HomeMy WebLinkAboutFile Documents.200 E Durant Ave.0029.2017 (14).ARBUDATE
Date:
Scale:
Drawn by:
REVISIONS
Z4A
WWW.ZONE4ARCHITECTS.COM
permit 3.06.17
Z:\Shared\Data\_Z4 Projects\1609 200 Durant\Model\200 Durant 2.28.17 COA.plnBY
CRD28
3/1/2017Plotted On:
3/1/2017
AS NOTED
Construction
Management
Plan200 E Durant Unit A ZONE 4 ARCHITECTS IS NOT LIABLE OR RESPONSIBLE AT ANY TIME FOR ANY CHANGES TO THESE DRAWINGS OR SPECIFICATIONS WITHOUT PRIOR WRITTEN AUTHORIZATION.c 2017 ZONE 4 ARCHITECTS, LLC. THE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT IS THE PROPERTY OF ZONE 4 ARCHITECTS LLC. NO PART OF THIS INFORMATION MAY BE USED OR COPIED WITHOUT THE PRIOR WRITTEN PERMISSION OF ZONE 4 ARCHITECTS LLC. ZONE 4 ARCHITECTS LLC. SHALL RETAIN ALL COMMON LAW STATUTORY AND ALL OTHER RESERVED RIGHTS, INCLUDING COPYRIGHT THERETO. ALL RIGHTS RESERVED200 E Durant Unit AAspen CO 81611USAEAST DURANT AVENUESOUTH ASPEN STREET
ALLEY3 3
2 2
1 1
A
A
E
E
B
B
D
D
C
C
UNIT B UNIT B
SCALE: 1/4" = 1'-0"1 Construction Management Plan N
TOILET
DUMPSTER
MATERIAL
STORAGE
City of Aspen
Received
03/07/17
Building Department