HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0071.2018 (28).ACBK Construction Manager/General Contractor FCI Constructors, Inc. 3070 I-70B, Building A (81504) (970) 434-9093 (970) 434-7583 Fax P.O. Box 1767 Grand Junction, CO 81502 PITKIN COUNTY—ASPEN AMBULANCE DISTRICT FACILITY CONSTRUCTION MANAGEMENT PLAN Version 2.0 - 6.8.18 SUBMITTED TO: CITY OF ASPEN ENGINEERING DEPARTMENT 130 SOUTH GALENA ST. ASPEN, CO 81611 06/08/2018 TABLE OF CONTENTS 3 ...................................................................................................... PROJECT INTRODUCTION 5 ............................................................................................................... PROJECT LOCATION 7 .............................. PROJECT DOCUMENTATION (PERMITS, PROJECT SIGN, CONTACTS) 10................................................................................................. PROJECT IMPLEMENTATION 12.......................................................................................... SITE MANAGEMENT (SITE PLAN) 21................................................................................................................ TRAFFIC CONTROL 26......................................................................................... SEDIMENT & EROSION CONTROL 33..................................................................................................... FUGITIVE DUST CONTROL 34.............................................................................................................................. EMISSIONS 35............................................................................................................ NOISE SUPPRESSION 06/08/2018 PROJECT INTRODUCTION FCI Constructors, Inc. will be the general contractor for the Pitkin County – Aspen Ambulance District Facility project. This project involves the construction of a new ambulance facility located on Parcel A, Lot 1 of the Aspen Valley Hospital Subdivision in Aspen Colorado. The building is approximately 12,500 gsf on two floors, oriented towards the north where it directly accesses the Hospital Loop Road. This project is being completed for Pitkin County (owner) to provide a new updated ambulance facility for emergency medical services. Total project disturbance area is estimated at 81,236 sf (1.86 acres). Please reference the attached area of Disturbance Overview. The first phase of construction including the parking lot and utility relocates for this project is anticipated to start July 2018 and finish September 2018. Phase two of the project (construction of building structurer) is anticipated to start in October of 2018 and finish in August of 2019. 06/08/2018 12.7'X26"IVIVWVWVWVWVWVWVWVWVWVIVIVIVIVIVIVHYD SSSSDYH WVCCTWVWVWVHOSPITAL LOOP ROADCASTLE CREEK ROADDOOLITTLE DRIVEcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactcompactDRAWN BY:CHECKED BY:SHEET NO:PROJECT NO:DATE:592 HIGHWAY 133Carbondale, Colorado 81623PH 970.340.4130C 2016 CHAMBERLIN ARCHITECTS NO:ISSUED FOR:DATE:F 866.876.5873P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Utilities.dwg 4/4/2018 9:21 AM CHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comE N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G NASPENAMBULANCEDISTRICT FACILITYCASTLE CREEK RDASPEN, COLORADOUTILITY LAYOUTPROJECT STATUS: 75% CDSWWRBGC-1162017-4404/03/18                        81,236 sf1.86 AcresTotal Disturbance Area06/08/2018 PROJECT LOCATION The project is located at 405 Castle Creek Road Aspen, CO 81611 on the campus of the Aspen Valley hospital, legally described as: Lot 1, Parcel A. The new building will be oriented towards the north where it directly accesses the Hospital Loop Road. The new ambulance building will be constructed to the north of the Pitkin Country Health and Human Services building and just to the south of the existing Hospital Loop Road. Project Location & Vicinity Map Project extents/location/directional arrow/adjacent street names. SEE ATTACHED “PROJECT LOCATION & VICINITY MAP” Project Description Background information/development type/effect on public utilities (storm sewer/sanitary sewer/water/etc.) The following utility work is planned to be completed as part of this project: - Relocation of electrical utilities currently routed though parking lot where new building will be constructed. - Relocation of gas utilities currently routed though parking lot where new building will be constructed. - New sanitary sewer service to new ambulance building and existing Health and Human Services building. Note that this new sewer line connects to the sewer main at Castle Creek Rd. - Rework of storm drainage utilities to accommodate new building and parking lot. - Relocation / rerouting of cable TV, phone, and fiber to accommodate new building and parking lot rework. 