HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0130.2016 (14).ARBKRothberg Development
822 Bonita Dr
Aspen, CO 81611 a
adamrothberg@comcast.net
948-0480
Construction Management Plan
Chart House Lodge top floor/ aka Dancing Bear.
219 E Durant St.
1.0 Total square footage of disturbance shall be 6364 on the existing top floor of the Dancing
Bear. Project is located in the Central Resort Area.
2.0 Project Introduction: 219 E Durant St, known on previous permit as Chart House Lodge, aka
Dancing Bear.
2.1 Total project disturbance area shall be 6364, the project is mostly an interior
remodel with the additional of an outdoor grill and a patio.
2.2 Project vicinity map supplied by architect.
2.3 The Chart House Lodge/Dancing Bear has finished with construction and received
a Certificate of Occupancy. The lot square footage is 6000 and the upper floor
square footage is 2948. The proposed remodel shall include: Tile in bathrooms
and wood flooring throughout the interior, plastering walls, moving a door,
cabinet installation, plumbing fixture replacement, A/V installation. Installation of
outdoor tile on deck. 3 hot tubs and a fire table installed on the outdoor deck. NO
structural changes will be made. No sewer or storm water shall be affected. No city
water shall be affected.
3.0 Project Documentation
3.1 Permits, approvals, and Certificates of Occupancy for the Chart House Lodge are
available at the Aspen Building Department. Rothberg Development is applying
for a remodel permit for the top floor only and shall maintain insurance and proper
licensure throughout the project
3.2 A project sign including a date table notifying neighbors as to construction
progress shall be maintained on site, in addition, the Dancing Bear Management
Company shall be apprised as to progress on a continual basis.
3.3 Sign shall be posted on site.
3.4 Contact list:
Owner: Mediterranean Avenue LLC. 920-1280
Contractor: Rothberg Development, Adam Rothberg 948-0480
Site Supervisor: Adam Rothberg 948-0480 / Jose O’lave 404-1155
Safety Officer: Adam Rothberg/Jose O’lave
Traffic Officer: Adam Rothberg/Jose O’lave
Erosion Control Rep. Project is interior remodel
4.0 Project Implementation
4.1 Dates of Construction: Project shall begin upon permitting and shall take
approximately 5 months
4.2 Hours of construction: 7:30 am to 5 pm Monday thru Friday and 9 am to 5 pm on
Saturday.
4.3 Project shall commence with removal of: kitchen fixtures, bathroom tile floors, and
bathroom fixtures, and some lighting fixtures. Upon completion of removal and
demo, all items listed above shall be replaced with new items. 3 hot tubs shall be
installed, a fire table, all new flooring, new cabinetry, new plumbing fixtures. The
entire exterior floor shall be tiled. Interior floors shall be wood.
4.4 Property is a penthouse remodel and no fencing shall be required or possible.
4.5 No fencing shall be necessary or utilized.
4.6 No trees shall be removed or affected.
4.7 No permit shall be required from Parks Dept.
5.0 Site Management:
5.1 Right of Way Management Plan and encroachment is submitted with this CMP
and detailed on a full size survey, Appendix A.
5.2 Emergency access shall not be impeded in any way.
5.3 This project shall be under the category of Minor impact. Rothberg Development
utilizes it owns crew that carpools from Glenwood and arrives in two crew cab
trucks that carry equipment and workers.
5.4. Staging areas. No office trailer shall be utilized on site. No freight elevator exists
on premises therefore, all small materials and tools shall be carried up the stairs and
stored on the top floor where all work will be performed. All materials that can be
hauled up the South staircase shall be carried by dolly and hand. For large material
deliveries, a crane will be necessary. A 10 yard dumpster shall be used for
construction debris and shall be placed upon Dean Street as close to the curb as
possible as to not interfere with vehicular or pedestrian traffic. See appendix A. The
monthly rate for the 10 yrd dumpster at 12x6 is $302.40. The trailer and the dumpster
shall be alternated according to whether recyclable materials or refuse will require
removal from site.
The material delivery and crane rate at 1500 square feet shall be calculated per day.
Waste management: All materials removed from site shall be separated into wood,
plastic, stone, and re-usable piles. Any items that are reusable shall be loaded into a
trailer and stored for future use off-site. Any items that may be sold shall be sold. If
items cannot be sold then they will be recycled accordingly. Rothberg Development
shall utilize a trailer for recycling separately from garbage and non-recyclables.
