Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (32).ACBK ARCHITECT: Chamberlin Architects, P.C. BY: Casey Sievila S:\1740 - Pitkin County Ambulance Facility\6. CONSTRUCTION\PROPOSAL REQUESTS\PR#020.1740.doc PROPOSAL REQUEST FIELD OWNER ARCHITECT CONTRACTOR PROJECT: Aspen Ambulance District Facility OWNER: Pitkin County 123 Emma Road, Suite #106 Basalt, CO 81621 TO: FCI Constructors, Inc. 3070 I-70 Business Loop Building A Grand Junction, CO 81504 PROPOSAL REQUEST NO: Twenty (20) DATE: March 5, 2019 ARCHITECT'S PROJECT NO: 1740 CONTRACT DATED: May 9, 2018 Please submit an itemized quotation for changes in the Contract Sum and/or Time incident to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawings Sheet M101: 1. Shift IR-1 combustion air and combustion vent east to grid line E as illustrated in the attached Sheet M101. 2. Shift IR-3 combustion air and combustion vent east to grid line C as illustrated in the attached Sheet M101. Sheet M102: 1. Shift the outdoor air intake plenum to the east, add a duct sleeve enclosure at the structural column, and increase the width of the plenum to compensate for obstruction by column as illustrated in the attached Sheet M102. Attachments: M101; M102 A B C D E H I J LOBBY 101 WOMEN 102 MEN 103 TRAINING ROOM 104 ELEC. 105 APPARATUS BAY #1 106 APPARATUS BAY #2 107APPARATUS BAY #3 108 APPARATUS BAY #4 109 APPARATUS BAY #5 110 APPARATUS BAY #6 111 DECON 112 READY ROOM 113 MEDICAL STORAGE 114 FITNESS 115 STAIR 302 ELEVATOR 301 STAIR 303 STORAGE 116 F G GROUND LEVEL MECHANICAL PLAN IR-1IR-2 IR-3 CH-1 UNDER STAIRS SS-1 8'-0" AFF COMBUSTION AIR AND EXHAUST THROUGH WALL >10' HORIZONTALLY FROM AIR INTAKE ABOVE WITH CENTERLINE AT 13'-6" AFF (TYP OF 3) CU-3 SA-2 12"x12" 430 CFM 20"x20" SA AND RA THROUGH FLOOR ABOVE 14"Ø RA UP THROUGH FLOOR ABOVE SA-1 14"Ø 735 CFM SA-3 9"x9" 240 CFM SA-3 9"x9" 230 CFM SA-1 6"Ø 75 CFM SA-5 6"Ø 50 CFM SA-5 6"Ø 30 CFM EA-1 6"x6" 70 CFM EA-1 6"x6" 70 CFM EA-1 6"x6" 40 CFM 0'8' 4'OARAEAFACU-2 CU-1 RA-2 18"x18" RA-1 24"x24" RA-3 10x10" RA-3 10x10" RA-1 12"x24" SA-5 6"Ø 100 CFM T M T 12"Ø AT 12'-0" AFF AT 12'-0" AFF 12"Ø SPIRAL10"Ø SPIRAL6"Ø SPIRAL 20"x20" 12"Ø 6"Ø SPIRAL 10"Ø SPIRAL M 6"Ø SPIRAL 8"Ø SPIRAL ERV-2 20"x20" HC-2 12"Ø 14"x12" EA-2 24"x12" 320 CFM 12"Ø EA AND OA THROUGH FLOOR ABOVE 6"Ø 6"Ø T SWSSWRSWSSWRSWSSWR SWSSWR2" PIPING THROUGH FLOOR ABOVE 15'-10" 3' 3' 3'-11" EF-1 13'-4" AFF 22"x22" EA-1 36"x20" SA-2 22"x26" 2700 CFM OA 17"x22" RADIUSED ELBOW TO 17"x22" THROUGH FLOOR ABOVE 28"x15" OA EF-2 13'-4" AFF6"Ø EA BDD 22"x26" BDD