March 7, 2017
Kevin Michelson
City of Aspen Building Department
Dancing Bear Penthouse
130.2016.ARBK (Revision) Response Narrative
Original submitted plans were dated 12.12.2016. These plans were modified, and dated 02.23.2012, in
response to various comments from the zoning department, ICC A117.1-2003 requirements, and IECC
energy code requirements. Further comments were received in response to the 02.23.2017 set, and
modifications in response to those comments are described below:
• 1-Cover –The sheet index was revised to include Sheet 501 – Construction Assemblies/Interior Elevations.
• Sheet 103e – No changes.
• Sheet 103 – The washer dryer units have been modified to a stackable version centered in the middle of the laundry
room to provide proper clearance for a parallel approach centered on the appliance
• Sheet A-105 – No changes.
• Sheet A-501 – Modifications as described below:
o Floor/Ceiling Assemblies – Floor/Ceiling Assemblies were added to demonstrate a minimum amount of concrete
of 6”. The wood floors are to be installed with the Sika Accubond system, and the tile conditions will be
installed with a Pliteq GenieMat RST-05. The floor/ceiling assemblies will achieve an STC and IIC rating of 50 or
better. A specification for the Sika and Pliteq products showing STC and IIC results are included. In addition, an
acoustic performance test result is included for the Pliteq product.
o Interior elevation (Bathroom 4) – The elevation was added to describe the counter height at 2’-10” above the
finished floor with removable cabinetry below per exception 2 in ANSI 1004.11.3.1.1.
• Fireplace Registration Form – The fireplace registration form was modified to correspond with the Davinci Right
Corner 78” x 20” specified on the plans. The appropriate specification is now included in the PDF with the Fireplace
Registration Form.
Please contact our office with any questions.