Page: 1.1 TITLE SHEET
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide the actual approved
state demo license document,
not just the number.
219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf (11)
Page: 1.7 FIRE AREA PLANS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Revise 1.7 to show the fire area
of the basement. Provide a total
area of all 3 floors as well.
Page: 3.1 LOWER LEVEL PLAN
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
This has not been addressed:
Provide access to the
crawlspace(s) per 2015 IRC
R408.4. If mechanical equipment
is located inside, access must be
sized and located per 2015 IMC
306. Pay attention to the
maximum distance from access
to equipment.
Page: 3.2 MAIN LEVEL PLAN
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Detail 1 on 7.2 is not a door
threshold detail. Detail 4/7.6
shows a threshold but it does not
match your plans. Plans show
landings at 99'-7 3/4" and interior
ply at 100' With a 3/4" finish floor
buildup, this creates a difference
of 5" between interior and
exterior. This is ok as long as the
doors do not swing over the step
and as long as there is not more
than 1 1/2" from top of threshold
to interior finish floor. Revise this
callout on this sheet (3.2) and
detail 4/7.6.
Page: 7.3 ROOF ASSEMBLIES & DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
If the spray foam in the roof and
wall cavities is your air barrier,
you'll need to seal between
double top plates, bottom plates,
headers, stud packs, etc. to
keep the air barrier continuous.
219 N. MONARCH ST.
Provide the actual approved state demo license document,not just the number.
7
5
6
4
2
G
G
F
F
1
3
316 sq ft
Revise 1.7 to show the fire area of the
basement. Provide a total area of all 3 floorsas well.
002a
002a
8'-4"4'-8"1'-0"2'-31/2"51/2"6'-7"51/2"3'-9"51/2"5'-0"1'-31/2"1'-0"3'-0"1'-31/210'-2"1'-31/21'-31/2"1 1'-31/2"9'-101/2"51/2"5'-8"51/2"002
8.58
5
6
4
7
WINE ROOM010
BATH
8.15
8.16
B5.2
I5.5
G5.6 H5.6
14.3
5
6
7
E
G F
This has not been addressed:
Provide access to the
crawlspace(s) per 2015 IRCR408.4. If mechanical equipment
is located inside, access must be
sized and located per 2015 IMC306. Pay attention to the
maximum distance from access
to equipment.
DESIGN CORPSALIUS
DESIGN CORPSALIUS
ASPEN, CO219 MONARCH STREETMTE1703
ISSUE
PROJECT No:DRAWN BY:
DRAWING SET
COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED
MAIN LEVEL PLAN
3.2
04/17/2017SCHEMATIC I SET 05/09/2017SCHEMATIC II SET 05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I
N112
105
106
107
114
113
104
103
111
110
109
108
F
Invalid parameters!3'-111/2"2'-01/2"22'-5"4'-6"7'-3"18'-10"10'-2"23'-101/2"6'-101/2"4'-1"
10"3'-0"51/2"9'-2"6'-4"51/2"3'-0"111/2"8'-01/4"51/2"6'-0"51/2"8'-01/4"111/2"4'-61/4"2'-23/4"111/2"10'-01/8"51/2"2'-1"51/2"15'-01/4"51/2"6"3'-0"51/2"6"6'-91/2"51/2"2'-1"51/2"5"3'-0"5"51/2"7'-3"28'-111/2"3'-111/2"51/2"5'-31/2"51/2"2'-5"2'-4"51/2"4'-3"51/2"5'-1"51/2"5'-9"51/2"3'-6"6'-1"51/2"2'-0"51/2"6'-6"51/2"2'-01/2"6'-31/2"9'-0"6'-31/2"3'-10"1'-0"1'-0"5'-2"2'-0"3'-31/2"
2'-73/4"2'-73/4"
1'-7"1'-7"100'-0"99'-73/4"
99'-73/4"
99'-73/4"
99'-73/4"
A5.1
B5.2
X6.1
C5.3
F5.5
#DrgID#LayID
#DrgID#LayID
14.2
14.1
24.3
ELEV.
