HomeMy WebLinkAboutFile Documents.219 N Monarch St.0179.2017 (37).ARBKBUILDING
_ APPLICATION _
n ,,
m
i� , , pi, Townhome
THE CITY or ASPEN
For Building and Permit Information, please refer to our website at:
www.aspenpitkin.com
JOB ADDRESS �.- ZV&V "dd PARCEL I.D. NUMBER
The following are requirements for various types of projects. Permits must include ALL the items on
this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to the
Building Submittal Guide for clarifications and descriptions on each item.
❑ Be prepared to pay submittal fees at permit submittal. Contact a permit coordinator for a fee estimate.
❑ Submit a flash drive or disc with a copy of all documents and drawings in pdf format.
Documents (see submittal guide for number of conidsl_
Submittal
K
New
'
Addition
Alteration/
Interior
�E emo -
Repair
Requirements
Con uctiq
Remodel
only
�1 Jol'or
Alteration
complete
anning Appro Is
LV
❑
�lication
❑
V❑
V
V
V
Form Contact Sheet
Valuation
Adiustment Affidavit
_/ ❑
V ❑
V ❑
V ❑
& Construction Bid
HOA Certification
- ❑
V ❑
V ❑
V ❑
V ❑
IRC Building
,PEe::s:erir)ti6n--Fo-rm,
Asbestos
uestior>naire
Asbestos test and
V ❑
V ❑
V ❑
_V ❑
V ❑
clearance reports
State Asbestos
Demolition Approval
V ❑
Notice
Fireplace
Registration Form
Manufacturer's
V
-V El
_/ El
C1
installation
instructions
Energy Code
Compliance
Non -Vented Aoof
i
-V
VV
Assembly C a'Ics. i
U -Factor Y'
Fenestration Docsl
V b
V
❑
Y
6/29/2014 _
Page I of 2
Submittal
New
Addition
Alteration/
Interior
Demo
Repair
Requirements
Construction
Cover Sheet
Remodel
only
partial or
�/ °
Survey
Alteration
complete
RREMP documents
Excavation/ Earth
Retention Plans
-/ ❑
V ❑
Line Grade
S,
-V
-V F1
-V❑
Verification Form
i%
�/ ❑
❑
—_A -4,
-V❑
-V El
Area Sheet
y
-/ ❑
-V ❑
-V ❑
Verification of
Structural Inte rit
f'
Floor Plans
-V ❑
❑
°
°
Soils Report
�/ . /
�/ ❑
V
-V ❑
-V ❑�
Smuggler Superfund
�
-�/❑
-V El
Soil Removal Permit
-❑
-V ❑
'V ❑
�/ ❑
1/ ❑
1 ie, D
Details
-V
-/ ❑
-V ❑
-/ ❑
Signed Special
.J °
Fireplace Details
I/ s
-/ ❑
-/ ❑
1/ ❑
Inspection and
- °
-V °
I/ ❑
-V ❑
-V
Testing Agreement
Reflected Ceiling
Plans
--
°
-V ❑
❑
Lighting Plans
-V �1,
-/ ❑
-/ o
��/ ❑
Mechanical Docs
Mechanical Plans
❑
-V ❑
-V °
Photos
Structural Plans
';
- ❑
-V 0
-V °
-V °
Unit/Building
"tea
�/
A/ ❑
relationship
°
-V ❑
-/ ❑
24"x36" (2 COPIES) & 11"x17" (1 COPY) Puns
Sheets must be in the following order. Existin lans re uired for all additions & alterations
Submittal
Requirements
New
Constructio
iAlteration
Addition
Alteration/
Remodel
Interior
only
Demo
partial or
complete
Repair
Cover Sheet
�/
-/ ❑
�/ ❑
�/ °
Survey
-/ ❑
-V ❑
Excavation/ Earth
Retention Plans
�/ �/
V ❑
S,
-V
-V F1
-V❑
-V❑
-/❑
❑
—_A -4,
-V❑
-V El
Area Sheet
y
-/ ❑
-V ❑
-V ❑
Floor Plans
V
d ❑
❑
❑
-V ❑
-V ❑
Roof Plan
V
-V ❑
-V ❑�
-�/❑
-V El
-❑
nS
'V ❑
1/ ❑
1/ ❑
Details
-V
-/ ❑
-V ❑
-/ ❑
.J °
Fireplace Details
I/ s
-/ ❑
-/ ❑
1/ ❑
Schedules
-v
I/ ❑
-V ❑
'/ °
Reflected Ceiling
Plans
--
-V ❑
-V ❑
�/ ❑
Lighting Plans
-V �1,
-/ ❑
-/ o
��/ ❑
Mechanical Plans
V -�
Structural Plans
';
V ❑
-/ ❑
V ❑
Radon Plan
�/
A/ ❑
i
n'
6/29/2014 `r
Page 2 of 2