6.0 Traffic Control: Aspen Street to Dean Street to Monarch St to Durant St to Aspen St to Main
St. During the material deliveries requiring a crane and delivery truck, traffic officers shall
close the east and west entrance of Dean street between Monarch and Aspen St. The parking
lot to the south will not be affected.
6.2 Material Delivery Trucks shall be unloaded on Dean St and shall be and carried up
the South stairway. Large material deliveries which will include hot tubs, large
appliances and large pre-assembled cabinetry will have to be craned to the top
floor. This should be required only a 4-5 times. The largest truck that will show up
will be the crane truck. The material truck and the crane will occupy approximately
75 ft along Dean St as hatched on Appendix A. Encroachment application is
Appendix C.
6.3 Specified above
6.4 No more than 1 delivery per day shall occur and most days there shall be no
deliveries. Deliveries shall only occur during working hours. No semi-trucks shall
be required, only flat bed trucks from Proguard or the like. No delivery truck shall
idle for more than 5 minutes.
6.5 Site is not in the central core and remodel shall require only minimal parking and
deliveries. No traffic shall be impeded.
7.0 Pedestrian traffic shall not be impeded in any way
8.0 Sediment and Erosion Control - Not applicable to interior remodel.
9.0 Fugitive Dust Control. No site work shall be done. No fugitive dust emissions will occur.
10.0 Emissions: All vehicles will maintain proper emission control as per state and city
requirements
11.0 Contractor has signed Construction Noise Suppression Plan simultaneous with permit
submission and will adhere to it. Appendix B
Appendices:
A-Site map for temporary encroachment plan.
B- Noise Suppression
C- Temporary Encroachment Application and Affidavit of Insurance coverage.
LL
EXISTING
COTTONWOOD
TREE (TYP OF 8)
IU l X
4FO"Ee. D U
— w
A N T A V E N U E
w I (75.00' Wide)w
NSW 6 CONIC. SIDgWALK
UE I I I
\ U UE
NOTES ` IREV
1. ARCHITECTURAL SITE PLAN BASED ON
INFORMATION FROM EXISTING CONDITIONS
SURVEY PREPARED BY ASPEN SURVEY j
ENGINEERS DATED 11/17/03. REFER TO
DRAWING SHEET NUMBER S 01. A.
2, REFER TO CIVIL DRAWINGS: C C2 AND C3 FOR EE
SITE UTILITY PLAN SEWER PLAN, bRAINAGE Ano
AND EROSION CONTROL PLAIj AND MISC. SITE BE
DETAILS.
3. REFER TO LANDSCAPE SITE PLAN: L1.1 a -
I
Lot 5 a
w
Lz
z
•-
IiSTAIREXIT AWNINGCap
K LINE
E
I -BI-DIRECTIONAL CROSSWALK ADA RAMPS
Sign Location
Revocable Encroachment
[NCHRec. No. 433366
See Notes, Item 18NALCROSSWALK RAMPS
17.1/2003 RE: CML
fSfING FOUNDATION TO
E AINWHERESHOWN
DRAIL
A TAIR
3 AIR
A2
i- / / YI•- rrse•- ) \ -- ENTR URANT
- LU - AS
I RES
/ 1 vAncN I 1 Sralawr DCI HIND E P R ADJACENT
PATIO / •-m^ rrsn'-®^) I' -m^ rs3m'-®•) -
�DEWALK
P. NOPY-TO-EXTEND
RAO embecia - — _� = BEYO ROPERTY
nss. N�. slerso&szoael / ) G E
See Nolen, peas 21 &231 / ( I I \ 1 R
rano-
-
O E+
I� 2
m
Cid I z E °j
i
\ I
NI / METAL
/ =^,C3 AWNING
LL / / Loi + — I M7� Dr AS
a
! / X VELI EV riLN \ I I
Im3-m^ rrss2.o^) / I Z pi
�i 1ENlRY ELEVAr10N / I
/ / _ lo3•-m" ns3r-o•) _ LODGE N
ENTn E (P o
.. _. .
