Loading...
HomeMy WebLinkAboutFile Documents.200 E Durant Ave.0029.2017 (13).ARBUDoug Throm Construction, Inc 617 W. Main Street Aspen, CO 970 920-1719 HBN Family Trust 200 E. Durant, Unit A Aspen, Co 81611 City of Aspen Construction Management Plan March 1st, 2017 2.0 Project Introduction 2.1 Disturbance Area: None: Interior renovation 2.2 Location: 200 E Durant Ave Aspen, CO 81611 2.3 Description: An interior renovation of an existing 4 bedroom/ 4 bath townhouse, structural changes as required to open up floor plan. Kitchen and baths to be completely redone. No net square footage change. 3.0 Project Documentation 3.1 Permits: A City of Aspen permit has been applied for on March 6tht, 2017 3.2 Public Notification: A project letter will be sent to all neighbors within 300 feet of the project before the start of construction complying with City of Aspen requirements. 3.3 Project Sign A project sign, complying with City of Aspen specifications, will be erected before the start of construction. 3.4 Contact List Owner: HBN Family Trust Contractor: Doug Throm Construction, Inc Supervisor: Mike Mckie Safety Officer: Mike Mckie Traffic Officer: Mike Mckie City of Aspen Received 03/07/17 Building Department Doug Throm Construction, Inc 617 W. Main Street Aspen, CO 970 920-1719 4.0 Project Implementation 4.1 Dates of Construction: August 1 2017- December 15, 2017 4.2 Hours of Construction: Per City of Aspen regulations: Monday – Friday 7:30 am to 5:30 pm Saturday 9:00 am to 5:00 pm 4.3 Construction Schedule: 5.0 Parking Management 5.1 Parking Management Form 5.2 Emergency Vehicle Access and Ordinance 35 Emergency vehicle access will remain open at all times 5.4 Staging Areas See Exhibit “A” CMP site plan 5.5 Construction Trailer, materials storage and Waste Management See Exhibit “A” CMP site plan 6.0 Traffic Control Not Applicable to this permit 6.5 Traffic Control Plan Not Applicable to this permit 8.0 Sediment and Erosion Control Not Applicable to this permit 9.0 Fugitive Dust Control Not Applicable to this permit 10.0 Emissions Not Applicable to this permit 11.0 Noise Suppression 11.1 General Compliance with the 70-decibel noise limit will be insured from June 1st through Labor Day. Compliance of the 80-decibel noise limit will be insured from Labor Day through May 31st. 11.2 Noise Suppression Plan Exhibit”C” is the signed copy of the City of Aspen Construction Noise Suppression Plan. 11.3 Requirements for Activities Exceeding 80 Decibels All applicable rules & regulations will be complied with. Written notification to surrounding neighbors within 300 feet of the project will be distributed as necessary. City of Aspen Received 03/07/17 Building Department