UP
W3
W2
W1TYP. U.N.O.
W3
W3
1
28.13
3
1
28.93
5
7
8.9
48.9 6 8.9
98.9
4
DN
BEDROOM #6107
LIVING ROOM106
BREAKFASTAREA104
KITCHEN103
MUDROOM102
ENTRY109 TERRACE110
UP
BAR
DINING ROOM105
BATHROOM #6108
CL
CLCL
5
68.138
7
CL
CL
CL
T.O. PLY @ MAIN LEVEL
UCT. CONC.
W8
A
5
6
7
4
BCDE
2
F
1
33'-6"63/8"D5.4
SEE LANDSCAPE SHEETFOR SNOWMELT CALC; DETAILF10 ON 7.1 FOR ASSEMBLY
SEE DETAIL 1 ON SHEET7.2 FOR TYPICALDOOR THRESHOLD
ELON
3 8.10
2
1
28.11
8.121
1
T.O. CONC. @ ENTRY
T.O. CONC. @ PATIO
T.O. CONC. @ PATIO
T.O. CONC. @ PATIO
0 2'4'8'
11/27/17
Detail 1 on 7.2 is not a door threshold detail.Detail 4/7.6 shows a threshold but it does notmatch your plans. Plans show landings at 99'-73/4" and interior ply at 100' With a 3/4" finishfloor buildup, this creates a difference of 5"between interior and exterior. This is ok as longas the doors do not swing over the step and aslong as there is not more than 1 1/2" from top ofthreshold to interior finish floor. Revise thiscallout on this sheet (3.2) and detail 4/7.6.
DESIGN CORPSALIUS
DESIGN CORPSALIUS
ASPEN, CO219 MONARCH STREETMTE1703
ISSUE
PROJECT No:DRAWN BY:
DRAWING SET
COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED
ROOF ASSEMBLIES &DETAILS
7.3
04/17/2017SCHEMATIC I SET05/09/2017SCHEMATIC II SET05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I
PER ROOF PLAN
3/4"3/4"PER ROOF PLAN
7 1/4"1 1/2"7 1/4"PER ROOF PLAN
3/4"3/4"
1 1/2"
5/8" C/DX PLYWOOD SHEATHING
.018" THICK MIN. STANDINGSEAM METAL ROOF
5/8" GYP. BD. CEILING - TYP OVERHEATED SPACES
VAPOR BARRIER ATATTICE SPACE ONLY
8" R7/INCH BLOWN-IN POLY-ISO INSULATION(R-56 TOTAL; R-50 MINIMUM)
RAFTER RE:STRUCTURAL
TWO LAYERS VERSA SHIELDFIRE RESISTANT ROOF DECKPROTECTION
2X6 TRIM(@ VERTICAL SIDING)
2x8 R.S. CEDAR FASCIA
3/4" CDX PLYWOOD SHEATHING
RAFTERSSEE STRUCTURAL1X6 T&G SOFFIT
VERTICAL WOOD SIDING(PER SPECS)
4" ROUND METALGUTTER PER ROOF PLAN
2x6 RAFTER
3/4" T&G SOFFIT
METAL EDGE DRIP
ROOFING PER PLAN
2x8 R.S. CEDAR FASCIA
VERTICAL WOOD SIDING(PER SPECS)
2X6 TRIM(@ VERTICAL SIDING)
2x6 RAFTER
3/4" T&G SOFFIT
METAL EDGE DRIP
ROOFING PER PLAN
2x8 R.S. CEDAR FASCIA
TRANSITION FLASHING
CEILING FINISH PERPLAN
WOOD BEEM, SEE STRUCTURALWOOD BEAM; SEESTRUCTURAL
ROOFING PER PLAN
STANDING SEAM METALROOFING; SEE ROOF PLAN
2x8 R.S. CEDAR FASCIA3/4" CDX PLYWOOD SHEATHINGRAFTERSSEE STRUCTURAL1X6 T&G SOFFIT
STANDING SEAM METAL ROOFING
STANDING SEAM METAL; SEEROOF PLAN
METAL RIDGE CAP
7.3
1 ½" = 1'-0"R2TYPICAL ROOF W/ STANDING SEAM METAL
W3
R2
W2
TYPICAL RAKE @ SIDING101 ½" = 1'-0"
TYPICAL RAKE @ STONE111 ½" = 1'-0"8
7
R2
W2
TYPICAL EAVE @ SIDING1 ½" = 1'-0"
2
6
TYPICAL EAVE @ STONE
W3
1 ½" = 1'-0"
R2
62
R2
R2
1 ½" = 1'-0"9PITCH BREAK DETAIL
T. O. PLYWOODRIDGE118'-8 1/2"T. O. STRUCTURE118'-5 1/8"
1 ½" = 1'-0"RIDGE DETAILR2
13
CLASS AASSEMBLY PER ESR-2053
11/27/17
If the spray foam in theroof and wall cavities isyour air barrier, you'llneed to seal betweendouble top plates,bottom plates,headers, stud packs,etc. to keep the airbarrier continuous.
