Loading...
HomeMy WebLinkAboutFile Documents.219 N Monarch St.0179.2017 (3).ARBK0179-2017-ARBK_BuildingComments_2 Page: 1.1 TITLE SHEET File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Provide the actual approved state demo license document, not just the number. 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf (11) Page: 1.7 FIRE AREA PLANS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Revise 1.7 to show the fire area of the basement. Provide a total area of all 3 floors as well. Page: 3.1 LOWER LEVEL PLAN File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: This has not been addressed: Provide access to the crawlspace(s) per 2015 IRC R408.4. If mechanical equipment is located inside, access must be sized and located per 2015 IMC 306. Pay attention to the maximum distance from access to equipment. Page: 3.2 MAIN LEVEL PLAN File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Detail 1 on 7.2 is not a door threshold detail. Detail 4/7.6 shows a threshold but it does not match your plans. Plans show landings at 99'-7 3/4" and interior ply at 100' With a 3/4" finish floor buildup, this creates a difference of 5" between interior and exterior. This is ok as long as the doors do not swing over the step and as long as there is not more than 1 1/2" from top of threshold to interior finish floor. Revise this callout on this sheet (3.2) and detail 4/7.6. Page: 7.3 ROOF ASSEMBLIES & DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: If the spray foam in the roof and wall cavities is your air barrier, you'll need to seal between double top plates, bottom plates, headers, stud packs, etc. to keep the air barrier continuous. 219 N. MONARCH ST. Provide the actual approved state demo license document,not just the number. 7 5 6 4 2 G G F F 1 3 316 sq ft Revise 1.7 to show the fire area of the basement. Provide a total area of all 3 floorsas well. 002a 002a 8'-4"4'-8"1'-0"2'-31/2"51/2"6'-7"51/2"3'-9"51/2"5'-0"1'-31/2"1'-0"3'-0"1'-31/210'-2"1'-31/21'-31/2"1 1'-31/2"9'-101/2"51/2"5'-8"51/2"002 8.58 5 6 4 7 WINE ROOM010 BATH 8.15 8.16 B5.2 I5.5 G5.6 H5.6 14.3 5 6 7 E G F This has not been addressed: Provide access to the crawlspace(s) per 2015 IRCR408.4. If mechanical equipment is located inside, access must be sized and located per 2015 IMC306. Pay attention to the maximum distance from access to equipment. DESIGN CORPSALIUS DESIGN CORPSALIUS ASPEN, CO219 MONARCH STREETMTE1703 ISSUE PROJECT No:DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED MAIN LEVEL PLAN 3.2 04/17/2017SCHEMATIC I SET 05/09/2017SCHEMATIC II SET 05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I N112 105 106 107 114 113 104 103 111 110 109 108 F Invalid parameters!3'-111/2"2'-01/2"22'-5"4'-6"7'-3"18'-10"10'-2"23'-101/2"6'-101/2"4'-1" 10"3'-0"51/2"9'-2"6'-4"51/2"3'-0"111/2"8'-01/4"51/2"6'-0"51/2"8'-01/4"111/2"4'-61/4"2'-23/4"111/2"10'-01/8"51/2"2'-1"51/2"15'-01/4"51/2"6"3'-0"51/2"6"6'-91/2"51/2"2'-1"51/2"5"3'-0"5"51/2"7'-3"28'-111/2"3'-111/2"51/2"5'-31/2"51/2"2'-5"2'-4"51/2"4'-3"51/2"5'-1"51/2"5'-9"51/2"3'-6"6'-1"51/2"2'-0"51/2"6'-6"51/2"2'-01/2"6'-31/2"9'-0"6'-31/2"3'-10"1'-0"1'-0"5'-2"2'-0"3'-31/2" 2'-73/4"2'-73/4" 1'-7"1'-7"100'-0"99'-73/4" 99'-73/4" 99'-73/4" 99'-73/4" A5.1 B5.2 X6.1 C5.3 F5.5 #DrgID#LayID #DrgID#LayID 14.2 14.1 24.3 ELEV. UP W3 W2 W1TYP. U.N.O. W3 W3 1 28.13 3 1 28.93 