EXISTING \ —� - —_ - ❑
COTTONWOOD -
I TREE$9, 41mw
y
/ vM5
D.4
DS ) /`r-
ING r
f i RETAINING yyALL (TO BE
DEMOLISH
LINE OFIX
1 � rlvi•-ma � -�€ve� wr
Found Reber & Cap E
Marked LS 9184 — — �` ;\ SET7K LINE \ \ I
N67"2t4"E for 0.56from record ^ m E� - INS v m
f
_114 6
talo �PU. IERTY LINE `•
MUNIN3 / I• I\ \
E I, WALL mit L __.. s
wu
IL
LOCATION ON
LE UE
G G_
HOUSE LODGE_NEW\CHART HOUSE LODGE\SHEETS\CONSTRUC-
19
vl
G
SITE PLAN.DWG t
G
2
OEM
.s- r
I �
� SII
re: CIVIL FOR CURB D
CUT: C4 & C9 =
CAR UFT q V
rloN ENTRY fP F-
I
z J� EXISTING IETAI ING WAU.
UO BE DE MOU ED) - C -
DS
w T
TRASH/ RECYCL NG W
ENTRY
re: CIVIL FOR
v I CURB CUT:
&C9— - - D.8
05
Found 3ebar $Cap 4�
-r ---.,a,•k S 16129 E
I
1
\iov ;
m
BI-DIRECTIONAL CROSSWALK RAMPS
PER ANSI Al 17.112003 HE; CIVIL
ull ua— sS
rt ss ss
ss —__ asS 1 TE FLAN SCALE 1/8'= V-0'
fYL
w �r .IV //� 1/8 11 s 11-011
100.0 = 7923.7
100.01 = IWV-011 U.6.3Z
6
O4
'BRYAN
PARTNERSHIP, INC.
ARCHITECTS - A.I.A.
ARCHITECTURE
PLANNING
INTERIORS
P. O. Box 2773
620 Main Street, Suite 8
Frisco, CO 80443
Tel: 970.668.1133
Fax: 970.668.2316
W vW.oparCh.corn
1'6 5=e
�
i MarkedbLS 9184 -
I
N74`4 11 WE for 0.73' from record
I�
i
gy
M0
5
0.44' Deck Setback
J
from Property Line
NOTES ` IREV
1. ARCHITECTURAL SITE PLAN BASED ON
INFORMATION FROM EXISTING CONDITIONS
SURVEY PREPARED BY ASPEN SURVEY j
ENGINEERS DATED 11/17/03. REFER TO
DRAWING SHEET NUMBER S 01. A.
2, REFER TO CIVIL DRAWINGS: C C2 AND C3 FOR EE
SITE UTILITY PLAN SEWER PLAN, bRAINAGE Ano
AND EROSION CONTROL PLAIj AND MISC. SITE BE
DETAILS.
3. REFER TO LANDSCAPE SITE PLAN: L1.1 a -
I
Lot 5 a
w
Lz
z
•-
IiSTAIREXIT AWNINGCap
K LINE
E
I -BI-DIRECTIONAL CROSSWALK ADA RAMPS
Sign Location
Revocable Encroachment
[NCHRec. No. 433366
See Notes, Item 18NALCROSSWALK RAMPS
17.1/2003 RE: CML
fSfING FOUNDATION TO
E AINWHERESHOWN
DRAIL
A TAIR
3 AIR
A2
i- / / YI•- rrse•- ) \ -- ENTR URANT
- LU - AS
I RES
/ 1 vAncN I 1 Sralawr DCI HIND E P R ADJACENT
PATIO / •-m^ rrsn'-®^) I' -m^ rs3m'-®•) -
�DEWALK
P. NOPY-TO-EXTEND
RAO embecia - — _� = BEYO ROPERTY
nss. N�. slerso&szoael / ) G E
See Nolen, peas 21 &231 / ( I I \ 1 R
rano-
-
O E+
I� 2
m
Cid I z E °j
i
\ I
NI / METAL
/ =^,C3 AWNING
LL / / Loi + — I M7� Dr AS
a
! / X VELI EV riLN \ I I
Im3-m^ rrss2.o^) / I Z pi
�i 1ENlRY ELEVAr10N / I
/ / _ lo3•-m" ns3r-o•) _ LODGE N
ENTn E (P o
.. _. .