Hendrickson Construction to submit
Lower level added and total shown
confirmed w/ nick access was shown on
mech. drawings
correct detail called out 1/7.1
spray foam is barrier, all details updated
to show disimiliar materials being
addressed and spray foam added where
necessary, general detail showing
caulking and sealing req. added
1/16/18
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Is the sheathing your air barrier
or the spray foam or some
combination? What's your air
barrier?
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Detail or describe air barrier
continuity at intersections.
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Revise to be R-15 continuous
insulation at basement walls per
Rescheck.
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Revise to be R-15 continuous
insulation at basement walls per
Rescheck.
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
You've air sealed the garage
floor from the house but not the
wall or the top and bottom of the
wall.
2"SEE PLAN 3 1/2"5/8"
3"SEE PLAN 3 1/2"5/8"
5/8" GYP BD
WALL FRAMING W/BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD,SEE SCHEDULE
6" SOUND-ATTENUATION BATTS
5/8" GYPSUM WALL BOARD,SEE SCHEDULE
WALL FRAMING W/ BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING
R-15 RIGID INSULATION
FINISH GRADE
5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE
FURRED CEILING 5/8" GYPSUM BOARD FRAMINGPER STRUCTURAL
EXTEND SHEATHING PAST SILLAND CAULK TO FOUNDATION
SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE
99'-7"
T. O. STRUC 99'-2"
GARAGE TRANSITION DETAIL51 ½" = 1'-0"
NOT USED61 ½" = 1'-0"
GARAGE SLAB TO WALL DETAIL81 ½" = 1'-0"
TYPICAL T.O. FOUND. WALL CONDITION91 ½" = 1'-0"
T. O. PLYWOOD100'-0"
FINISH GRADE94'-0"
Is the sheathing yourair barrier or the spray
foam or somecombination? What'syour air barrier?
