HomeMy WebLinkAboutFile Documents.219 N Monarch St.0179.2017 (26).ARBKAn Employee-Owned Company
Date: December 9, 2019
City of Aspen
Pitkin County, Colorado
Vertical Setback Compliance Survey
Name of Project: 219 North Monarch Street
General Contractor: Sinclair Building, Architecture and Development
Based on a survey performed by High Country Engineering between June 20,
2019 and November 19, 2019, the highest point on the new residence constructed at
219 North Monarch Street, City of Aspen, has an elevation of 7921.00’. This point
was measured to the roof sheathing. The elevation of existing grade at this point
was found to be 7896.00’, which correlates to a height of 25.0’. When comparing the
survey data from said day to the provided information, this building does lie within
the vertical setback.
Please free feel to contact me with any questions.
Bill Baker, PLS #23875
High Country Engineering, Inc.
1517 Blake Avenue, Suite 101
Glenwood Springs, CO 81601
Email: bbaker@hceng.com
PH: 970-945-8676
Civil Engineering Land Surveying