06/08/2018 12.7' X 2 6 " IV IV WV WV WV WV WV WV WV WV WV IV IV IV IV IV IV HYD S S S S S S S S C CT WV WV WV compact compact compact compact compact compact compact compact compact compact compact compact compactcompactcompact DO0LITTLE DRIVEHHS BUILDING APPROX. MAIN LEVEL FFE = 8019.0' APPROX. SECOND LVEL FFE. = 8030.0' HOSPITAL LOOP ROAD CASTLE CREEK ROADASPEN AMBULANCE DISTRICT FACILITY MAIN LEVEL FFE = 8016.00' SECOND LEVEL FFE = 8032.00' DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Overall.dwg4/4/2018 9:20 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO OVERALL SITE PLAN PROJECT STATUS: 75% CD SWW RBG C-1022017-44 04/03/18 New Aspen Ambulance Building PROJECT LOCATION & VICINITY MAP 06/08/2018 PROJECT DOCUMENTATION Permits List applicable permits (describe & copy as an appendix) -Building Permits: Demo/Plumbing/Electrical/Mechanical ***Permits have not been issued to date. Once issued, permits will be incorporated into this Construction Management Plan as required*** Public Notification Project Representative: Brian Young – Project Superintendent: Phone 970-433-1598 (Cell) Brady Blackmer – Project Manager: 970-433-1600 (Cell) Preconstruction Meeting Date & Time: TBD – Construction start date anticipated to be July 2018. Preconstruction meeting to be set-up at least 2 weeks prior to this start date. Project Sign See attached example. Sign will be made per the City Standards See attached LOGISTICS MAP for location Contact Designation In Case of Emergency Call 911 Owner/Owner’s Rep: Pitkin County Rich Englehart 970-618-7232 Contractor: FCI Constructors, Inc. 3070 I-70 B, Bldg. A Grand Junction, CO 81504 Office: 970-434-9093 Project Superintendent Brian Young: Phone 970-433-1598 / byoung@fciol.com Project Manager Brady Blackmer: O: 970-434-9093, C: 970-433-1600 / bblackmer@fciol.com State Certified Safety Officer Michael Saks: O: 970-434-9093, C: 303-881-9802 / msaks@fciol.com State Certified Erosion Control Officer Michael Saks: O: 970-434-9093, C: 303-881-9802 / msaks@fciol.com Pitkin County Administration 970-920-5200 Building Maintenance & Project Management 970-920-5377 06/08/2018 City of Aspen Administration 970-920-5212 Engineering Department 970-920-5080 Fire Department 970-925-5532 Police Department 970-920-5400 Sheriff’s Department 970-920-5300 Roaring Fork Transit Authority 970-920-1905 Utilities Electric: 970-920-5148 Water: 970-920-5110 Sewer: 970-920-5070 Gas: 800-563-0012 Aspen Valley Hospital 970-925-1120 Aspen School District 970-925-3760 06/08/2018 PITKIN COUNTY ASPEN AMBULANCE DISTRICT FACILITY BUILDING PERMIT: #TBD IN CASE OF EMERGENCY CALL 911 FCI Constructors, Inc. 24 Hour Contact Brian Young – General Superintendent Cell: 970-433-1598 FCI Main Office: 970-434-9093 06/08/2018 PROJECT IMPLEMENTATION Construction Dates See attached Aspen Ambulance District Facility Construction Hours Construction will take place Monday thru Friday from 7:30AM to 5:30PM and Saturdays as needed from 9AM-5PM (no work to be performed on Sundays) Any activity generating noise greater than 70db will take place between the hours of 9AM and 5PM Monday thru Friday only. Observed Holidays (no work to be performed) Memorial Day and Memorial Day weekend 4th of July day and/or weekend if it falls on a Friday or Monday Labor Day and Labor Day weekend Thanksgiving Day Christmas Day New Year’s Day Due to this project lying outside the Central Resort Area and outside the Commercial Core: Work restrictions for President’s Day, Christmas Week, Holiday Season (days leading up to Christmas until New Year’s Day), and the Food and Wine Festival are not applicable. Sequence (Phasing) of Construction See attached Pitkin County –Aspen Ambulance District Facility Project Schedule . Adjoining Property Owners Agreement between Pitkin County and the City of Aspen not required. Project Fencing See attached Project Logistics Plan that shows location and extent of project fencing. Natural Environment Several existing trees are to be removed as part of this project. Those trees are denoted in the attached Tree Removal/Protection Plan. Trees that remain and are in the areas of construction will be protected as required. 06/08/2018 Tree Removal/Protection Plan06/08/2018 SITE MANAGEMENT Parking Management Construction workers will be encouraged to carpool to the project site as much as possible. Emergency Vehicle Access & Ordinance 35 Continuous emergency vehicle access will be maintained to the project site. Staging Areas Specify construction staging areas See attached Project Site Logistics Plan for locations of laydown and staging areas. Number of truckloads expected to/from site The number of trucks entering/leaving the site will depend on the activities taking place. During earth retention, excavation, utility relocates, and concrete foundations it is anticipated that trucks will be continually accessing the project site. After these activities are completed, it is anticipated that truck traffic will be reduced to primarily dumpster pulls and material deliveries. An offsite laydown area is anticipated to be utilized for this project. Construction Trailer, Materials Storage, & Waste Management See the attached Project Site Logistics Plan for planned material storage, restroom locations, waste management locations. 06/08/2018 OVERALL SITE LOGISTICS PLAN OVERFLOW CONTRACTOR PARKING AT ASPEN CHAPEL LOWER LOT. AREA O F C O N S T R U C T I O N S E E DETAI L S P H A S E 1 & P H A S E 2 SITE L O G I S T I C S P L A N . Legend SOUND FENCE RELOCATED JOB TRAILER 06/08/2018 I believe Pitkin County owns the lower lot at the Aspen Chapel. Please verify and provide a note from the County stating that construction parking there is allowed. TEMPORARY RFTA BUS REROUTING APPROX. JULY 25, 2018 - OCTOBER 8, 2018 LEGEND ORIGINAL ROUTE TEMPORARY ROUTE TEMPORARY BUS STOP CLOSED BUS STOP TEMPORARY BUS STOP 06/08/2018 12.7' X 2 6 " IV IV WV WV WV WV WV WV WV WV WV IV IV IV IV IV IV HYD S S S S S S S S C CT WV WV WV compact compact compact compact compact compact compact compact compact compact compact compact compactcompactcompact DO0LITTLE DRIVEHHS BUILDING APPROX. MAIN LEVEL FFE = 8019.0' APPROX. SECOND LVEL FFE. = 8030.0' HOSPITAL LOOP ROAD CASTLE CREEK ROADASPEN AMBULANCE DISTRICT FACILITY MAIN LEVEL FFE = 8016.00' SECOND LEVEL FFE = 8032.00' DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Overall.dwg4/4/2018 9:20 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO OVERALL SITE PLAN PROJECT STATUS: 75% CD SWW RBG C-1022017-44 04/03/18 Site Logistics Plan Phase 1 Legend CONSTRUCTION FENCING SOUND FENCE TEMP TOILETS JOB TRAILERS ENTRANCE GATES TRACKING PADS CONSTRUCTION DUMPSTERS MATERIAL LAYDOWN AREAS PROJECT SIGNS EXISTING CROSSWALKS PEDESTIRIAN ACCESS CONSTRUCTION ROAD JOB CONEX S C S C Temporary parking for Health and Human Services in the hospital Parking lot. MAINTAIN HALF OF THE LOOP ROAD FOR EMERGENCY ACCESS REF. SEPERATE PLAN FOP RFTA BUS REROUTE PLANNING 06/08/2018 During soil nailing and micro piling operations, a minimum 12' tall sound fence must be up around the W and S sides of this area. Please provide a note from AVH stating that they are ok with no sound fence blocking their side of work. This area is critical to traffic flow. Make sure not to fully block this area and minimize any disruptions. 12.7' X 2 6 " IV IV WV WV WV WV WV WV WV WV WV IV IV IV IV IV IV HYD S S S S S S S S C CT WV WV WV compact compact compact compact compact compact compact compact compact compact compact compact compactcompactcompact DO0LITTLE DRIVEHHS BUILDING APPROX. MAIN LEVEL FFE = 8019.0' APPROX. SECOND LVEL FFE. = 8030.0' HOSPITAL LOOP ROAD CASTLE CREEK ROADASPEN AMBULANCE DISTRICT FACILITY MAIN LEVEL FFE = 8016.00' SECOND LEVEL FFE = 8032.00' DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Overall.dwg4/4/2018 9:20 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO OVERALL SITE PLAN PROJECT STATUS: 75% CD SWW RBG C-1022017-44 04/03/18 Site Logistics Plan Phase 2 S S S S C CT Legend CONSTRUCTION FENCING SOUND FENCE TEMP TOILETS JOB TRAILERS ENTRANCE GATES TRACKING PADS CONSTRUCTION DUMPSTERS MATERIAL LAYDOWN AREAS PROJECT SIGNS EXISTING CROSSWALKS PEDESTIRIAN ACCESS CONSTRUCTION ROAD JOB CONEX S C CONTRACTOR PARKING CONTRACTOR PARKING 06/08/2018 Activity IDActivity NameOriginalDurationStartFinishAspen Ambulance District FacilityAspen Ambulance District Facility33319-Apr-1806-Aug-19PreconstructionPreconstruction13819-Apr-1801-Nov-18Design, Estimating, PermittingDesign, Estimating, Permitting10019-Apr-1810-Sep-18A1000Construction documents1519-Apr-1809-May-18A1050Develop contract & final execution2519-Apr-1823-May-18A1010GMP estimate2110-May-1808-Jun-18A1020City of Aspen - Permitting (Phase 1)4017-May-1813-Jul-18A1030City of Aspen - Permitting (Phase 2)8017-May-1810-Sep-18A1040GMP review, VE process & NTP1011-Jun-1822-Jun-18Submittals, Long Lead, Buy-OutSubmittals, Long Lead, Buy-Out10211-Jun-1801-Nov-18A1120Precast structures - submittal prep (EARLY PROCURE)511-Jun-1815-Jun-18A1390Parking lot lighting - submittal prep (EARLY PROCURE)1011-Jun-1822-Jun-18A1130Precast structures - submittal review (EARLY PROCURE)1518-Jun-1809-Jul-18A1100Issue subcontractor letters of intent225-Jun-1826-Jun-18A1400Parking lot lighting - submittal review (EARLY PROCURE)1525-Jun-1816-Jul-18A1110Write subcontracts/project buy-out2027-Jun-1825-Jul-18A1180Structural steel - submittal prep3027-Jun-1808-Aug-18A1210Concrete & rebar - submittal prep1027-Jun-1811-Jul-18A1240Elevator - submittal prep1527-Jun-1818-Jul-18A1270Doors, frames, HW - submittal prep1027-Jun-1811-Jul-18A1300Windows & storefront - submittal prep2027-Jun-1825-Jul-18A1330Mechanical equipment - submittal prep1527-Jun-1818-Jul-18A1360Electrical gear - submittal prep1527-Jun-1818-Jul-18A1540Joists & deck - submittal prep3027-Jun-1808-Aug-18A1620Dumpster enclosure - structural steel - submittal prep1027-Jun-1811-Jul-18A1650Dumpster enclosure - masonry - submittal prep1027-Jun-1811-Jul-18A1140Precast structures - fabrication & delivery (EARLY PROCURE)2010-Jul-1806-Aug-18A1220Concrete & rebar - submittal review1512-Jul-1801-Aug-18A1280Doors, frames, HW - submittal review1512-Jul-1801-Aug-18A1630Dumpster enclosure - structural steel - submittal review1512-Jul-1801-Aug-18A1660Dumpster enclosure - masonry - submittal review1512-Jul-1801-Aug-18A1410Parking lot lighting - fab & deliver (EARLY PROCURE)4017-Jul-1811-Sep-18A1250Elevator - submittal review1519-Jul-1808-Aug-18A1340Mechanical equipment - submittal review1519-Jul-1808-Aug-18A1370Electrical gear - submittal review1519-Jul-1808-Aug-18A1310Windows & storefront - submittal review1526-Jul-1815-Aug-18A1230Concrete & rebar - fab & deliver1502-Aug-1822-Aug-18A1290Doors frames - fab & deliver2002-Aug-1829-Aug-18A1640Dumpster enclosure - strucutral steel - fab & deliver1502-Aug-1822-Aug-18A1670Dumpster enclosure - masonry - fab & deliver2002-Aug-1829-Aug-18A1190Structural steel - submittal review1509-Aug-1829-Aug-18A1260Elevator - fab & deliver6009-Aug-1801-Nov-18A1350Mechanical equipment - fab & deliver5009-Aug-1818-Oct-18A1380Electrical gear - fab & deliver5009-Aug-1818-Oct-18A1570Joists & deck - submittal review2009-Aug-1806-Sep-18A1320Windows & storefront - fab & deliver5016-Aug-1825-Oct-18A1610Structual steel - clean-up shop drawings, final detailing1030-Aug-1813-Sep-18A1200Structural steel - fab & deliver2514-Sep-1818-Oct-18AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec20182019Construction documentsDevelop contract & final executionGMP estimateCity of Aspen - Permitting (Phase 1)City of Aspen - Permitting (Phase 2)GMP review, VE process & NTPPrecast structures - submittal prep (EARLY PROCURE)Parking lot lighting - submittal prep (EARLY PROCURE)Precast structures - submittal review (EARLY PROCURE)Issue subcontractor letters of intentParking lot lighting - submittal review (EARLY PROCURE)Write subcontracts/project buy-outStructural steel - submittal prepConcrete & rebar - submittal prepElevator - submittal prepDoors, frames, HW - submittal prepWindows & storefront - submittal prepMechanical