DESIGN CORPSALIUS
DESIGN CORPSALIUS
ASPEN, CO219 MONARCH STREETMTE1703
ISSUE
PROJECT No:DRAWN BY:
DRAWING SET
COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED
WALL DETAILS
7.4
04/17/2017SCHEMATIC I SET05/09/2017SCHEMATIC II SET05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I
2"SEE PLAN 3 1/2"5/8"
2"SEE PLAN 3 1/2"5/8"
3"SEE PLAN 3 1/2"5/8"
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED)
4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN
FIBERGLASS FILTER CLOTH
BACKFILL W/ SCREENED GRAVELR-11 RIGID INSULATION
WALL FRAMING W/BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD OROTHER INTERIOR FINISH -SEE SCHEDULE
SEE PLAN FOR FLOORING TYPE
SHEATHINGWATERPROOFING
METAL DRIP
MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED
GROUT & JOINTS PERAPPROVED MOCK-UP
3" (NOMINAL) STONE VENEER
HSS UNDER STONE; SEE STRUCTURAL FOR SIZE
STEEL BEAM, PACK OUT AS REQD; SEE STRUCTURAL
3/4" PLYWOOD
STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL
3/4" PLYWOODCONC SLAB; SEE STRUCTURAL
14" WOOD JOIST; SEESTRUCTURAL
5/8" GYP BD
5/8" GYPSUM WALL BOARD;SEE SCHEDULE
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTINGBACKFILL W/ SCREENED GRAVELR-15 RIGID INSULATION
WALL FRAMING W/BLOCKING AS REQUIREDCONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD,SEE SCHEDULE
BACKFILL W/ SCREENED GRAVELR-11 RIGID INSULATION
FIBERGLASS FILTER CLOTH
CONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE
FOUNDATION WATERPROOFING - CONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED)
R-13 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER)
METAL DRIP
DECKING
TAPERED INSULATION
6" SOUND-ATTENUATION BATTS
HSS UNDER STONE; SEESTRUCTURAL FOR SIZEWRAP WATERPROOFING AT STEELHSS
WATERPROOFINGSHEATHING
MTL. WALL TIES @ (1) PER 2 SQ. FT.MAX. - NON-CORRUGATED3" (NOMINAL) STONE VENEERMETAL DRIP
SIMPSON MTL HANGER; SEE STRUCTURAL
STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL
5/8" GYP BD
6" SOUND-ATTENUATION BATTS
FINISH GRADE SLOPE AWAY CONCRETE TOPPINGCONCRETE DECKING
5/8" GYPSUM WALL BOARD,SEE SCHEDULE
WALL FRAMING W/ BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING
R-15 RIGID INSULATION
WATERPROOFING WRAPPED UNDERCAP STONE(SHOWN DASHED)
MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED3" (NOMINAL) STONE VENEERMETAL DRIP
GROUT & JOINTS PERAPPROVED MOCK-UP
WATERPROOFINGSHEATHING
METAL DRIP
FINISH GRADE
CONCRETE DECKSTONE AT PATIO
3/4" PLYWOOD
WATERPROOFING
CONC. WALL RE: STRUCT.WALL FRAMING W/BLOCKING AS REQUIRED
5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE
FURRED CEILING 5/8" GYPSUM BOARD FRAMINGPER STRUCTURAL
EXTEND SHEATHING PAST SILLAND CAULK TO FOUNDATION
SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE
POLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0"
7.4 1 1/2" WALL DETAIL & ASSEMBLY TEMPLATE
7 TYPICAL FOOTER CONDITION1 ½" = 1'-0"
GL
T. O. PLYWOOD100'-0"T. O. SLAB99'-7"T. O. STRUCTURE99'-2"
DECK TRANSITION DETAIL41 ½" = 1'-0"
GARAGE ENTRY
DECK MASTER
GARAGE TRANSITION DETAIL51 ½" = 1'-0"
NOT USED61 ½" = 1'-0"
PATIO TRANSITION DETAIL11 ½" = 1'-0"
FLOOR @ FDN WALL/PATIO DETAIL21 ½" = 1'-0"
FLOOR @ FDN WALL DETAIL31 ½" = 1'-0"
T. O. PLYWOOD100'-0"
T. O. PLYWOOD99'-4 3/4"
GL
T. O. PLYWOOD88'-10"
T. O. PLYWOOD111'-0"T. O. PLYWOOD110'-10"
EXTERIOR LIVING ROOM
GARAGE SLAB TO WALL DETAIL81 ½" = 1'-0"
TYPICAL T.O. FOUND. WALL CONDITION91 ½" = 1'-0"
T. O. PLYWOOD100'-0"FINISH GRADE94'-0"
PLANTER DETAIL101 ½" = 1'-0"
T. O. PLYWOOD99'-4 3/4"
WALL FRAMING W/ BLOCKING AS REQUIRED
14" WOOD JOIST; SEESTRUCTURAL
14" WOOD JOIST; SEE STRUCTURAL
3/4" PLYWOOD
11/27/17
Detail or describe airbarrier continuity atintersections.
