HomeMy WebLinkAboutFile Documents.219 N Monarch St.0073.2019.ARBK0056-2019-ARBK_BuildingComments_1
Page: 1
File Name: 219 N Monarch - 2015 IECC REMP Calcuations
20190403.pdf
Subject: Group
Author: nickt
Color:
Revise the REMP worksheet to
show the exempt spa
(56.25sqft), the amount
previously paid ($4533.33), and
sign the bottom.
219 N Monarch - 2015 IECC REMP Calcuations 20190403.pdf (1)
Page: 1
File Name: Scope of Work Narative - 4.3.19 Snowmelt
Submission - 219 N. Monarch.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide a drawing showing the
updated snowmelt areas that
can be scaled to allow for area
verification.
Scope of Work Narative - 4.3.19 Snowmelt Submission - 219 N. Monarch.pdf (1)
Owner's Representative :
Name:City: Aspen
Address:State: CO
Email:Zip Code:
Phone: Cell Phone:`
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool, spa, and solar/GSHP information:
Do you have snowmelt or a spa that has been exempted by the buiding official?
Hydro Snowmelt Electric Snowmelt Pool SpaExisting
To be DemoedExisting to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)253.00 sqft 0.00 sqftNew (exempt)Total New 253.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total on site 253.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftTotal Snowmelt on siteBoiler Efficiency 75.0%100%75.0% 75.0%Mitigation Payment -$ -$ Total Payment for Mitigation:11,469.33$
B. ON-SITE RENEWABLE CREDITS Supplemental System REMP CreditUse PV WorksheetPhotovoltaic System -$
Use Thermal WorksheetHot Water Panels -$ Use GSHP CertGround Source Heat Pump -$
Other Approved System -$ Total Mitigation Credits: -$
Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I need? 1.67
or How many square feet of SHW (solar hot water) would I need? 51.05
R-REMP Payment: 11,469.33$ Amount Previously Paid on This Permit:11,469.33$
Refund (includes minus $750): -$
C. PREPARED BY:Date:
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
970-319-0699
$11,469.33
TOTAL R-REMP PAYMENT:
Tom Stevens
253.00 sqft
ASI-7
Tstevens@stevensgroupinc.com
Yes (enter sqft below on the exempt row)No
Revise the REMP
worksheet to show theexempt spa
(56.25sqft), the
amount previouslypaid ($4533.33), andsign the bottom.
56.25
$4,533.33$6936.00
130 Primrose Path, Aspen, Colorado, 81611 Phone: 970-274-6324 Web: www.hendricksoninc.com
To Whom It May Concern, The following is a submission by Hendrickson Construction Inc. on behalf of CRMX-236, the owner of 219 N. Monarch. The work that we are submitting alters the amount of Snowmelt in the Exterior North Entrance
and South Terrace by adding additional square footage of Hydronic Snowmelt.
North Entrance (Front Terrace) – 50 SF This area covers the main front stoop of the home’s front door.
South Terrace – 203 SF
This covers the South Terrace Flatwork immediately outside of the glazing wall off the living room.
The Landscaping Plan Below shows a brief snapshot of the snowmelted area being submitted.
No Other snowmelt, Electrical or Hydronic is being submitted as a part of this change order.
REMP calcs included with the submission.
Provide a drawing
showing the updatedsnowmelt areas thatcan be scaled to allowfor area verification.