EXISTING \ —� - —_ - ❑
COTTONWOOD -
I TREE$9, 41mw
y
/ vM5
D.4
DS ) /`r-
ING r
f i RETAINING yyALL (TO BE
DEMOLISH
LINE OFIX
1 � rlvi•-ma � -�€ve� wr
Found Reber & Cap E
Marked LS 9184 — — �` ;\ SET7K LINE \ \ I
N67"2t4"E for 0.56from record ^ m E� - INS v m
f
_114 6
talo �PU. IERTY LINE `•
MUNIN3 / I• I\ \
E I, WALL mit L __.. s
wu
IL
LOCATION ON
LE UE
G G_
HOUSE LODGE_NEW\CHART HOUSE LODGE\SHEETS\CONSTRUC-
19
vl
G
SITE PLAN.DWG t
G
2
OEM
.s- r
I �
� SII
re: CIVIL FOR CURB D
CUT: C4 & C9 =
CAR UFT q V
rloN ENTRY fP F-
I
z J� EXISTING IETAI ING WAU.
UO BE DE MOU ED) - C -
DS
w T
TRASH/ RECYCL NG W
ENTRY
re: CIVIL FOR
v I CURB CUT:
&C9— - - D.8
05
Found 3ebar $Cap 4�
-r ---.,a,•k S 16129 E
I
1
\iov ;
m
BI-DIRECTIONAL CROSSWALK RAMPS
PER ANSI Al 17.112003 HE; CIVIL
ull ua— sS
rt ss ss
ss —__ asS 1 TE FLAN SCALE 1/8'= V-0'
fYL
w �r .IV //� 1/8 11 s 11-011
100.0 = 7923.7
100.01 = IWV-011 U.6.3Z
6
O4
'BRYAN
PARTNERSHIP, INC.
ARCHITECTS - A.I.A.
ARCHITECTURE
PLANNING
INTERIORS
P. O. Box 2773
620 Main Street, Suite 8
Frisco, CO 80443
Tel: 970.668.1133
Fax: 970.668.2316
W vW.oparCh.corn
5-21-14 PEIRMIT SET
6-20-14 PRICING SET
9-29-14 PROGRESS SET
II -19-14 PROGRESS SET
12-4-14 ZONING REVIEW
2-12-14 CONSTRUCTION SE
12-30-14 ZONING REVIEW
1-21-15 BUILDING DEPT.
COMMENTS
I-21-15 PERMIT COMMENTS
2-13-15PERI"IIT COMMENTS
2-23-15RECTCLING ROOM
FLOOR
f'ER"11T/ OWNER
g_ _15 UPDATES
� vvc,r aaG v� i�w,
P
,PIAS �
Date: 12,12.14
Project No: 2453.W
Drawn by: ATB
Checked by: KNR
A2.0
SITE PLAN
V
N
Q
r
00
J
~
0
Z)
50
O
J
L0
r
O
Z
cV
V
5-21-14 PEIRMIT SET
6-20-14 PRICING SET
9-29-14 PROGRESS SET
II -19-14 PROGRESS SET
12-4-14 ZONING REVIEW
2-12-14 CONSTRUCTION SE
12-30-14 ZONING REVIEW
1-21-15 BUILDING DEPT.
COMMENTS
I-21-15 PERMIT COMMENTS
2-13-15PERI"IIT COMMENTS
2-23-15RECTCLING ROOM
FLOOR
f'ER"11T/ OWNER
g_ _15 UPDATES
� vvc,r aaG v� i�w,
P
,PIAS �
Date: 12,12.14
Project No: 2453.W
Drawn by: ATB
Checked by: KNR
A2.0
SITE PLAN
Gity of Aspen
Gornstruction Noise Suppression Plan
As the General Contractor for this construction project, t //an f4//1"U hereby agree
to the following restrictions and will provide the necessary noise supprelssion (outlined below),
such that it will lesson thp impact to the properties within 300 feet of the project located at
2 / ? t7 /Vf4^/1 1 /- | understand that if any construction activities exceed
B0 decibels and are not crrvered by this document I will contact the City of Aspen Environmental
on-site contact Phone # ?79 -O 7Y O
Many activities on construction sites are noisy. Although some noise may be unavoidable, it can
often Oe controlled using improved work practices. Builders should make all reasonable efforts
to minimize noise. Noise Suppression plans are required for all construction projects where
activitiers will generate noise that exceeds 80 decibels. Secfion 18.04'(150(A)(2)(d)
Hours of oPeration
All construction activity is limited to the following days and times:
Monday thru Friday SaturdaY
7:30 am to 5:30 pm 9:00 am to 5:00 Pm
Constructions activities producing noise greater than 80 decibels are limited to the following
days and times:
lAonday thru FridaY
9:00 am to 5:00 pm
Work that is over BO declbels which by law requires a noise suppression plan will not be allowej
for Saturdav work that includes but not limited to the use of compressors, generators,
Ja.khrmm"rs.oower equipment, nail guns, drilling machinery, earth moving equiprnent and
similar loud construction activities. This does not re-strict quiet work inside and outside that doeg
not require a power source, includinq a batterv, on Saturdav.