5 7 8.9 48.9 6 8.9 98.9 4 DN BEDROOM #6107 LIVING ROOM106 BREAKFASTAREA104 KITCHEN103 MUDROOM102 ENTRY109 TERRACE110 UP BAR DINING ROOM105 BATHROOM #6108 CL CLCL 5 68.138 7 CL CL CL T.O. PLY @ MAIN LEVEL UCT. CONC. W8 A 5 6 7 4 BCDE 2 F 1 33'-6"63/8"D5.4 SEE LANDSCAPE SHEETFOR SNOWMELT CALC; DETAILF10 ON 7.1 FOR ASSEMBLY SEE DETAIL 1 ON SHEET7.2 FOR TYPICALDOOR THRESHOLD ELON 3 8.10 2 1 28.11 8.121 1 T.O. CONC. @ ENTRY T.O. CONC. @ PATIO T.O. CONC. @ PATIO T.O. CONC. @ PATIO 0 2'4'8' 11/27/17 Detail 1 on 7.2 is not a door threshold detail.Detail 4/7.6 shows a threshold but it does notmatch your plans. Plans show landings at 99'-73/4" and interior ply at 100' With a 3/4" finishfloor buildup, this creates a difference of 5"between interior and exterior. This is ok as longas the doors do not swing over the step and aslong as there is not more than 1 1/2" from top ofthreshold to interior finish floor. Revise thiscallout on this sheet (3.2) and detail 4/7.6. DESIGN CORPSALIUS DESIGN CORPSALIUS ASPEN, CO219 MONARCH STREETMTE1703 ISSUE PROJECT No:DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED ROOF ASSEMBLIES &DETAILS 7.3 04/17/2017SCHEMATIC I SET05/09/2017SCHEMATIC II SET05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I PER ROOF PLAN 3/4"3/4"PER ROOF PLAN 7 1/4"1 1/2"7 1/4"PER ROOF PLAN 3/4"3/4" 1 1/2" 5/8" C/DX PLYWOOD SHEATHING .018" THICK MIN. STANDINGSEAM METAL ROOF 5/8" GYP. BD. CEILING - TYP OVERHEATED SPACES VAPOR BARRIER ATATTICE SPACE ONLY 8" R7/INCH BLOWN-IN POLY-ISO INSULATION(R-56 TOTAL; R-50 MINIMUM) RAFTER RE:STRUCTURAL TWO LAYERS VERSA SHIELDFIRE RESISTANT ROOF DECKPROTECTION 2X6 TRIM(@ VERTICAL SIDING) 2x8 R.S. CEDAR FASCIA 3/4" CDX PLYWOOD SHEATHING RAFTERSSEE STRUCTURAL1X6 T&G SOFFIT VERTICAL WOOD SIDING(PER SPECS) 4" ROUND METALGUTTER PER ROOF PLAN 2x6 RAFTER 3/4" T&G SOFFIT METAL EDGE DRIP ROOFING PER PLAN 2x8 R.S. CEDAR FASCIA VERTICAL WOOD SIDING(PER SPECS) 2X6 TRIM(@ VERTICAL SIDING) 2x6 RAFTER 3/4" T&G SOFFIT METAL EDGE DRIP ROOFING PER PLAN 2x8 R.S. CEDAR FASCIA TRANSITION FLASHING CEILING FINISH PERPLAN WOOD BEEM, SEE STRUCTURALWOOD BEAM; SEESTRUCTURAL ROOFING PER PLAN STANDING SEAM METALROOFING; SEE ROOF PLAN 2x8 R.S. CEDAR FASCIA3/4" CDX PLYWOOD SHEATHINGRAFTERSSEE STRUCTURAL1X6 T&G SOFFIT STANDING SEAM METAL ROOFING STANDING SEAM METAL; SEEROOF PLAN METAL RIDGE CAP 7.3 1 ½" = 1'-0"R2TYPICAL ROOF W/ STANDING SEAM METAL W3 R2 W2 TYPICAL RAKE @ SIDING101 ½" = 1'-0" TYPICAL RAKE @ STONE111 ½" = 1'-0"8 7 R2 W2 TYPICAL EAVE @ SIDING1 ½" = 1'-0" 2 6 TYPICAL EAVE @ STONE W3 1 ½" = 1'-0" R2 62 R2 R2 1 ½" = 1'-0"9PITCH BREAK DETAIL T. O. PLYWOODRIDGE118'-8 1/2"T. O. STRUCTURE118'-5 1/8" 1 ½" = 1'-0"RIDGE DETAILR2 13 CLASS AASSEMBLY PER ESR-2053 11/27/17 If the spray foam in theroof and wall cavities isyour air barrier, you'llneed to seal betweendouble top plates,bottom plates,headers, stud packs,etc. to keep the airbarrier continuous. Hendrickson Construction to submit Lower level added and total shown confirmed w/ nick access was shown on mech. drawings correct detail called out 1/7.1 spray foam is barrier, all details updated to show disimiliar materials being addressed and spray foam added where necessary, general detail showing caulking and sealing req. added 1/16/18 Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Is the sheathing your air barrier or the spray foam or some combination? What's your air barrier? Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Detail or describe air barrier continuity at intersections. Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Revise to be R-15 continuous insulation at basement walls per Rescheck. Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Revise to be R-15 continuous insulation at basement walls per Rescheck. Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: You've air sealed the garage floor from the house but not the wall or the top and bottom of the wall. 2"SEE PLAN 3 1/2"5/8" 3"SEE PLAN 3 1/2"5/8" 5/8" GYP BD WALL FRAMING W/BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD,SEE SCHEDULE 6" SOUND-ATTENUATION BATTS 5/8" GYPSUM WALL BOARD,SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING R-15 RIGID INSULATION FINISH GRADE 5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE FURRED CEILING 5/8" GYPSUM BOARD FRAMINGPER STRUCTURAL EXTEND SHEATHING PAST SILLAND CAULK TO FOUNDATION SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE 99'-7" T. O. STRUC 99'-2" GARAGE TRANSITION DETAIL51 ½" = 1'-0" NOT USED61 ½" = 1'-0" GARAGE SLAB TO WALL DETAIL81 ½" = 1'-0" TYPICAL T.O. FOUND. WALL CONDITION91 ½" = 1'-0" T. O. PLYWOOD100'-0" FINISH GRADE94'-0" Is the sheathing yourair barrier or the spray foam or somecombination? What'syour air barrier? DESIGN CORPSALIUS DESIGN CORPSALIUS ASPEN, CO219 MONARCH STREETMTE1703 ISSUE PROJECT No:DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED WALL DETAILS 7.4 04/17/2017SCHEMATIC I SET05/09/2017SCHEMATIC II SET05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I 2"SEE PLAN 3 1/2"5/8" 2"SEE PLAN 3 1/2"5/8" 3"SEE PLAN 3 1/2"5/8" FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED) 4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN FIBERGLASS FILTER CLOTH BACKFILL W/ SCREENED GRAVELR-11 RIGID INSULATION WALL FRAMING W/BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD OROTHER INTERIOR FINISH -SEE SCHEDULE SEE PLAN FOR FLOORING TYPE SHEATHINGWATERPROOFING METAL DRIP MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED GROUT & JOINTS PERAPPROVED MOCK-UP 3" (NOMINAL) STONE VENEER HSS UNDER STONE; SEE STRUCTURAL FOR SIZE STEEL BEAM, PACK OUT AS REQD; SEE STRUCTURAL 3/4" PLYWOOD STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL 3/4" PLYWOODCONC SLAB; SEE STRUCTURAL 14" WOOD JOIST; SEESTRUCTURAL 5/8" GYP BD 5/8" GYPSUM WALL BOARD;SEE SCHEDULE FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTINGBACKFILL W/ SCREENED GRAVELR-15 RIGID INSULATION WALL FRAMING W/BLOCKING AS REQUIREDCONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD,SEE SCHEDULE BACKFILL W/ SCREENED GRAVELR-11 RIGID INSULATION FIBERGLASS FILTER CLOTH CONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE FOUNDATION WATERPROOFING - CONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED) R-13 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) METAL DRIP DECKING TAPERED INSULATION 6" SOUND-ATTENUATION BATTS HSS UNDER STONE; SEESTRUCTURAL FOR SIZEWRAP WATERPROOFING AT STEELHSS WATERPROOFINGSHEATHING MTL. WALL TIES @ (1) PER 2 SQ. FT.MAX. - NON-CORRUGATED3" (NOMINAL) STONE VENEERMETAL DRIP SIMPSON MTL HANGER; SEE STRUCTURAL STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL 5/8" GYP BD 6" SOUND-ATTENUATION BATTS