2"SEE PLAN 3 1/2"5/8"
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED)
4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN
FIBERGLASS FILTER CLOTH
BACKFILL W/ SCREENED GRAVEL
R-11 RIGID INSULATION
WALL FRAMING W/BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD OROTHER INTERIOR FINISH -SEE SCHEDULE
SHEATHINGWATERPROOFING
METAL DRIP
MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED
GROUT & JOINTS PERAPPROVED MOCK-UP
3" (NOMINAL) STONE VENEER
METAL DRIP
DECKINGPOLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0"
1 1/2" WAL
GL DECKRevise to be R-15continuous insulation
at basement walls per
Rescheck.AS 21
MTE1703
ISSUE
PROJECT No:DRAWN BY:
DRAWING SET
COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED
WALL DETAILS
04/17/2017SCHEMATIC I SET
05/09/2017SCHEMATIC II SET
05/15/2017RDS06/28/2017PERMIT SET
11/17/2017PERMIT SET_REV I
BACKFILL W/ SCREENED GRAVEL
R-11 RIGID INSULATION
FIBERGLASS FILTER CLOTH
CONC. WALL RE: STRUCT.
FOUNDATION WATERPROOFING - CONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED)
R-13 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER)
5/8" GYP BD
6" SOUND-ATTENUATION BATTS
CONC. WALL RE: STRUCT.
WALL FRAMING W/BLOCKING AS REQUIRED
UCTURE
FLOOR @ FDN WALL/PATIO DETAIL21 ½" = 1'-0"
T. O. PLYWOOD88'-10"
WALL FRAMING W/ BLOCKING AS REQUIRED
11/27/17
Revise to be R-15continuous insulation
at basement walls perRescheck.
2"SEE PLAN 3 1/2"5/8"
2"SEE PLAN 3 1/2"5/8"
WALL FRAMING W/BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
SEE PLAN FOR FLOORING TYPE
METAL DRIP STEEL BEAM, PACK OUT AS REQD; SEE STRUCTURAL
STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL
3/4" PLYWOOD
CONC SLAB; SEE STRUCTURAL
14" WOOD JOIST; SEESTRUCTURAL
5/8" GYP BD
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING
BACKFILL W/ SCREENED GRAVEL
R-15 RIGID INSULATION
WALL FRAMING W/BLOCKING AS REQUIRED
CONC. WALL RE: STRUCT.
5/8" GYPSUM WALL BOARD,SEE SCHEDULE
DECKING
TAPERED INSULATION
6" SOUND-ATTENUATION BATTS
WRAP WATERPROOFING A
NISH GRADE SLOPE AWAY
CONCRETE TOPPINGCONCRETE DECKING
5/8" GYPSUM WALL BOARD,
SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE
POLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0"
TYPICAL FOOTER CONDITION1 ½" = 1'-0"
T. O. PLYWOOD100'-0"T. O. SLAB99'-7"
T. O. STRUCTURE99'-2"
DECK TRANSITION DETAIL41 ½" = 1'-0"
GARAGE ENTRY
GARAGE TRANSITION DETAIL51 ½" = 1'-0"
PATIO TRA 1 1 ½" = 1'-0"
FLOOR @ 2 1 ½" = 1'-0"
GL
T. O. PLYWOOD111'-0"
T. O. PLYWOOD110'-10"
GARAGE SLAB TO WALL DETAIL1 ½" = 1'-0"
14" WOOD JOIST; SEESTRUCTURAL
You've air sealed thegarage floor from the
house but not the wallor the top and bottomof the wall.
see comment above
see comment above
revised
revised
wall between garage shown as spray foam
assembly W8
1/16/18
Page: 7.4 WALL DETAILS
File Name: 219 N Monarch Permit Set_REV I_111717 plan
review nick copy.pdf
Subject: PlanCheck
Author: nickt
Color:
Detail your air sealing strategy at
intersections. If the spray foam
in the cavities is your air barrier,
you'll need to seal between
double top plates, bottom plates,
headers, stud packs, etc. to
keep the air barrier continuous.
