HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0071.2018 (15).ACBKCOMcheck Software Version 4.3.5.1
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0071.2018.ACBK
Vertical Glazing / Wall Area:14%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
405 Castle Creek rd.
Aspen, Colorado 81611
Owner/Agent:
Aspen Ambulance District Facility
Designer/Contractor:
Chamberlin Architects. Studio B
aspen, Colorado 81611
kevin@studiobarchitects.net
Project Information
Energy Code:
COMCHECK whole building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Building Area Floor Area
1-Fire Station : Nonresidential 3729
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Fire Station]2761 ---57.0 0.017 0.028
Floor: Unheated Slab-On-Grade, Horizontal with vertical >= 4 ft., [Bldg.
Use 1 - Fire Station] (c)
452 ---10.0 0.360 0.520
roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Fire Station]3232 ---57.0 0.017 0.028
NORTH
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]2953 19.0 15.0 0.041 0.064
Door: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Fire Station]904 ------0.057 0.057
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID product label, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
447 ------0.290 0.290
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]1163 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
322 ------0.290 0.290
EAST
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]1643 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
306 ------0.290 0.290
SOUTH
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]2523 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
112 ------0.290 0.290
Door: Insulated Metal, Swinging, [Bldg. Use 1 - Fire Station]40 ------0.097 0.370
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]671 19.0 15.0 0.041 0.064
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
121 ofPage
08/21/2018
08/21/2018
COMcheck Software Version 4.3.5.1
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0071.2018.ACBK
Construction Site:
405 Castle Creek rd.
Aspen, Colorado 81611
Owner/Agent:
Aspen Ambulance District Facility
Designer/Contractor:
Chamberlin Architects. Studio B
aspen, Colorado 81611
kevin@studiobarchitects.net
Project Information
Energy Code:
COMCHECK whole building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Allowed Interior Lighting Power
Proposed Interior Lighting Power
Interior Lighting TBD: No lighting fixtures specified
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
123 ofPage
08/21/2018
COMcheck Software Version 4.3.5.1
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0071.2018.ACBK
Construction Site:
405 Castle Creek rd.
Aspen, Colorado 81611
Owner/Agent:
Aspen Ambulance District Facility
Designer/Contractor:
Chamberlin Architects. Studio B
aspen, Colorado 81611
kevin@studiobarchitects.net
Project Information
Energy Code:
COMCHECK whole building
0 (Unspecified)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts /
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
0
0
500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
Exterior Lighting TBD: Exterior lighting zone not specified (see project screen)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
124 ofPage
08/21/2018
COMcheck Software Version 4.3.5.1
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0071.2018.ACBK
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
405 Castle Creek rd.
Aspen, Colorado 81611
Owner/Agent:
Aspen Ambulance District Facility
Designer/Contractor:
Chamberlin Architects. Studio B
aspen, Colorado 81611
kevin@studiobarchitects.net
Project Information
Energy Code:
COMCHECK whole building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
125 ofPage
08/21/2018
Inspection Checklist
Requirements: 78.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.3.5.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
126 ofPage
08/21/2018
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.2.5
[FO3]2
Slab edge insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
127 ofPage
08/21/2018
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
2.1
[FR19]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and material
permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an
approved manner.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
128 ofPage
08/21/2018
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME58]3
Outdoor air and exhaust systems have
motorized dampers that automatically
shut when not in use and meet
maximum leakage rates. Check
gravity dampers where allowed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
129 ofPage
08/21/2018
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.1.3
[IN19]3
Non-swinging opaque doors have R-
4.75 insulation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.2.1
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not
Not Observable
Not Applicable
C402.2.3
[IN6]1
Above-grade wall insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.5
[IN8]2
Floor insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.2.2
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
1210 ofPage
08/21/2018
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C402.5.3
[FI51]3
Where open combustion air ducts
provide combustion air to open
combustion fuel burning appliances,
the appliances and combustion air
opening are located outside the
building thermal envelope or enclosed
in a room, isolated from inside the
thermal envelope. Such rooms are
sealed and insulated.
Complies
Does Not
Not Observable
Not Applicable
Exception: Direct vent appliances with both intake and
exhaust pipes installed continuous to the outside.
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo doors.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
1211 ofPage
08/21/2018
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
1212 ofPage
08/21/2018