FINISH GRADE SLOPE AWAY CONCRETE TOPPINGCONCRETE DECKING 5/8" GYPSUM WALL BOARD,SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING R-15 RIGID INSULATION WATERPROOFING WRAPPED UNDERCAP STONE(SHOWN DASHED) MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED3" (NOMINAL) STONE VENEERMETAL DRIP GROUT & JOINTS PERAPPROVED MOCK-UP WATERPROOFINGSHEATHING METAL DRIP FINISH GRADE CONCRETE DECKSTONE AT PATIO 3/4" PLYWOOD WATERPROOFING CONC. WALL RE: STRUCT.WALL FRAMING W/BLOCKING AS REQUIRED 5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEESCHEDULE FURRED CEILING 5/8" GYPSUM BOARD FRAMINGPER STRUCTURAL EXTEND SHEATHING PAST SILLAND CAULK TO FOUNDATION SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE POLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0" 7.4 1 1/2" WALL DETAIL & ASSEMBLY TEMPLATE 7 TYPICAL FOOTER CONDITION1 ½" = 1'-0" GL T. O. PLYWOOD100'-0"T. O. SLAB99'-7"T. O. STRUCTURE99'-2" DECK TRANSITION DETAIL41 ½" = 1'-0" GARAGE ENTRY DECK MASTER GARAGE TRANSITION DETAIL51 ½" = 1'-0" NOT USED61 ½" = 1'-0" PATIO TRANSITION DETAIL11 ½" = 1'-0" FLOOR @ FDN WALL/PATIO DETAIL21 ½" = 1'-0" FLOOR @ FDN WALL DETAIL31 ½" = 1'-0" T. O. PLYWOOD100'-0" T. O. PLYWOOD99'-4 3/4" GL T. O. PLYWOOD88'-10" T. O. PLYWOOD111'-0"T. O. PLYWOOD110'-10" EXTERIOR LIVING ROOM GARAGE SLAB TO WALL DETAIL81 ½" = 1'-0" TYPICAL T.O. FOUND. WALL CONDITION91 ½" = 1'-0" T. O. PLYWOOD100'-0"FINISH GRADE94'-0" PLANTER DETAIL101 ½" = 1'-0" T. O. PLYWOOD99'-4 3/4" WALL FRAMING W/ BLOCKING AS REQUIRED 14" WOOD JOIST; SEESTRUCTURAL 14" WOOD JOIST; SEE STRUCTURAL 3/4" PLYWOOD 11/27/17 Detail or describe airbarrier continuity atintersections. 2"SEE PLAN 3 1/2"5/8" FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED) 4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN FIBERGLASS FILTER CLOTH BACKFILL W/ SCREENED GRAVEL R-11 RIGID INSULATION WALL FRAMING W/BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD OROTHER INTERIOR FINISH -SEE SCHEDULE SHEATHINGWATERPROOFING METAL DRIP MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED GROUT & JOINTS PERAPPROVED MOCK-UP 3" (NOMINAL) STONE VENEER METAL DRIP DECKINGPOLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0" 1 1/2" WAL GL DECKRevise to be R-15continuous insulation at basement walls per Rescheck.AS 21 MTE1703 ISSUE PROJECT No:DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED WALL DETAILS 04/17/2017SCHEMATIC I SET 05/09/2017SCHEMATIC II SET 05/15/2017RDS06/28/2017PERMIT SET 11/17/2017PERMIT SET_REV I BACKFILL W/ SCREENED GRAVEL R-11 RIGID INSULATION FIBERGLASS FILTER CLOTH CONC. WALL RE: STRUCT. FOUNDATION WATERPROOFING - CONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED) R-13 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) 5/8" GYP BD 6" SOUND-ATTENUATION BATTS CONC. WALL RE: STRUCT. WALL FRAMING W/BLOCKING AS REQUIRED UCTURE FLOOR @ FDN WALL/PATIO DETAIL21 ½" = 1'-0" T. O. PLYWOOD88'-10" WALL FRAMING W/ BLOCKING AS REQUIRED 11/27/17 Revise to be R-15continuous insulation at basement walls perRescheck. 2"SEE PLAN 3 1/2"5/8" 2"SEE PLAN 3 1/2"5/8" WALL FRAMING W/BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. SEE PLAN FOR FLOORING TYPE METAL DRIP STEEL BEAM, PACK OUT AS REQD; SEE STRUCTURAL STEEL BEAM, PACK OUT AS REQD; SEESTRUCTURAL 3/4" PLYWOOD CONC SLAB; SEE STRUCTURAL 14" WOOD JOIST; SEESTRUCTURAL 5/8" GYP BD FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING BACKFILL W/ SCREENED GRAVEL R-15 RIGID INSULATION WALL FRAMING W/BLOCKING AS REQUIRED CONC. WALL RE: STRUCT. 