Loading...
HomeMy WebLinkAboutFile Documents.200 E Durant Ave.0029.2017 (3).ARBUdoug@dtconstruction.net Price By Unit Type Unit Qty Unit Cost Item Total Percent 1.001 Mobilization/Demobilization DTC Job 2 1,000 2,000 1.100 Site Supervision DTC month 6 8,000 48,000 1.150 Project Management DTC month 6 4,000 24,000 1.180 Job Truck DTC month 6 200 1,200 1.310 Site Maintenance DTC month 4 4,000 16,000 1.410 Tools & Machinery historic month 6 200 1,200 1.420 Construction Aids historic allowance 1 5,500 5,500 1.500 Temporary Utilities (By Owner)historic month 0 350 0 1.550 Construction Facilities Colorado Site month 6 350 2,100 1.600 Winter Conditions DTC allowance 3 1,000 3,000 1.700 Construction Waste Removal Colorado Site dumpsters 15 800 12,000 1.750 Construction Clean historic square foot 4,000 2.25 9,000 1.800 Testing/Samples/Mock-ups historic allowance 1 1,500 1,500 1.900 Misc. Job Site Overhead historic month 6 250 1,500 127,000 11.5% Price By Unit Type Unit Qty Unit Cost Item Total Percent 2.220 Demolition DTC allowance 1 15,000 15,000 2.225 Protection DTC allowance 1 2,500 2,500 2.500 Concrete demolition/slab prep DTC allowance 1 3,500 3,500 21,000 1.9% Price By Unit Type Unit Qty Unit Cost Item Total Percent 3.051 Concrete Labor DTC allowance 1 500 500 3.300 Concrete Slabs (terrace) Heath allowance 70 12 840 1,340 0.1% Price By Unit Type Unit Qty Unit Cost Item Total Percent 4.100 Masonry repair (ext brick)DTC allowance 0 3,500 0 0 0.0% Price By Unit Type Unit Qty Unit Cost Item Total Percent 5.100 Structural Steel Sopris Steel allowance 1 31,000 31,000 5.500 Architectural Steel Sopris Steel allowance 1 32,735 32,735 Division 02 Site Work Division 03 Concrete Division 04 Masonry Division 05 Metals Tel: 970-920-1719 Division 01 General Requirements Nazarian Residence Doug Throm Construction, Inc. 617 West Main Street Aspen, Colorado 81611 November 25, 2016 200 E Durant Unit A Preliminary Construction Budget City of Aspen Received 03/07/17 Building Department 63,735 5.8% Price By Unit Type Unit Qty Unit Cost Item Total Percent 6.060 Framing Materials Pro-Build allowance 1 7,500 7,500 6.061 Framing Labor GP Const allowance 1 27,500 27,500 6.200 Exterior Trim labor GP Const allowance 1 2,500 2,500 6.250 Exterior Trim material Pro-Build allowance 1 1,500 1,500 6.450 Interior Trim Labor Fine Trim allowance 1 25,000 25,000 6.451 Interior Trim Material Sun Mtn allowance 1 12,000 12,000 76,000 6.9% Price By Unit Type Unit Qty Unit Cost Item Total Percent 7.250 Insulation Aspen Insulat allowance 1 21,510 21,510 7.500 Deck Waterproofing (repair)Western Slop allowance 70 15 1,050 7.750 Gutters, heat tape, snow retention Ajax allowance 1 0 0 22,560 2.0% Price By Unit Type Unit Qty Unit Cost Item Total Percent 8.100 Interior Doors Sun Mtn allowance 20 1,000 20,000 8.110 Door Hardware DDH allowance 20 150 3,000 8.500 Windows & Exterior Doors Sierra Pacific allowance 0 5,400 0 8.510 Windows & Doors Labor G.P Const allowance 0 2,000 0 8.830 Mirrors R. F. Glass allowance 1 2,500 2,500 25,500 2.3% Price By Unit Type Unit Qty Unit Cost Item Total Percent 9.200 Drywall Hang, Tape & Texture Kevin Hunter allowance 1 28,000 28,000 9.300 Tile Material Decorative Mat allowance 1,400 20 28,000 9.310 Tile labor & prep Blue Sky allowance 1,400 20 28,000 9.500 Wood Flooring AVH allowance 2,000 20 40,000 9.680 Carpet by others allowance 0 0 0 9.910 Interior Paint R.F. Paintworks allowance 1 30,940 30,940 9.915 Exterior paint R.F. Paintworks allowance 1 2,500 2,500 157,440 14.3% Price By Unit Type Unit Qty Unit Cost Item Total Percent 10.400 Stair railing R. F. Glass allowance 1 22,500 22,500 10.500 Gas fireplaces Ute City allowance 1 28,085 28,085 10.820 Bath Accessories AGI allowance 1 2,000 2,000 10.821 Shower Doors & tub enclosure R. F. Glass allowance 1 11,500 11,500 64,085 5.8% Division 06 Wood Division 07 Thermal & Moisture Protection Division 08 Doors & Windows Division 09 Finishes Division 10 Specialties City of Aspen Received 03/07/17 Building Department Price By Unit Type Unit Qty Unit Cost Item Total Percent 11.450 Appliances Mtn High allowance 1 30,000 30,000 11.451 Appliance Installation Mtn High allowance 1 1,600 1,600 31,600 2.9% Price By Unit Type Unit Qty Unit Cost Item Total Percent 12.300 Cabinets w install Barlow's allowance 1 106,000 106,000 12.321 Cabinet hardware DDH allowance 1 2,500 2,500 12.323 Counter tops Argento allowance 260 125 32,500 141,000 12.8% Price By Unit Type Unit Qty Unit Cost Item Total Percent 13.300 Radon mitigation Radon Enginee allowance 1 2,500 2,500 13.400 Fire Protection Flame Out allowance 1 5,000 5,000 13.750 PV Solar Sunsense allowance 1 0 0 7,500 0.7% Price By Unit Type Unit Qty Unit Cost Item Total Percent 15.400 Plumbing/gas piping Superior allowance 1 26,000 26,000 15.410 Plumbing Fixtures Superior allowance 1 22,000 22,000 15.500 Gas hot water Superior allowance 1 10,000 10,000 15.800 HVAC Western allowance 1 25,000 25,000 15.830 Bath Fans/dryer vent/hood Western allowance 1 5,000 5,000 88,000 8.0% Price By Unit Type Unit Qty Unit Cost Item Total Percent 16.050 Electrical Reeves allowance 1 59,490 59,490 16.051 Lighting Control Reeves allowance 1 5,200 5,200 16.150 Light fixtures Reeves allowance 1 18,590 18,590 16.400 Low Voltage/security Pre-wire & trim Audio Edge allowance 1 10,170 10,170 16.450 A/V Equipment Audio Edge allowance 1 30,400 30,400 123,850 11.2% 5%47,531 4.3% Liability Insurance @ 1.5%14,972 1.4% 89,833 8.1% Total New Residence $1,102,945 100.0% Division 15 Mechanical Division 13 Specialties Contractor's Contingency General Contractor Fee @ 9% Division 16 Electrical Division 12 Furnishings Division 11 Equipment City of Aspen Received 03/07/17 Building Department