VENT HOOD (TYP OF 3) INTAKE HOOD (TYP OF 3) ALL REFRIGERANT PIPING ON GALVANIZED STRUT ANCHORED TO HOUSEKEEPING PADS AND COVERED WITH 18 GAUGE GALVANIZED HAT CHANNEL PROTECTIVE LID 30 CFM SA-1 14"Ø 735 CFM RA-1 24"x12" 6"Ø T TT RADIANT TUBE CENTERLINE AT 12'-4" AFF RADIANT TUBE CENTERLINE AT 12'-4" AFF RADIANT TUBE CENTERLINE AT 12'-4" AFF 12"Ø 4"Ø UNDERCUT 8"Ø, Voa=185CFM 4"Ø, Voa= 35CFM 10"Ø, Voa=320CFM 14"x26" OA FROM ABOVE TO 22"x26" 13'-4" AFF FACING DOWN DIRECTING AIR EAST PIPING THROUGH STRUCTURE REFRIGERANT PIPING UP IN WALL TO NEAR STRUCTURE ABOVE REFRIGERANT PIPING THROUGH FLOOR ABOVE M 1/2" HWS AND HWR ON WALL BOLT CONDENSING UNIT TO HOUSEKEEPING PAD IN FOUR PLACES (TYP) 12" LONG 4" FLEX DUCT 24" LONG TYPE B 4" FLEX VENT 12" LONG 4" FLEX DUCT 24" LONG TYPE B 4" FLEX VENT 12" LONG 4" FLEX DUCT 24" LONG TYPE B 4" FLEX VENT FLOOR 1 233 4 HOUSEKEEPING PAD (TYP) 12"Ø 3/4" HWS AND HWR FROM ABOVE PROVIDE RESTRAINTS ATTACHED TO WALL AND ANCHOR SS-1 TO SHELF. CARBON MONOXIDE DETECTOR FOR EF-1 CONTROL AND ALARM, ℄ AT 5'-0" AFF AT 12'-0" AFF AT 12'-0" AFF 1/2" HWS AND HWR FROM ABOVE 10"Ø SUPPORT ON TRAPEZE WITH < 12" LONG RODS AND SWIVELS AT ENDS OF RODS 12"Ø BYPASS AND DAMPER M 4 4 KEYED NOTES 1.INSTALL TOP OF UNIT AT 2" BELOW JOISTS. HANG FROM JOISTS WITH RODS AND B-LINE CHSCS SERIES ISOLATORS AT FOUR CORNERS. INSTALL STRUT BRACING TO STRUCTURE IN NORTH-SOUTH AND EAST-WEST DIRECTIONS WITH B-LINE SERIES CNNK PADS AT BRACE CONNECTION POINTS . 2.REFER TO IR-1 INFRARED HEATER SUPPORT DETAIL ON SHEET M301. 3.REFER TO IR-2 AND IR-3 INFRARED HEATER SUPPORT DETAIL ON SHEET M301. 4.SUPPORT ON TWO STRUT SPANNING ACROSS AND ANCHORED TO TWO JOISTS. INSTALL B-LINE SERIES RM-D NEOPRENE MOUNTS ANCHORED TO FAN AND STRUT. NOTED OTHERWISE. GENERAL NOTES APPLICABLE TO ALL MECHANICAL PLANS THE MECHANICAL CONTENT OF THIS DRAWING IS DIAGRAMMATIC AND NOT NECESSARILY TO SCALE. THE CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO LOCATIONS OF DUCTWORK, EQUIPMENT, PIPING, AND SUPPORTS IN ORDER TO COORDINATE WITH BUILDING CONSTRUCTION AND WORK OF OTHER TRADES. ALL BRANCH DUCTS SERVING ONE DIFFUSER OR EXHAUST GRILLE SHALL INCLUDE A VOLUME DAMPER AT THE BRANCH DUCT POINT OF ORIGIN, UNLESS THE GRILLE OR DIFFUSER HAS BEEN SPECIFIED TO INCLUDE A BALANCING DAMPER. BRANCH DUCTS SERVING SINGLE DIFFUSERS SHALL BE SIZED TO MATCH THE DIFFUSER NECK SIZE UNLESS OTHERWISE INDICATED. ALL FLOOR PENETRATIONS SHALL BE FINISHED WITH FIRE STOP MATERIALS IN ACCORDANCE WITH THE SPECIFICATIONS. INDICATED DUCT DIMENSIONS ARE SHEET METAL