5/8" GYPSUM WALL BOARD,SEE SCHEDULE DECKING TAPERED INSULATION 6" SOUND-ATTENUATION BATTS WRAP WATERPROOFING A NISH GRADE SLOPE AWAY CONCRETE TOPPINGCONCRETE DECKING 5/8" GYPSUM WALL BOARD, SPRAY FOAM FOR AIRSEALANTFROM LIVING TOGARAGE SPACE POLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0" TYPICAL FOOTER CONDITION1 ½" = 1'-0" T. O. PLYWOOD100'-0"T. O. SLAB99'-7" T. O. STRUCTURE99'-2" DECK TRANSITION DETAIL41 ½" = 1'-0" GARAGE ENTRY GARAGE TRANSITION DETAIL51 ½" = 1'-0" PATIO TRA 1 1 ½" = 1'-0" FLOOR @ 2 1 ½" = 1'-0" GL T. O. PLYWOOD111'-0" T. O. PLYWOOD110'-10" GARAGE SLAB TO WALL DETAIL1 ½" = 1'-0" 14" WOOD JOIST; SEESTRUCTURAL You've air sealed thegarage floor from the house but not the wallor the top and bottomof the wall. see comment above see comment above revised revised wall between garage shown as spray foam assembly W8 1/16/18 Page: 7.4 WALL DETAILS File Name: 219 N Monarch Permit Set_REV I_111717 plan review nick copy.pdf Subject: PlanCheck Author: nickt Color: Detail your air sealing strategy at intersections. If the spray foam in the cavities is your air barrier, you'll need to seal between double top plates, bottom plates, headers, stud packs, etc. to keep the air barrier continuous. This location will also need spray foam at the rim joist and sealant between the sill plate and floor sheathing. Page: [6] 17042-M2.0-M2.0 File Name: Mechanical plans-072117.pdf Subject: PlanCheck Author: nickt Color: Note which fixtures will drain to the lift station or provide a plumbing plan showing which fixtures will drain into the lift station sump. Only those fixtures that cannot drain to the sewer by gravity may drain to the lift station. 2015 IPC 712.1 Mechanical plans-072117.pdf (2) Page: [13] 17042-M4.0, M4.1-M4.1 File Name: Mechanical plans-072117.pdf Subject: PlanCheck Author: nickt Color: The mechanical plans do not appear to be updated. I will include my previous comments below which still need to be satisfied: Show your calculations used to arrive at the CFM and %continuous rate for the ERV. Use this equation from Ordinance 40, 2016: Min vent rate = ((0.01 x floor area) + [7.5 x (#bedrooms + 1)]) x 0.75 Revise control sequence note to specify the number of hours it will run for in each 4 hour period. 2"SEE PLAN 3 1/2"5/8" 2"SEE PLAN 3 1/2"5/8" FOUNDATION WATERPROOFINGCONTINUE TO BOTTOM OFFOOTING (SHOWN DASHED) 4" DIAMETER A.B.S PERFORATEDFOUNDATION DRAIN FIBE BAC R-11 WAL BLO CON SEE PLAN FOR FLOORIN FOUNDATI CONTINUE FOOTING BACKFILL W R-15 RIGID WALL FRAM BLOCKING CONC. WAL 5/8" GYPSU SEE SCHE FINISH GRADE SLOPE AWAY WATERPROOFING WRAPPED UNDERCAP STONE(SHOWN DASHED) MTL. WALL TIES @ (1) PER 2SQ. FT. MAX. - NON-CORRUGATED 3" (NOMINAL) STONE VENEER METAL DRIP GROUT & JOINTS PERAPPROVED MOCK-UP WATERPROOFINGSHEATHING METAL DRIP 7.4 7 TYPICAL FOOTER CONDITION1 ½" = 1'-0" GL GL PLANTER DETAIL101 ½" = 1'-0" 3/4" PLYWOOD Detail your air sealingstrategy atintersections. If thespray foam in thecavities is your airbarrier, you'll need toseal between doubletop plates, bottomplates, headers, studpacks, etc. to keep theair barrier continuous.This location will alsoneed spray foam atthe rim joist andsealant between thesill plate and floorsheathing. 