Loading...
HomeMy WebLinkAboutFile Documents.219 N Monarch St.0179.2017 (26).ARBKAn Employee-Owned Company Date: December 9, 2019 City of Aspen Pitkin County, Colorado Vertical Setback Compliance Survey Name of Project: 219 North Monarch Street General Contractor: Sinclair Building, Architecture and Development Based on a survey performed by High Country Engineering between June 20, 2019 and November 19, 2019, the highest point on the new residence constructed at 219 North Monarch Street, City of Aspen, has an elevation of 7921.00’. This point was measured to the roof sheathing. The elevation of existing grade at this point was found to be 7896.00’, which correlates to a height of 25.0’. When comparing the survey data from said day to the provided information, this building does lie within the vertical setback. Please free feel to contact me with any questions. Bill Baker, PLS #23875 High Country Engineering, Inc. 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 Email: bbaker@hceng.com PH: 970-945-8676 Civil Engineering Land Surveying