HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0071.2018 (12).ACBK Aspen Ambulance District Facility Response to City of Aspen Plan Review Comments City of Aspen Review Comment A/E Response Architectural 1. General Architectural Note: The architectural plans do not show the scale to which the plans were drawn. Please add the scale to the drawings. Each drawing has a graphic bar scale. We have gone through the drawings and added bar scales to the detail titles where they were missing. 2. Sheet A-001: This sheet is not stamped by the architect as required by Board Rule 7.1 of the Colorado Board of Licensure for Architects, Engineers, and Land Surveyors. Please stamp, sign and date this sheet. See attached revised sheet A-001 with architect’s stamp. 3. Sheet A-001: Provide the entire detail for both UL U419 and U493 to ensure the contractor has enough information to build the walls and the field inspectors have enough information to perform the inspection of these walls. See attached Appendix 1 as an addition to our specification book including the entire detail for both UL U419 and U493. 4. Sheet A-002: The code analysis does not address the required fire suppression system. The code analysis should include the type of sprinkler system to be installed. An NFPA 13 system is required per IBC Section 903. An NFPA 13 sprinkler system shall be installed throughout the building in accordance with IBC/15-903. See attached revised sheet A-002. 5. Sheet A-101: The elevator installation must be inspected by a special inspector approved by the Building Official. Provide a copy of the inspection reports and approvals to the Building Department upon completion. The General Contractor will coordinate the Building Official for an approved special inspector. They will provide a copy of the inspection reports and approval to the Building Department when it is available. 6. Sheet A-101: It appears that there may not be a 5- foot turning radius in the women’s bathroom 102 and toilet room 208. Please verify a 5’ turning A 5-foot turning radius is provided. The radius is shown as a dashed circle in details 1 & 3 on sheet A301. 07/24/2018 Aspen Ambulance District Facility, Response to City of Aspen Review Comments, page 2 radius will be provided per ANSI A117.1 Section 304.3. 7. Sheet A-102: There does not appear to be a 5-foot turning radius in shower rooms 224, 226, and 227. Please address. A 5-foot turning radius is provided. The radius is shown as a dashed circle in details 4 & 5 on sheet A301. 8. Sheet A-701: Doors 303A and 303D opening into the 1-hour stair shaft enclosure are shown as 45- minute fire rated. These doors are required to be 1-hour fire rated per IBC Table 716.5. See attached revised sheet A-701 with the change from a 45-minute fire rated door to a 1-hour rated door. 9. General Electrical Note: The electrical review does not include a review of the photovoltaic system as no PV design was submitted. No correction necessary. 10. Sheet E002: The metal light pole must be bonded to the branch circuit equipment ground to clear the breaker in the event of a line-to-case fault per NEC 250.4(B)(3). The plans show the pole bonded to a driven ground rod with will not clear the breaker in a ground fault condition. No correction necessary. General site note #1 on sheet E002 requires the installation of a separate ground wire in all raceways. 11. Sheet E201: The receptacles in the bathrooms must be GFCI-protected in accordance with NEC 210.8(B). They are not identified as such. No correction necessary. Receptacles in bathrooms are identified on sheets E201 & E202 as being type ‘RGD1’. Receptacle type ‘RGD1’ is defined on sheet E401 as GFCI-protected. A picture is included for clarity. 12. Sheet E201: The 120-volt receptacles in the vehicle bays are not identified as GFCI-protected as required by NEC 210.8(B)(8). Please address No correction necessary. Receptacles in vehicle bays are identified as being type ‘RGD1’. Receptacle type ‘RGD1’ is defined on sheet E401 as GFCI-protected. A picture is included for clarity. 13. Sheet E202: The receptacles in the bathrooms, shower rooms, and kitchen are not identified as GFCI-protected as required by NEC 210.8(B) (1 & 2). Please address. The non-GFCI-protected receptacles in the kitchen have been corrected. 14. Sheet E202: The exterior receptacles are not identified as GFCI-protected as required by NEC Exterior receptacles shown on sheet E201 are identified as type ‘ROD1’. Type ‘ROD1’ is defined 07/24/2018 Aspen Ambulance District Facility, Response to City of Aspen Review Comments, page 3 210.8(B)(4). Additionally, these receptacles must have covers that are weather-proof whether or not a plug cap is inserted and the cover must be identified as “extra-duty” per NEC 406.9 (B)(1). Please address. on sheet E401 as GFCI-protected with an ‘in-use’ cover. ‘Extra Duty’ has been added to the description. 15. Sheet E402: Fluorescent fixtures with double- ended lamps and ballasts must have an internal or exterior disconnect at the luminaire per NEC 410.130 (G)(1). Please address. No correction necessary. There are no fluorescent fixtures on the project. 16. Sheet M002: Provide a smoke detector in the return air system of furnace FR3 that shuts down the air handler upon activation of the detector per IMC 606.2.2. Return air smoke detectors are indicated for all three furnaces on Sheet M002 Furnace Schedule by Schedule Note 4 and on sheet E202 Upper Level - Power and Systems Plan. Smoke detectors are specified in section 230900 part 2.14. 17. Sheet M102: Support ducts every 10 feet and at each change of direction per IMC 603.10 and SMANCA HVAC duct construction standards. Duct supports shall be per code and SMACNA as specified in section 233100 parts 1.6 and 3.3 E. 18. Sheet M102: Seal duct seams with welds, gaskets, mastics, liquid sealants or UL 181 listed tape per IMC 603.9. Ducts shall be sealed per code as specified in section 233100 parts 1.6 C. and 2.7 G. 19. General Mechanical Note: Provide a copy of the heating and ventilation system balance report to the Building Department upon completion. This will be done and is the responsibility of the Contractor. 20. Sheet P401: Provide proper backflow protection to the irrigation lines per IPC 608. Backflow preventers for irrigation are indicated on irrigation drawings. Refer to sheet IR-1.1 Irrigation Plan Parking Lot Point of Connection #1 notes, sheet IR-2.1 Irrigation Details Parking Lot Detail 1 Backflow Preventer, sheet IR-1.0 Irrigation Plan Point of Connection #1 notes, and sheet IR-2.0 Irrigation Details Detail 1 Backflow Preventer. 21. Sheet P401: Please provide certification on all backflow protection devices as required by the Colorado Cross Connection Control Manual upon installation of devices before the irrigation and domestic water systems are commissioned. This will be done and is the responsibility of the Contractor. 07/24/2018 Aspen Ambulance District Facility, Response to City of Aspen Review Comments, page 4 22. General Note: Please provide a gas piping isometric showing the gas pipe sizes, length of pipe runs, and the BTU/hour rate of all gas-fired equipment so the gas pipe sizes can be properly verified. Refer to new Sheet P402. 07/24/2018