7/21/17 11/27/17 Note which fixtures will drain to the liftstation or provide a plumbing planshowing which fixtures will draininto the lift station sump. Onlythose fixtures that cannot drainto the sewer by gravity maydrain to the lift station. 2015 IPC712.1 e.HWS setpoint shall be ramped up to 160°F (adj) on a call for snowmelting.f.P-1 boiler pump shall run whenever associated boiler is called to fire. 3.WH-1, WH-2, WH-3, & WH-4 Indirect Water Heatersa.Upon a call for heating from temperature sensor TS-2 at WH-1 (set at 140°F adj), P-2 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).b.Upon a call for heating from temperature sensor TS-3 at WH-2 (set at 140°F adj), P-3 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).c.Upon a call for heating from temperature sensor TS-4 at WH-3 (set at 140°F adj), P-4 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).d.Upon a call for heating from temperature sensor TS-5 at WH-4 (set at 140°F adj), P-5 water heater pump shallstart. Boiler HWS setpoint shall be ramped up to 180°F (adj).e.RP-1 domestic hot water recirculation pump shall be controlled automatically. 4.F-1 Furnace (Multi-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling or humidity.b.MODE: Furnace mode of operation (heating or cooling) shall be determined by the zone control board.c.COOLING: Upon a call for cooling, fan shall start and CU-1 condensing unit shall be enabled. Condensing unitshall be staged by integral controls to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start and gas-furnace shall start. 2-stage gas burner shall be cycledand staged by zoning control board to meet the space heating demand.e.ZONING: Provide a complete & operable zoning system, Honeywell or approved equal. Zoning system shallinclude 4 normally open zone dampers and 1 bypass damper. Zone dampers shall open/ close based on heating/cooling demand. Bypass damper shall modulate to maintain constant supply duct static pressure at pressure sensormounted in supply air duct. Exact static pressure setpoint shall be determined by contractor during TAB. Initialsetpoint is estimated to be approximately 0.5" w.c. When all zone dampers are in the open position, Bypassdamper, when setup properly, shall be fully closed.f.HUMIDIFICATION: See "Steam Humidifiers" sequence. 5.FC-2 Fan Coil (Single-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling, humidity, or kitchen make-up air.b.MODE: Fan coil mode of operation (heating or cooling) shall be determined by the thermostat.c.COOLING: Upon a call for cooling, fan shall start and CU-2 condensing unit shall be enabled. Condensing unitshall be cycled to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start, P-6 pump shall start, and boiler shall be enabled. P-6 pumpshall run full speed.e.KITCHEN MAKE-UP AIR: FC-2 blower shall be electrically interlocked with Kitchen exhaust hood. Normallyclosed OA damper shall partially open (1200 CFM), normally open RA damper shall partially close (1300 CFM),and both zone dampers shall open. P-6 FC-2 fan coil pump shall start to flow coil and boiler shall be enabled.Pump speed shall be varied by Tekmar 356 control to maintain 70°F (adj.) discharge air temperature at TS-6temperature sensor (mounted at FC-2 discharge). P-6 pump shall be disabled if OSA temperature is greater than65°F (adj). Pump shall run full speed upon a call for heating.f.HUMIDIFICATION: See "Steam Humidifiers" sequence. 