12 ND 8515Gray/tan drywallD 70 ND TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%. P: 303-964-1986 F: 303-477-4275 1-866-RESI-ENV www.reilab.com 5801 Logan Street, Suite 100, Denver, CO 80216 Page 1 of 4 06/11/2018 RES Job Number: Client: Client Project Number / P.O.: Client Project Description: Date Samples Received: Turnaround: Date Samples Analyzed: RES 389049-1 DS Environmental Consulting 520 E. Hyman Ave. Aspen, CO None Given September 05, 2017 3-5 Day September 13, 2017 TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2015 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc RESERVOIRS ENVIRONMENTAL INC. NVLAP Lab Code 101896-0 Client Sample Number Lab ID Number L A Y E R Mineral Method:EPA 600/R-93/116 - Short Report, Bulk Physical Description Sub Part (%) Visual Estimate (%) ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite Non Asbestos Fibrous Components (%) Non- Fibrous Components (%) Asbestos Content 1000SM1-6 EM 1934074 Off white compound w/ off white paintA 15 ND 8515Pink/tan drywallB 85 ND 1000SM1-7 EM 1934075 White joint compoundA 12 ND 595White tapeB 18 ND 1000Off white compound w/ off white paintC 25 ND 8515White/tan drywallD 45 ND 1000JC1-1 EM 1934076 White compoundA 1 ND 1000White joint compoundB 1 ND 1000Off white resinous materialC 2 ND 595White tapeD 2 ND 1000Tan compound w/ off white paintE 5 ND 8515Gray/tan drywallF 89 ND TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%. P: 303-964-1986 F: 303-477-4275 1-866-RESI-ENV www.reilab.com 5801 Logan Street, Suite 100, Denver, CO 80216 Page 2 of 4 06/11/2018 RES Job Number: Client: Client Project Number / P.O.: Client Project Description: Date Samples Received: Turnaround: Date Samples Analyzed: RES 389049-1 DS Environmental Consulting 520 E. Hyman Ave. Aspen, CO None Given September 05, 2017 3-5 Day September 13, 2017 TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2015 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc RESERVOIRS ENVIRONMENTAL INC. NVLAP Lab Code 101896-0 Client Sample Number Lab ID Number L A Y E R Mineral Method:EPA 600/R-93/116 - Short Report, Bulk Physical Description Sub Part (%) Visual Estimate (%) ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite Non Asbestos Fibrous Components (%) Non- Fibrous Components (%) Asbestos Content 1000MA1-1 EM 1934077 White compoundA 10 ND 595Tan fibrous materialB 30 ND 1000White granular materialC 60 ND 1000MA2-1 EM 1934078 White granular materialA 3 ND 1000Off white ceramic tileB 97 ND 1000MA3-1 EM 1934079 Gray granular cementitious materialA 3 ND 1000Off white ceramic tileB 8 ND 1000White granular materialC 89 ND 9010STCO1-1 EM 1934080 Gray granular cementitious material w/ white fibrous material A 35 ND 1000Red stucco w/ off white/gray paintB 65 ND 1000STCO1-2 EM 1934081 Gray granular cementitious material w/ white foamA 40 ND 1000Red stucco w/ off white/gray paintB 60 ND TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%. P: 303-964-1986 F: 303-477-4275 1-866-RESI-ENV www.reilab.com 5801 Logan Street, Suite 100, Denver, CO 80216 Page 3 of 4 06/11/2018 RES Job Number: Client: Client Project Number / P.O.: Client Project Description: Date Samples Received: Turnaround: Date Samples Analyzed: RES 389049-1 DS Environmental Consulting 520 E. Hyman Ave. Aspen, CO None Given September 05, 2017 3-5 Day September 13, 2017 TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2015 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc RESERVOIRS ENVIRONMENTAL INC. NVLAP Lab Code 101896-0 Client Sample Number Lab ID Number L A Y E R Mineral Method:EPA 600/R-93/116 - Short Report, Bulk Physical Description Sub Part (%) Visual Estimate (%) ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite Non Asbestos Fibrous Components (%) Non- Fibrous Components (%) Asbestos Content 1000STCO1-3 EM 1934082 Gray resinous materialA 8 ND 1000Red stucco w/ red paintB 10 ND 1000Gray stuccoC 15 ND 1000Red granular cementitious materialD 25 ND 1000Gray granular cementitious material w/ green & white fibrous material E 42 ND 8515RM1-1 EM 1934083 Black/off white resinous material w/ white fibrous woven material A 100 ND 8515RM1-2 EM 1934084 Black/off white resinous material w/ white fibrous woven material A 100 ND TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%. Analyst / Data QAAnalystAnalystAnalystAnalyst P: 303-964-1986 F: 303-477-4275 1-866-RESI-ENV www.reilab.com 5801 Logan Street, Suite 100, Denver, CO 80216 Page 4 of 4 06/11/2018