This location will also need spray
foam at the rim joist and sealant
between the sill plate and floor
sheathing.
Page: [6] 17042-M2.0-M2.0
File Name: Mechanical plans-072117.pdf
Subject: PlanCheck
Author: nickt
Color:
Note which fixtures will drain to
the lift station or provide a
plumbing plan
showing which fixtures will drain
into the lift station sump. Only
those fixtures that cannot drain
to the sewer by gravity may
drain to the lift station. 2015 IPC
712.1
Mechanical plans-072117.pdf (2)
Page: [13] 17042-M4.0, M4.1-M4.1
File Name: Mechanical plans-072117.pdf
Subject: PlanCheck
Author: nickt
Color:
The mechanical plans do not
appear to be updated. I will
include my previous comments
below which still need to be
satisfied:
Show your calculations used to
arrive at the CFM and
%continuous rate for the ERV.
Use this equation from
Ordinance 40, 2016:
Min vent rate = ((0.01 x floor
area) + [7.5 x (#bedrooms + 1)])
x 0.75
Revise control sequence note to
specify the number of hours it
will run for in each 4 hour period.
2"SEE PLAN 3 1/2"5/8"
2"SEE PLAN 3 1/2"5/8"
FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED)
4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN
FIBE
BAC
R-11
WAL BLO
CON
SEE PLAN FOR FLOORIN
FOUNDATI CONTINUE FOOTING
BACKFILL W
R-15 RIGID
WALL FRAM BLOCKING
CONC. WAL
5/8" GYPSU SEE SCHE
FINISH GRADE SLOPE AWAY
WATERPROOFING WRAPPED UNDERCAP STONE(SHOWN DASHED)
MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED
3" (NOMINAL) STONE VENEER
METAL DRIP
GROUT & JOINTS PERAPPROVED MOCK-UP
WATERPROOFINGSHEATHING
METAL DRIP
7.4
7 TYPICAL FOOTER CONDITION1 ½" = 1'-0"
GL
GL
PLANTER DETAIL101 ½" = 1'-0"
3/4" PLYWOOD
Detail your air sealingstrategy atintersections. If thespray foam in thecavities is your airbarrier, you'll need toseal between doubletop plates, bottomplates, headers, studpacks, etc. to keep theair barrier continuous.This location will alsoneed spray foam atthe rim joist andsealant between thesill plate and floorsheathing.
7/21/17
11/27/17
Note which fixtures will drain to the liftstation or provide a plumbing planshowing which fixtures will draininto the lift station sump. Onlythose fixtures that cannot drainto the sewer by gravity maydrain to the lift station. 2015 IPC712.1
e.HWS setpoint shall be ramped up to 160°F (adj) on a call for snowmelting.f.P-1 boiler pump shall run whenever associated boiler is called to fire.
3.WH-1, WH-2, WH-3, & WH-4 Indirect Water Heatersa.Upon a call for heating from temperature sensor TS-2 at WH-1 (set at 140°F adj), P-2 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).b.Upon a call for heating from temperature sensor TS-3 at WH-2 (set at 140°F adj), P-3 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).c.Upon a call for heating from temperature sensor TS-4 at WH-3 (set at 140°F adj), P-4 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).d.Upon a call for heating from temperature sensor TS-5 at WH-4 (set at 140°F adj), P-5 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).e.RP-1 domestic hot water recirculation pump shall be controlled automatically.
