HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0130.2016 (10).ARBK
3
August 3, 2017
Kevin Michelson
City of Aspen Building Department
Dancing Bear Penthouse
130.2016.ARBK Change Order Narrative
Approved permit plans were dated 03.07.2017. These plans were modified as described below:
• Sheet 103 – Rooftop amenities were added to the exterior patio.
o Stainless Steel Hot Tub (8’x8’) – North side of patio. Custom stainless-steel spa constructed by
Bradford Spas based upon the Carolina model. Carolina specification has been included. The
exterior glass rail is already raised adjacent to proposed hot tub.
o Stainless Steel Hot Tub (7’x3’) – South side of patio. Custom stainless-steel spa constructed by
Bradford Spas based upon the Southport model. Southport specification has been included.
The exterior parapet and glass rail shall be raised to match the already raised parapet adjacent
to the proposed hot tub. (The location adjacent to the stair wall is not possible due to an
electrical disconnect on the west wall of the stair.)
o Outdoor Fire Pit – North east side of patio. Prefab gas log set to be installed per
manufacturer.
o Outdoor Fire Pit – South east side of patio. Prefab gas log set to be installed per
manufacturer.
o Outdoor Kitchen Counter Space & Cabinetry – South side of patio.
• REMP – A REMP sheet has been included for the custom stainless-steel spas.
Please contact our office with any questions.
Respectfully,
Kevin Michelson
No.
DATE
BY
TO
PROJECT
SUBJECT
COMMENTS
06/27/2018