6.F-3 Furnace (Multi-Zone)a.BLOWER: Blower shall run for any calls for heating, cooling or humidity.b.MODE: Furnace mode of operation (heating or cooling) shall be determined by the zone control board.c.COOLING: Upon a call for cooling, fan shall start and CU-3 condensing unit shall be enabled. Condensing unitshall be staged to meet the space cooling demand.d.HEATING: Upon a call for heating, fan shall start and gas-furnace shall start. 2-stage gas burner shall be cycledand staged by zoning control board to meet the space heating demand.e.ZONING: Provide a complete & operable zoning system, Honeywell or approved equal. Zoning system shallinclude 3 normally open zone dampers and 1 bypass damper. Zone dampers shall open/ close based on heating/cooling demand. Bypass damper shall modulate to maintain constant supply duct static pressure at pressure sensormounted in supply air duct. Exact static pressure setpoint shall be determined by contractor during TAB. Initialsetpoint is estimated to be approximately 0.6" w.c. When all zone dampers are in the open position, Bypassdamper, when setup properly, shall be fully closed.f.HUMIDIFICATION: See "Evaporative Humidifiers" sequence. 7.WCU-1 Wine Cooling Unita.COOLING: Upon a call for cooling, fan shall start and remote condensing unit shall be enabled. Condensing unitshall be controlled by integral controls to meet the cooling load.b.HUMIDIFICATION: Upon a call for humidification from wall mounted humidistat, humidifier shall start and fanshall start. 8.Snowmeltinga.Provide (1) snow/ice sensor and socket (Tekmar 091/094). Refer to M0.1 for location.b.Provide (1) Tekmar 667 snowmelt control with variable speed injection pumping.c.Upon a call for snowmelting from snow/ice sensor, P-8 snowmelt pump and P-7 heat exchanger pump shall start,and boiler shall be enabled. Tekmar control shall modulate speed of P-7 to maintain snowmelt water supplysetpoint at TS-7 temperature sensor. Setpoint shall be 120°F (adj).d.Provide a 12-hour timer switch in the mechanical room for manual override.e.Tekmar system shall be setup for WWSD (warm weather shut down) at approximately 45°F (adj). System shallnot operate if outdoor temperature is above this setting.f.Tekmar system shall be setup for CWCO (cold weather cut out) at approximately 10°F (adj). System shall notoperate if outdoor temperature is below this setting. 9.Fansa.DBF-1 dryer booster fan shall be controlled by an integral pressure sensing switch which recognizes dryeroperation and activates booster fan from an independent electrical circuit. Fan will automatically turn itself offwhen the dryer stops.b.EF-1 bath exhaust fans shall each be controlled by an on/off wall switch.c.EF-2 bath exhaust fan shall be controlled by (2) on/off wall switches wired in parallel. Locate switches in Bath 1and Bath 4.c.EF-3 bath exhaust fan shall be controlled by (3) on/off wall switches wired in parallel. Locate switches in Bath 2,Bath 5, and Powder.d.EF-4 garage exhaust fan shall be energized via a motion sensor in the garage ceiling. Once energized, fan shall runfor 30 minutes (adj) as set by adjustable timer. Any trigger of the motion sensor during the timed run period shallreset the