equipment - submittal prepElectrical gear - submittal prepJoists & deck - submittal prepDumpster enclosure - structural steel - submittal prepDumpster enclosure - masonry - submittal prepPrecast structures - fabrication & delivery (EARLY PROCURE)Concrete & rebar - submittal reviewDoors, frames, HW - submittal reviewDumpster enclosure - structural steel - submittal reviewDumpster enclosure - masonry - submittal reviewParking lot lighting - fab & deliver (EARLY PROCURE)Elevator - submittal reviewMechanical equipment - submittal reviewElectrical gear - submittal reviewWindows & storefront - submittal reviewConcrete & rebar - fab & deliverDoors frames - fab & deliverDumpster enclosure - strucutral steel - fab & deliverDumpster enclosure - masonry - fab & deliverStructural steel - submittal reviewElevator - fab & deliverMechanical equipment - fab & deliverElectrical gear - fab & deliverJoists & deck - submittal reviewWindows & storefront - fab & deliverStructual steel - clean-up shop drawings, final detailingStructural steel - fab & deliverAspen Ambulance District FacilityFCI Constructors Inc.12-May-18Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish ConstraintMilestone106/08/2018 Activity IDActivity NameOriginalDurationStartFinishA1600Joists & deck - fab & deliver3014-Sep-1825-Oct-18ConstructionConstruction27316-Jul-1806-Aug-19Mobilization & Construction Set-UpMobilization & Construction Set-Up716-Jul-1824-Jul-18A1420Mobilize onsite516-Jul-1820-Jul-18A1430Set-up temp fencing/sound fencing219-Jul-1820-Jul-18A1450Set-up temp sidewalks/temp bus stop319-Jul-1823-Jul-18A1720Set-up erosion control measures219-Jul-1820-Jul-18A1710Pot-hole water line at loop road223-Jul-1824-Jul-18A1440Set-up traffic control124-Jul-1824-Jul-18Parking Lot Re-Build, Utility RelocatesParking Lot Re-Build, Utility Relocates5325-Jul-1808-Oct-18Parking Lot Re-BuildParking Lot Re-Build4825-Jul-1801-Oct-18A1460Close parking lot125-Jul-1825-Jul-18A1470Misc. site demo226-Jul-1827-Jul-18A1480Saw-cut & demo asphalt & site concrete630-Jul-1806-Aug-18A1680Demo existing ret. wall at NE corner230-Jul-1831-Jul-18A1490Rework UG electrical & irrigation807-Aug-1816-Aug-18A2650Telephone utility across Doolittle1007-Aug-1820-Aug-18A1690New storm inlet and connection to existng inlet507-Aug-1813-Aug-18A1530Drill, form, pour light pole bases417-Aug-1822-Aug-18A1520Prep site concrete721-Aug-1829-Aug-18A1550Form & pour site concrete - C&G, v-pan1230-Aug-1817-Sep-18A1590Set light poles512-Sep-1818-Sep-18A1560Prep asphalt paving713-Sep-1821-Sep-18A1700Form & pour new sidewalks1018-Sep-1801-Oct-18A1580Asphalt paving324-Sep-1826-Sep-18A1500Parking signage227-Sep-1828-Sep-18A1510Parking lot striping127-Sep-1827-Sep-18Utility RelocatesUtility Relocates3507-Aug-1825-Sep-18A2610Reroute gas utility (including bypass by Black Hills as needed)2007-Aug-1804-Sep-18A2620Reroute electrical utility2007-Aug-1804-Sep-18A2690Storm water utility at loop road2007-Aug-1804-Sep-18A2120Demo existing ret. wall at loop road221-Aug-1822-Aug-18A2630New sanitary sewer utility2521-Aug-1825-Sep-18A2640Water line tap at loop raod for new building221-Aug-1822-Aug-18A2660Low-volt under loop road421-Aug-1824-Aug-18A2670Connect permanent gas to HHS & remove bypass505-Sep-1811-Sep-18A2680Set transformer, connect permanent power to HHS505-Sep-1811-Sep-18A2710Prep & patch asphalt at loop road505-Sep-1811-Sep-18Trash EnclosureTrash Enclosure3007-Aug-1818-Sep-18A2740Excavate to bottom of structural fill207-Aug-1808-Aug-18A2750Footing excavation109-Aug-1809-Aug-18A2760Form & pour footings310-Aug-1814-Aug-18A2770Form & pour foundation walls315-Aug-1817-Aug-18A2810Structural fill220-Aug-1821-Aug-18A2880Backfill foundation walls120-Aug-1820-Aug-18A2820Slab on grade prep122-Aug-1822-Aug-18A2830Form & pour slab on grade223-Aug-1824-Aug-18A2800Structural CMU430-Aug-1805-Sep-18A2780Electrical rough-in206-Sep-1807-Sep-18A2840Steel erection306-Sep-1810-Sep-18A2790Electrical trim-out110-Sep-1810-Sep-18A2870Roof carpentry & blocking111-Sep-1811-Sep-18AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec20182019Joists & deck - fab & deliverMobilize onsiteSet-up temp fencing/sound fencingSet-up temp sidewalks/temp bus stopSet-up erosion control measuresPot-hole water line at loop roadSet-up traffic controlClose parking lotMisc. site demoSaw-cut & demo asphalt & site concreteDemo existing ret. wall at NE cornerRework UG electrical & irrigationTelephone utility across DoolittleNew storm inlet and connection to existng inletDrill, form, pour light pole basesPrep site concreteForm & pour site concrete - C&G, v-panSet light polesPrep asphalt pavingForm & pour new sidewalksAsphalt pavingParking signageParking lot stripingReroute gas utility (including bypass by Black Hills as needed)Reroute electrical utilityStorm water utility at loop roadDemo existing ret. wall at loop roadNew sanitary sewer utilityWater line tap at loop raod for new buildingLow-volt under loop roadConnect permanent gas to HHS & remove bypassSet transformer, connect permanent power to HHSPrep & patch asphalt at loop roadExcavate to bottom of structural fillFooting excavationForm & pour footingsForm & pour foundation wallsStructural fillBackfill foundation wallsSlab on grade prepForm & pour slab on gradeStructural CMUElectrical rough-inSteel erectionElectrical trim-outRoof carpentry & blockingActual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish ConstraintMilestone206/08/2018 Activity IDActivity NameOriginalDurationStartFinishA2850Roofing, metal flashing, and trim312-Sep-1814-Sep-18A2860Paint exterior metals217-Sep-1818-Sep-18Phase 1 - Close-OutPhase 1 - Close-Out502-Oct-1808-Oct-18A2580Final inspections & sign-offs502-Oct-1808-Oct-18A2700Open parking lot008-Oct-18Building ConstructionBuilding Construction26823-Jul-1806-Aug-19A2280Site demo/clear & grub523-Jul-1827-Jul-18A2590Establish bench for earth retention rig access323-Jul-1825-Jul-18A2570Earth retention at ext. stair1826-Jul-1820-Aug-18A1970Building excavation to bottom of structural fill612-Sep-1819-Sep-18A1980Footing excavation320-Sep-1824-Sep-18A1990Form & pour footings / elevator pit1225-Sep-1810-Oct-18A2000Form & pour cast in place walls2011-Oct-1807-Nov-18A2020Structural fill605-Nov-1812-Nov-18A2090Fluid applied waterproofing & foundation insulation506-Nov-1812-Nov-18A2050Under slab utilities1008-Nov-1821-Nov-18A2460Masonry veneer below grade (west, south elevations)1013-Nov-1828-Nov-18A2080Set trench drains1015-Nov-1830-Nov-18A2070Install perimeter foundation drain529-Nov-1805-Dec-18A2540Slab on grade prep403-Dec-1806-Dec-18A2410Backfill foundation walls706-Dec-1814-Dec-18A2330Form & pour interior slab on grade507-Dec-1813-Dec-18A2560Excavate & prep - site landsacpe walls1007-Dec-1820-Dec-18A2470CMU at north elevation1014-Dec-1828-Dec-18A2500Structural steel erection2014-Dec-1811-Jan-19A2440Form & pour - site landscape walls1021-Dec-1804-Jan-19A2450Backfill site landsacpe walls507-Jan-1911-Jan-19A22902nd level slab on metal deck514-Jan-1918-Jan-19A2480Exterior framing / sheeting2017-Jan-1913-Feb-19A2180Frame interior walls1521-Jan-1908-Feb-19A2730Interior CMU walls1021-Jan-1901-Feb-19A2600Masonry veneer above grade (north, east, south elevations)1504-Feb-1922-Feb-19A2720Roof carpentry512-Feb-1918-Feb-19A2200Roofing2019-Feb-1918-Mar-19A2360Exterior metal panls & trim2025-Feb-1922-Mar-19A2260Ext. window installation1511-Mar-1929-Mar-19A2130MEP wall & ceiling rough in2512-Mar-1915-Apr-19A2430Elevator electrical & plumbing1519-Mar-1908-Apr-19A2240Pavers at balcony519-Mar-1925-Mar-19A2400Site concrete2025-Mar-1919-Apr-19A2160Sand / oil separator installation701-Apr-1909-Apr-19A2530Set condensing units & generator101-Apr-1901-Apr-19A2340Hang, tape & finish drywall2002-Apr-1929-Apr-19A2060Elevator installation3009-Apr-1920-May-19A2210Snowmelt at driveway810-Apr-1919-Apr-19A2250Frame, hang, tape & finish hardlids & soffits1519-Apr-1909-May-19A2300Site handrail installation1022-Apr-1903-May-19A2310Form & pour bay access drive722-Apr-1930-Apr-19A2350Set exterior metal stairs322-Apr-1924-Apr-19A2100Interior paint1524-Apr-1914-May-19A2110Install overhead doors1001-May-1914-May-19A2890Asphalt patch at loop road201-May-1902-May-19AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec20182019Roofing, metal flashing, and trimPaint exterior metalsFinal inspections & sign-offsOpen parking lotSite demo/clear & grubEstablish bench for earth retention rig accessEarth retention at ext. stairBuilding excavation to bottom of structural fillFooting excavationForm & pour footings / elevator pitForm & pour cast in place wallsStructural fillFluid applied waterproofing & foundation insulationUnder slab utilitiesMasonry veneer below grade (west, south elevations)Set trench drainsInstall perimeter foundation drainSlab on grade prepBackfill foundation wallsForm & pour interior slab on gradeExcavate & prep - site landsacpe wallsCMU at north elevationStructural steel erectionForm & pour - site landscape wallsBackfill site landsacpe walls2nd level slab on metal deckExterior framing / sheetingFrame interior wallsInterior CMU wallsMasonry veneer above grade (north, east, south elevations)Roof carpentryRoofingExterior metal panls & trimExt. window installationMEP wall & ceiling rough inElevator electrical & plumbingPavers at balconySite concreteSand / oil separator installationSet condensing units & generatorHang, tape & finish drywallElevator installationSnowmelt at drivewayFrame, hang, tape & finish hardlids & soffitsSite handrail installationForm & pour bay access driveSet exterior metal stairsInterior paintInstall overhead doorsAsphalt patch at loop roadActual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish ConstraintMilestone306/08/2018 Activity IDActivity NameOriginalDurationStartFinishA2270Tile at bathrooms1003-May-1916-May-19A2490Paint exterior metals1006-May-1917-May-19A2030Casework2008-May-1904-Jun-19A2230Install ACT ceilings1008-May-1921-May-19A2320Interior storefront1508-May-1928-May-19A2140MEP trim1515-May-1904-Jun-19A2150Irrigation & plantings2020-May-1914-Jun-19A2420Elevator testing / final inspections521-May-1927-May-19A2040Flooring1522-May-1911-Jun-19A2510Drop ceiling tile305-Jun-1907-Jun-19A2190MEP start-up & commissioning1505-Jun-1925-Jun-19A2550Doors & hardware install707-Jun-1917-Jun-19A2170FCI deficiency list / repairs1012-Jun-1925-Jun-19A2520Accessories & specialties install512-Jun-1918-Jun-19A2220Final clean518-Jun-1924-Jun-19A2380Final inspections & sign offs3026-Jun-1906-Aug-19A2370Substantial completion006-Aug-19AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec20182019Tile at bathroomsPaint exterior metalsCaseworkInstall ACT ceilingsInterior storefrontMEP trimIrrigation & plantingsElevator testing / final inspectionsFlooringDrop ceiling tileMEP start-up & commissioningDoors & hardware installFCI deficiency list / repairsAccessories & specialties installFinal cleanFinal inspections & sign offsSubstantial completionActual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish ConstraintMilestone406/08/2018 TRAFFIC CONTROL Haul Routes Since this project is not within the downtown area, haul routes per Official Heavy Haul Route Map are not required. Trucks will access the project from Castle Creek Rd. and the Hospital