4.F-1 Furnace (Multi-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling or humidity.b.MODE: Furnace mode of operation (heating or cooling) shall be determined by the zone control board.c.COOLING: Upon a call for cooling, fan shall start and CU-1 condensing unit shall be enabled. Condensing unitshall be staged by integral controls to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start and gas-furnace shall start. 2-stage gas burner shall be cycledand staged by zoning control board to meet the space heating demand.e.ZONING: Provide a complete & operable zoning system, Honeywell or approved equal. Zoning system shallinclude 4 normally open zone dampers and 1 bypass damper. Zone dampers shall open/ close based on heating/cooling demand. Bypass damper shall modulate to maintain constant supply duct static pressure at pressure sensormounted in supply air duct. Exact static pressure setpoint shall be determined by contractor during TAB. Initialsetpoint is estimated to be approximately 0.5" w.c. When all zone dampers are in the open position, Bypassdamper, when setup properly, shall be fully closed.f.HUMIDIFICATION: See "Steam Humidifiers" sequence.
5.FC-2 Fan Coil (Single-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling, humidity, or kitchen make-up air.b.MODE: Fan coil mode of operation (heating or cooling) shall be determined by the thermostat.c.COOLING: Upon a call for cooling, fan shall start and CU-2 condensing unit shall be enabled. Condensing unitshall be cycled to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start, P-6 pump shall start, and boiler shall be enabled. P-6 pumpshall run full speed.e.KITCHEN MAKE-UP AIR: FC-2 blower shall be electrically interlocked with Kitchen exhaust hood. Normallyclosed OA damper shall partially open (1200 CFM), normally open RA damper shall partially close (1300 CFM),and both zone dampers shall open. P-6 FC-2 fan coil pump shall start to flow coil and boiler shall be enabled.Pump speed shall be varied by Tekmar 356 control to maintain 70°F (adj.) discharge air temperature at TS-6temperature sensor (mounted at FC-2 discharge). P-6 pump shall be disabled if OSA temperature is greater than65°F (adj). Pump shall run full speed upon a call for heating.f.HUMIDIFICATION: See "Steam Humidifiers" sequence.
6.F-3 Furnace (Multi-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling or humidity.b.MODE: Furnace mode of operation (heating or cooling) shall be determined by the zone control board.c.COOLING: Upon a call for cooling, fan shall start and CU-3 condensing unit shall be enabled. Condensing unitshall be staged to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start and gas-furnace shall start. 2-stage gas burner shall be cycledand staged by zoning control board to meet the space heating demand.e.ZONING: Provide a complete & operable zoning system, Honeywell or approved equal. Zoning system shallinclude 3 normally open zone dampers and 1 bypass damper. Zone dampers shall open/ close based on heating/cooling demand. Bypass damper shall modulate to maintain constant supply duct static pressure at pressure sensormounted in supply air duct. Exact static pressure setpoint shall be determined by contractor during TAB. Initialsetpoint is estimated to be approximately 0.6" w.c. When all zone dampers are in the open position, Bypassdamper, when setup properly, shall be fully closed.f.HUMIDIFICATION: See "Evaporative Humidifiers" sequence.
7.WCU-1 Wine Cooling Unita.COOLING: Upon a call for cooling, fan shall start and remote condensing unit shall be enabled. Condensing unitshall be controlled by integral controls to meet the cooling load.b.HUMIDIFICATION: Upon a call for humidification from wall mounted humidistat, humidifier shall start and fanshall start.
8.Snowmeltinga.Provide (1) snow/ice sensor and socket (Tekmar 091/094). Refer to M0.1 for location.b.Provide (1) Tekmar 667 snowmelt control with variable speed injection pumping.c.Upon a call for snowmelting from snow/ice sensor, P-8 snowmelt pump and P-7 heat exchanger pump shall start,and boiler shall be enabled. Tekmar control shall modulate speed of P-7 to maintain snowmelt water supplysetpoint at TS-7 temperature sensor. Setpoint shall be 120°F (adj).d.Provide a 12-hour timer switch in the mechanical room for manual override.e.Tekmar system shall be setup for WWSD (warm weather shut down) at approximately 45°F (adj). System shallnot operate if outdoor temperature is above this setting.f.Tekmar system shall be setup for CWCO (cold weather cut out) at approximately 10°F (adj). System shall notoperate if outdoor temperature is below this setting.