timer.e.EF-5 mud room exhaust shall be controlled by a 12 hour timer switch.f.EF-6 crawlspace exhaust fan shall be controlled by a line voltage cooling thermostat and a dehumidistat wired inseries.g.RF-1 radon fan shall run continuously 24/7 (if installed). Provide an on/off wall switch for fan. 12.Electric Heat Matsa.EHM-X shall be controlled by a wall mounted programmable thermostat and floor sensor. The shower heat matshall be controlled in parallel with the main bath area heat mat by a single common thermostat, one per bathroom.Refer to Sheet M0.1 for thermostat and floor sensor locations. 13.Steam Humidifiersa.Provide (1) Nortec outdoor temperature sensor and (1) Nortec digital humidistat controller with remote transducerfor each humidifier.b.Upon a call for humidification from room mounted humidity transducer, associated fan shall start and once airflowis proven by air proving switch, humidifier shall start. Humidifier shall modulate to maintain humidity setpoint.c.Include a high limit duct humidistat located in the supply air duct, downstream of the steam absorption zone todisable humidifier if levels are too high.d.Digital humidistat controller shall automatically reset the humidity setpoint based on outdoor temperature.Outdoor reset curve shall be adjustable.e.Humidification shall be disabled during calls for cooling and make-up air.f.Integral controls shall automatically temper hot drain water by mixing cold domestic water to comply with code. 14.Evaporative Humidifiersa.Upon a call for humidification from wall mounted humidistat, associated fan shall start and humidifier shall cycleto maintain setpoint.b.Include an automatic humidifier control from humidifier manufacturer, which shall automatically reset thehumidity setpoint based on outdoor temperature. Outdoor reset curve shall be adjustable. Include outdoor airtemperature sensor. 15.Pumpsa.P-1 B-1 boiler pump: on whenever boiler is called to fire.b.P-2 WH-1 water heater pump: on upon a call for DHW heating from TS-2 temperature sensor.c.P-3 WH-2 water heater pump: on upon a call for DHW heating from TS-3 temperature sensor.d.P-4 WH-3 water heater pump: on upon a call for DHW heating from TS-4 temperature sensor.e.P-5 WH-4 water heater pump: on upon a call for DHW heating from TS-5 temperature sensor.f.P-6 FC-2 fan coil pump: on during a call for heat or make-up air.g.P-7 HX-1 heat exchanger pump: on upon a call for snowmelting. Pump is to be controlled for variable speedpumping via Tekmar 667 snowmelt control.h.P-8 snowmelt pump: on whenever there is a call for snowmelting.i.RP-1 domestic hot water recirculation pump: controlled automatically by integral controls. 7/21/17 11/27/17The mechanical plans do not appear to be updated. I will include myprevious comments below which still need to be satisfied: Show your calculations used toarrive at the CFM and%continuous rate for the ERV.Use this equation fromOrdinance 40, 2016:Min vent rate = ((0.01 x floorarea) + [7.5 x (#bedrooms + 1)])x 0.75 Revise control sequence note tospecify the number of hours itwill run for in each 4 hour period. see comments above; assemblies addressed previously noted on general notes sheet 1.2 current sets updated and confirmed via email with Nick adequacy; nick R-5 continuous was also taken off design criteria on the first page per your request 1/16/18