Loop Road. On-Site Vehicle Limitations Define all construction related vehicle activities including max vehicle weights & sizes Tandem Dump Truck – 24,000 lbs. empty/54,000 lbs. fully loaded (max legal weight) Hydraulic Crane 110 ton weight capacity – GVW TBD Pickup Trucks ¾ Ton – 5720lbs 1 Ton – 6027lbs 8,000 lb. reach forklift (extend-a-boom) – Operating weight 28,246 lbs. Skid-Steer – 5,800 lbs. 3-ton Delivery truck – TBD Large semi-trucks with trailer will be required to deliver certain materials to the project site. Delivery Requirements The number of deliveries to the site is unknown. Any deliveries will comply with the delivery times as indicated in City Ordinance 24.20 (attached). Note: no vehicles to idle more than 5 minutes. Traffic Control Plan Trucks and vehicles will access the project from the Hospital Loop Road. Specific traffic Control Plans for utility work to be delivered sporadically. 06/08/2018 21 06/08/2018 22 06/08/2018 This regulation is not for construction sites. All deliveries for construction sites area limited to allowable work hours 7:30-5:30 M-F and 9-5 Sat. 23 06/08/2018 24 06/08/2018 SEDIMENT & EROSION CONTROL Drainage and Erosion Control See the attached Erosion Control Plan. FCI will install and maintain Vehicle Tracking Pads, Curb Socks, Inlet/Outlet Protection, and Concrete Washout locations as detailed in the plan. 06/08/2018 X X X X DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Legend and Details.dwg4/4/2018 9:20 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO LEGEND AND GENERAL NOTES PROJECT STATUS: 75% CD SWW RBG C-0012017-44 04/03/18 06/08/2018 12.7'X26" IV IV WV WV WV WV WV WV WV WV IV IV IV IV IV IV HY D DYHWV C C C T WV WV WV compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c t compa c tcompactcompact DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Legend and Details.dwg4/4/2018 9:22 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO EROSION CONTROL PLAN PROJECT STATUS: 75% CD SWW RBG C-1212017-44 04/03/18 06/08/2018 DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Legend and Details.dwg4/4/2018 9:22 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO DETAILS - 1 PROJECT STATUS: 75% CD SWW RBG C-5012017-44 04/03/18 06/08/2018 DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Legend and Details.dwg4/4/2018 9:23 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO DETAILS - 2 PROJECT STATUS: 75% CD SWW RBG C-5022017-44 04/03/18 06/08/2018 FCI Constructors, Inc. STORMWATER FIELD INSPECTION REPORT Constructors, Inc. Project Name: Erosion Control Supervisor/SWMP Administrator: Inspector(s) (Name & Title): Date & Time of Project Inspection: Weather at Time of Inspection: REASON FOR INSPECTION/EXLUSION ☐ Routine Inspection: (minimum every 7 Calendar Days, maximum 14 Days) ☐ Runoff Event: (Post-storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. If no construction activities will occur following a storm event, post-storm event inspections shall be conducted prior to re-commencing construction activities, but no later than 72 hours following the storm event. The occurrence of any such delayed inspection must be documented in the inspection record.) Routine inspections still must be conducted every 7 to 14 calendar days. Storm Start Date & Time: Approximate End Time of Storm (hrs): ☐ Winter Conditions Inspections Exclusion: Inspections are not required at sites where construction activities are temporarily halted, snow cover exists over the entire site for an extended period, and melting conditions posing a risk of surface erosion do not exist. This exception is applicable only during the period where melting conditions do not exist, and applies to the routine 14-day inspections, as well as the post-storm-event inspections. Documentation must include: dates when snow cover occurred, date when construction activities ceased, and date when melting conditions began. ☐ Other: SWMP MANAGEMENT CURRENT CONSTRUCTION ACTIVITIES: Yes No NA Estimate of disturbed area at the time of the inspection: Acres (a) Is the SWMP notebook located on site? (b) Are changes to the SWMP documents noted and approved? (c) Are the inspection reports retained in the SWMP notebook? (d) Are corrective actions from the last inspections completed? (e) Is a Spill Prevention Control and Countermeasure Plan retained at the project site? (In SWMP) (f) Is a list of potential pollutants retained at the site? (In SWMP) BMPs ON SITE AT TIME OF INSPECTION In SWMP Used Not Needed at this time In SWMP Used Not Needed at this time (a) EROSION CONTROL BMPs ON SITE (b) MATERIALS HANDLING, SPILL PREVENTION, WASTE MANAGEMENT AND GENERAL POLLUTION PREVENTION Seeding ☐ ☐ ☐ Mulching/Mulch Tackifier ☐ ☐ ☐ Stockpile Management ☐ ☐ ☐ Soil Binder ☐ ☐ ☐ Materials Management ☐ ☐ ☐ Soil Retention Blankets ☐ ☐ ☐ Concrete Waste Management ☐ ☐ ☐ Embankment Protector ☐ ☐ ☐ Saw Water Management (Slurry) ☐ ☐ ☐ Grading Techniques ☐ ☐ ☐ Solid Waste/Trash Management ☐ ☐ ☐ Berm/Diversion ☐ ☐ ☐ Street Sweeping ☐ ☐ ☐ Check Dams ☐ ☐ ☐ Sanitary Facility ☐ ☐ ☐ Outlet Protection ☐ ☐ ☐ Vehicle and Equip. Management ☐ ☐ ☐ Other: ☐ ☐ ☐ Other: ☐ ☐ ☐ (c) SEDIMENT CONTROL BMPs ON SITE Stabilized Const. Entrance ☐ ☐ ☐ Sediment Basin ☐ ☐ ☐ Sediment Trap ☐ ☐ ☐ Perimeter Control (Silt Fence) ☐ ☐ ☐ Inlet Protection ☐ ☐ ☐ Dust Control ☐ ☐ ☐ 29 06/08/2018 CONSTRUCTION SITE ASSESSMENT & CORRECTIVE ACTIONS The construction site perimeter, all disturbed areas, material and/or waste storage areas that are exposed to precipitation, discharge locations, and locations where vehicles access the site shall be inspected for evidence of, or