9.Fansa.DBF-1 dryer booster fan shall be controlled by an integral pressure sensing switch which recognizes dryeroperation and activates booster fan from an independent electrical circuit. Fan will automatically turn itself offwhen the dryer stops.b.EF-1 bath exhaust fans shall each be controlled by an on/off wall switch.c.EF-2 bath exhaust fan shall be controlled by (2) on/off wall switches wired in parallel. Locate switches in Bath 1and Bath 4.c.EF-3 bath exhaust fan shall be controlled by (3) on/off wall switches wired in parallel. Locate switches in Bath 2,Bath 5, and Powder.d.EF-4 garage exhaust fan shall be energized via a motion sensor in the garage ceiling. Once energized, fan shall runfor 30 minutes (adj) as set by adjustable timer. Any trigger of the motion sensor during the timed run period shallreset the timer.e.EF-5 mud room exhaust shall be controlled by a 12 hour timer switch.f.EF-6 crawlspace exhaust fan shall be controlled by a line voltage cooling thermostat and a dehumidistat wired inseries.g.RF-1 radon fan shall run continuously 24/7 (if installed). Provide an on/off wall switch for fan.
12.Electric Heat Matsa.EHM-X shall be controlled by a wall mounted programmable thermostat and floor sensor. The shower heat matshall be controlled in parallel with the main bath area heat mat by a single common thermostat, one per bathroom.Refer to Sheet M0.1 for thermostat and floor sensor locations.
13.Steam Humidifiersa.Provide (1) Nortec outdoor temperature sensor and (1) Nortec digital humidistat controller with remote transducerfor each humidifier.b.Upon a call for humidification from room mounted humidity transducer, associated fan shall start and once airflowis proven by air proving switch, humidifier shall start. Humidifier shall modulate to maintain humidity setpoint.c.Include a high limit duct humidistat located in the supply air duct, downstream of the steam absorption zone todisable humidifier if levels are too high.d.Digital humidistat controller shall automatically reset the humidity setpoint based on outdoor temperature.Outdoor reset curve shall be adjustable.e.Humidification shall be disabled during calls for cooling and make-up air.f.Integral controls shall automatically temper hot drain water by mixing cold domestic water to comply with code.
14.Evaporative Humidifiersa.Upon a call for humidification from wall mounted humidistat, associated fan shall start and humidifier shall cycleto maintain setpoint.b.Include an automatic humidifier control from humidifier manufacturer, which shall automatically reset thehumidity setpoint based on outdoor temperature. Outdoor reset curve shall be adjustable. Include outdoor airtemperature sensor.
15.Pumpsa.P-1 B-1 boiler pump: on whenever boiler is called to fire.b.P-2 WH-1 water heater pump: on upon a call for DHW heating from TS-2 temperature sensor.c.P-3 WH-2 water heater pump: on upon a call for DHW heating from TS-3 temperature sensor.d.P-4 WH-3 water heater pump: on upon a call for DHW heating from TS-4 temperature sensor.e.P-5 WH-4 water heater pump: on upon a call for DHW heating from TS-5 temperature sensor.f.P-6 FC-2 fan coil pump: on during a call for heat or make-up air.g.P-7 HX-1 heat exchanger pump: on upon a call for snowmelting. Pump is to be controlled for variable speedpumping via Tekmar 667 snowmelt control.h.P-8 snowmelt pump: on whenever there is a call for snowmelting.i.RP-1 domestic hot water recirculation pump: controlled automatically by integral controls.
7/21/17
11/27/17The mechanical plans do not appear to be updated. I will include myprevious comments below which still need to be satisfied:
Show your calculations used toarrive at the CFM and%continuous rate for the ERV.Use this equation fromOrdinance 40, 2016:Min vent rate = ((0.01 x floorarea) + [7.5 x (#bedrooms + 1)])x 0.75
Revise control sequence note tospecify the number of hours itwill run for in each 4 hour period.
see comments above; assemblies
addressed
previously noted on general notes sheet 1.2
current sets updated and confirmed via
email with Nick adequacy; nick R-5
continuous was also taken off design
criteria on the first page per your request
1/16/18