Loading...
HomeMy WebLinkAboutFile Documents.200 E Durant Ave.0029.2017 (14).ARBUDATE Date: Scale: Drawn by: REVISIONS Z4A WWW.ZONE4ARCHITECTS.COM permit 3.06.17 Z:\Shared\Data\_Z4 Projects\1609 200 Durant\Model\200 Durant 2.28.17 COA.plnBY CRD28 3/1/2017Plotted On: 3/1/2017 AS NOTED Construction Management Plan200 E Durant Unit A ZONE 4 ARCHITECTS IS NOT LIABLE OR RESPONSIBLE AT ANY TIME FOR ANY CHANGES TO THESE DRAWINGS OR SPECIFICATIONS WITHOUT PRIOR WRITTEN AUTHORIZATION.c 2017 ZONE 4 ARCHITECTS, LLC. THE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT IS THE PROPERTY OF ZONE 4 ARCHITECTS LLC. NO PART OF THIS INFORMATION MAY BE USED OR COPIED WITHOUT THE PRIOR WRITTEN PERMISSION OF ZONE 4 ARCHITECTS LLC. ZONE 4 ARCHITECTS LLC. SHALL RETAIN ALL COMMON LAW STATUTORY AND ALL OTHER RESERVED RIGHTS, INCLUDING COPYRIGHT THERETO. ALL RIGHTS RESERVED200 E Durant Unit AAspen CO 81611USAEAST DURANT AVENUESOUTH ASPEN STREET ALLEY3 3 2 2 1 1 A A E E B B D D C C UNIT B UNIT B SCALE: 1/4" = 1'-0"1 Construction Management Plan N TOILET DUMPSTER MATERIAL STORAGE City of Aspen Received 03/07/17 Building Department