the potential for, pollutants leaving the construction site boundaries, entering the stormwater drainage system, or discharging to state waters. If there is evidence of sediment or other pollutants discharging from the site, see "Construc- tion Site Assessment." All erosion and sediment control practices identified in the SWMP shall be evaluated to ensure that they are maintained and operating correctly. Identify the condition of the BMP, using more than one letter if necessary: (I) Incorrect Installation; (M) Maintenance is needed; (F) BMP failed to operate; (A) Additional BMP is needed; (R) Remove BMP. Keep copies of this blank page for additional room if needed. Continuous maintenance is required on all BMPs. BMPs that are not operating effectively, have proven to be inadequate, or have failed must be addressed as soon as possible, immediately in most cases. Location BMP Condition Comments: Description of Corrective Action and Preventative Measure Taken Date Completed & Initials CONSTRUCTION SITE ASSESSMENT (a) Is there evidence of discharge of sediment or other pollutants from the site? ☐ Yes ☐ No *If yes, explain the discharge and the corrective actions in "Construction Site Assessment & Corrective Actions" or "General Notes." (b) Has sediment or other pollutants discharging from the site reached state waters? ☐ Yes ☐ No GENERAL NOTES INSPECTION VERTIFICATION I certify that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. Contractor's Erosion Control Supervisor/SWMP Administrator (Signature Required) Date: COMPLIANCE CERTIFICATION Corrective action(s) has been taken to the best of my knowledge and belief. Contractor's Erosion Control Supervisor/SWMP Administrator (Signature Required) Date: 30 06/08/2018 FUGITIVE DUST CONTROL Fugitive Dust Control Plan: FCI does not anticipate any large amounts of dust being generated from this site as most of the earthwork is related to the mass excavation for the new Aspen Ambulance District building. The earthwork subcontractor will have a water truck available as needed to address dust concerns. For any dust control related concerns that may come up please contact the onsite Superintendent (contact info can be found at the beginning of this Construction Management Plan). 06/08/2018 EMISSIONS Proper Vehicle Maintenance All vehicles associated with this construction project will be properly maintained such that the engines will function within manufacturer’s standards or parameters. Emissions Emissions from diesel engines shall be of a shade or density no darker than 40% opacity, except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. 06/08/2018 NOISE SUPPRESSION General Any activity generating noises greater than 70db will be performed Monday thru Friday from 9AM to 5PM only. Noise Suppression Plan Acoustical barriers at the project site are planned and will include a combination of temporary sound walls at the west side of the project site—reference site logistics plan and attached product data on noise barriers. FCI will require all subcontractors to follow the appropriate “Noise Blocking Methods” for any equipment generating noise greater than 70 decibels. When appropriate, equipment will be fitted with or will have any of the following: Residential Grade combustion engine exhaust silencers Pneumatic hand power tools will be fitted with a silencer on the air exhaust port Shields/shrouds/intake & exhaust mufflers Noise deadening material (line hoppers, storage bins or chutes) Noise barriers & curtains Full plywood enclosures when feasible (generators) Auto or manually adjustable backup alarms Portable three-sided plywood enclosures to be utilized as needed. Provide a phone number where the foreman can be reached prior to the start of the project: Project Manager – Brady Blackmer 970-433-1600 Project General Superintendent – Brian Young 970-433-1598 06/08/2018 34 06/08/2018 35 06/08/2018 1 CONSTRUCTION WASTE MANAGEMENT PLAN: PRE-PROJECT ESTIMATES This form must be completed for the following types of projects: All New Construction All Demolition, (excluding single family & duplex) Addition/Alteration with construction valuation exceeding $50,000 (excluding single family & duplex residential) Company Name:____________________________ Contact Person:___________________________ Address:___________________________________ Telephone #:______________________________ Project Location/Address:_________________________________________________________________ Contractor:________________________________ Architect:__________________________________ Contact Person:____________________________ Contact Person:_____________________________ Telephone #:_______________________________ Telephone #:________________________________ Recycling Coordinators:___________________________________________________________________ Project Description:______________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ Waste Management Goal: FCI Constructors Brian Young 3070 I-70B, Grand Junction CO 970-434-9093 Aspen Ambulance District Facility - Castle Creek Rd, Aspen, CO Construction of a new 2 story ambulance facility Brian Young FCI Constructors Brian Young 970-433-1598 Chamberlin Architects Daniel Gartner 970-242-6804 06/08/2018 2 This project will recycle or salvage for reuse a minimum of ______ % by weight of the waste generated on-site. Waste Prevention Planning: Compliance with City of Aspen mandatory recycling requirements for businesses. Mandatory recyclables (mixed recycling) include: o newspaper o corrugated cardboard o white and colored office paper o plastic and glass bottles and jars o metal cans