construction activity is not allowed during allfederal holidays.
Due to the congestion in Aspen when town is completely full, noise suppression plans will not
be approveO toi tfre following dates: Ghristmas Week (December 25 through Jan. 1), Food
and Wine Week in June (Friday thru Sunday), 4*n of July day and/or weekend if it falls on
a Friday or Monday, and Labor Day weekend'
Sunday
No construction work is attowed
Revised 0110912013
City of Aspen Temporary Revocable Encroachment License
130 South Galena Sitreet, Aspery Colorado 81611
Phone (970) 920-5080 Fax (970) 920-8440 PERMIT NO.
5l
J'pL,uu llve
A27 Batth Dr Asnr* /0 Vt/
ey''?'iT'H'iilr 1". Dr kp r*, t'o tlbl l
ffioumpster Srane flTrailer $ther (Describe) :
f]sidewalk $ttey
"i[" Ef ]flE"'SrS?Ia, y * ry1o olclru.pf.l',o + 4.r,,69, cdLtlth, Zud a//
ofk/ ltr,Aioa ,r^o/tr,',r/s rtc, lar7r ft o/,
Land Lease Sq Ft:
lszcs 5qt " nu &'L tt -s- h*rs fur z-1 hourz
Prl'ry /o{,'rS" IiJi'l' i,,.,u L *t,tr*it
subordlnate ro rhe rlghr of Clry of Aspen to use satd area for any publlc purposes
agreed that this lnsurance policy may not be canceled by the surety until thlrty (30) days after receipt by the city, by reglstered mail, of a written notice of such
false or fraudulernt. T Aspen for loss or damage to the lmprovements constructed wlthln the encroachment area.
property shall be restored to a condltlon satisfactory to The Clty of Aspen.
and repalr of the publlc rlght of way, together wlth lmprovements constructed thereln, whlch The clty of Aspen, I n tlre exerclse of Its dlscreilon, shalj
samelnasafeandcleancondltlon. LJndertheseclrcumstances,theLlcenseeshallrestoretherlght-of-wayundertheencroachmenttoltsorlgldalorbetter
bllc rlght ofway. fo A f,llcLJt
For Office Use Only;
In Core Land Lease Sq f:t
Days of Land Lease In C:ore
Core Land Lease Sq Ft
of Land Lease Outside Core
Core Parking Spaces
of Outside Core Parking Spaces
THE Cmy or Asprnr
The City of Aspen Engineering Departme:nt
130 S. Galena Street
Aspen, Colorado 81611
(e70) e20-s080
This affidavit must be completed and on file with the City of Aspen Engineerring Department before any
l, A/an Tlrbrynereby swear or affirm that I will cary employee and public liability insurance witl:r
minimum limits of not less than $150;000 per person and $600,000 per occurrence, or as specified by Section
24-10-114, C.R.S, and property damage insurance with a minimum limit of not less than $150,000 for any
single occunence at the time I perfbrm any construction activities in the City of Aspen. The City of Aspen
shall be named as co-insured on the policy. I also agree to produce proof of such insurance whenever the Cify
City of Aspen - Engineering Department
AFFIDAVIT OF' INSURANCE COVERAGE
Encroachment permit will be issued.
Company Name (please print)
Street Address
/b
ve I understand and asree with the fore mentioned statement.
a 970-920-5080 REVISED: 1/14/2009