Compliance with Pitkin County’s Landfill Bans, i.e. no disposal of tires, appliances, yard waste, mandatory recyclables, hazardous waste, batteries, fluorescent tubes, electronic waste and large metal items. The General Contractor will contractually require all subcontractors to comply with the mandatory recycling requirements. The Construction Waste Reduction Plan shall be implemented and executed as follows and as on the chart: o Salvageable materials will be diverted from disposal where feasible. o There will be a designated area on the construction site reserved for dumpsters which are specifically labeled for respective materials to be received. o Hazardous waste will be managed by a licensed hazardous waste vendor. Communication & Education Plan: As each new subcontractor comes on site, the recycling coordinators will present him/her with a copy of the Waste Management Plan and provide a tour of the recycling areas. All recycling containers will be clearly labeled. Containers shall be located in close proximity to the building(s) under construction in which recyclables/salvageable materials will be placed. Recycling coordinators shall inspect the containers on a weekly basis to insure that no contamination is occurring and precautions shall also be taken to deter any contamination by the public. Waste Hauler(s): Company: Contact: Waste Disposal Fees (fees vary by landfill): o Mixed C&D $______ / ton o Scrap Metal $______ / ton (free at PCSWC) o Soil & Rock $______ / ton o Asphalt $______ / ton o Yard Waste $______ / ton o Recycling $______ / ton Recycling Calculation (Optional): 64 0 8.50 12.50 Not sure how to answer this. We will recycle everything possible as described below 75 TBD TBD 06/08/2018 3 If all construction waste was disposed in landfill and none was diverted through salvage, reuse, or recycling: _______ tons x $_______ / ton = $ ______ (Waste) Recycling or Reuse or Salvage: _______ tons (not dumped into landfill) x $ _______ / ton (Recycling) Waste $ _______ - Recycling $ _______= $_________________ TOTAL POTENTIAL SAVINGS Worksheet to estimate the specific materials involved in the waste management plan (This may be done on a separate sheet): 1.Salvage Yes No Do you plan to salvage materials from this project prior to demolition or construction? If YES, list the materials that will be salvaged (e.g., doors, windows, casing, toilets, sinks, fixtures, wood siding, tiles, etc.) Facility or Salvage company receiving material. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 2.Source Separation Yes No Do you plan to source separate any materials for delivery to a recycling facility (e.g. separation of material such as wood, concrete, metal into separate bins)? Materials Hauler Facility 3.On-Site Use Yes No x Metals - Ferrous & Non-Ferrous Cardboard & paper waste from office FCI Constructors Rio Grande Recycling Center x Plastic / glass bottles & cans FCI Constructors Rio Grande Recycling Center TBD - hauled by FCI Non-ferrous metals TBD - hauled by FCI FCI Constructors TBD Ferrous metals 76 06/08/2018 4 Do you plan any on-site reuse activities for this project (e.g. reuse of wood forms for concrete, on-site crushing of concrete for on-site use, use of reusable containers or pallets for material deliveries, etc.)? If, please describe: 4.Disposal at Landfill Yes No Will any materials be disposed of (not recycled or salvaged) at the landfill? Estimate the number of tons of material to be taken to the landfill for disposal: __________ tons Comments: x x *Wood concrete forms will be reused to the extent possible before disposal *All of the asphalt removed from the site will be taken to Elam to be crushed and reused *All of the concrete removed from the site will be taken to Pitkin County Landfill to be diverted 20 This is a very subjective estimate of waste material taken to landfill over the course of this project. 06/08/2018 5 HERE ARE SOME RESOURCES TO SALVAGE/REUSE/RECYCLE MATERIALS: Material Estimated Quantity Options Facility Options Landscape debris Keep separate for reuse and/or wood sale; Recycle Pitkin County Solid Waste Center Clean dimensional wood and palette wood Keep separate for reuse by on-site construction or by site employees for reuse in home projects; Recycle ReStore; Pitkin County Solid Waste Center; On-Site; Employees Plywood, OSB, particle board Reuse; Recycle Pitkin County Solid Waste Center Painted or treated wood Reuse; Recycle Pitkin County Solid Waste Center Concrete Recycle Pitkin County Solid Waste Center Concrete Masonry Units Recycle; Keep separate for re-use by on-site construction or by site employees Pitkin County Solid Waste Center; On-Site; Employees Metals Recycle Precious Metals Recovery (970-963-8877); Pitkin County Solid Waste Center Paint Recycle (Colorado Bill SB14- 029 prohibits paint going into the landfill) ReStore; Pitkin County Solid Waste Center; Local Paint Stores Window Glass Recycle; Keep separate for re-use by on-site construction or by site employees ReStore; On-Site; Employees; Pitkin County Solid Waste Center Mixed Recyclables: Plastics, Aluminum, Paper, Newsprint, Glass bottles Mandatory recycling of these materials Pitkin County Solid Waste Center; Paper Wise (970-945- 2885) Cabinets, Fixtures, Doors, Windows, Equipment (Stoves, Bathtub), Plumbing Reuse; Resale; Recycle ReStore; Onsite; Pitkin County Solid Waste Center Cardboard Mandatory recycling Pitkin County Solid Waste Center TOTAL Deconstruction Firms: Aspen Deconstruction (aspendeconstruction.com) Colorado Deconstruction (coloradodemolition.com) The Reuse People (deconstructioncolorado.com 78 06/08/2018