DIMENSIONS. ROUND DUCTS ARE INDICATED USING SINGLE LINE. REFER TO SCHEDULES AND SPECIFICATIONS FOR EQUIPMENT AND MATERIALS OF CONSTRUCTION. AIR VOLUME INDICATED FOR SA DIFFUSERS AND SA GRILLES INCLUDES AIR FROM FURNACE AND VENTILATION AIR FROM ERV. INDICATED MOUNTING HEIGHTS ARE TO BOTTOM OF EQUIPMENT UNLESS NOTED OTHERWISE. DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE: CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N C 2016 CHAMBERLIN ARCHITECTS05/09/2018 1740 CASTLE CREEK ROAD ASPEN, COLORADO PROJECT STATUS: 100% CD DCR DCR ASPEN AMBULANCE DISTRICT FACILITY NO:ISSUED FOR:DATE: 356 ECHO CANYON COURT, GRAND JUNCTION, CO 81507-9584 PHONE 970-434-9819 / CELL 970-260-1781 / clintral@bresnan.net RALSTON MECHANICAL CONSULTING, LLC Engineering for HVAC, Refrigeration, and Plumbing M101 GROUND LEVEL MECHANICAL PLAN PR#020 02/27/20194 A B C D E H I J 1 2 4 5 6 7 WAITING 201 OFFICE 203 OFFICE 204 OFFICE 205 FLEX 206 MECH/ELEC 209 CORRIDOR 210 STOR. 213 OFFICE 212 CONFERENCE 214 LIBRARY / REPORTS 215 CORRIDOR 220 UNIFORM LOCKERS 221 LAUNDRY 222 CORRIDOR 224 SHOWER 225 SHOWER 226 SHOWER 227 BUNK RM 229 BUNK RM 230 BUNK RM 231 BUNK RM 232 STORAGE 228 3 TOILET 208 IT 211 DINING 217 DAYROOM 216 KITCHEN 218 MECH 223 F PANTRY 219 STAIR 303 STAIR 302 ELEVATOR 301 0 G DECK 233 UPPER LEVEL MECHANICAL PLAN BL-1 LR-1 11'-11"x2'-9 3/4" SS-1 LR-1 36"x132" LR-1 36"x30" 4"Ø DRYER VENT DUCT 36" AFF 14"Ø SPIRAL OA THROUGH STRUCTURE SA-2 16"x14" 710 CFM SA-1 6"Ø 105 CFM SA-1 8"Ø 135 CFM SA-1 6"Ø 100 CFM SA-1 6"Ø 110 CFM SA-4 12"x6" 150 CFM SA-4 20"x8" 315 CFM SA-4 16"x8" 265 CFM SA-2 24"x12" 910 CFM SA-2 18"x12" 580 CFM SA-1 6"Ø 100 CFM SA-1 8"Ø 120 CFM SA-1 6"Ø 100 CFM SA-1 6"Ø 70 CFM SA-1 6"Ø 80 CFM 14"Ø SPIRAL SA THROUGH STRUCTURE 12"Ø SPIRAL RA THROUGH STRUCTURE 12"Ø EA FROM HOOD 0'8' 4' PC-1 BL-2 COMBUSTION EXHAUST AND AIR PIPING AT 7'-2" AFF. INSULATE INDOOR COMBUSTION AIR PIPING. BL-2 PC-3 EA-1 6"x6" 70 CFM EA-1 8"x8" 70 CFM EA-1 8"x8" 70 CFM EA-1 8"x8" 70 CFM OARA EAFA SA-2 14"x14" 170 CFM 12" SPIRAL RA 8"Ø, Voa=200CFM FR-1 FR-2FR-3 DX-1 DX-2DX-3 ERV-1 AT FLOOR SA-2 32"x24" AT 8" AFF 600 CFM (2) 5"x14" DUCTS DOWN IN WALL BL-1 COMBUSTION EXHAUST AND AIR PIPING AT 7'-2 AFF. INSULATE INDOOR COMBUSTION AIR PIPING. TA-1 6"Ø TA-1 6"Ø TA-1 6"Ø RA-2 24"x18" RA-1 24"x12" 15"x26"32"x24" M M M M M M MM ERV-3 HC-3 RA-1 24"x12" 50 CFM RA-1 24"x12" FC-1 M BDD TA-1 6"Ø RA-2 6"x6" 16"x16" 9"Ø 16"x15"M M M 12"Ø M (3) 3" COMBUSTION AIR AND (3) 3" COMBUSTION EXHAUST THROUGH JOISTS TO AND FROM FURNACES. INSULATE INDOOR COMBUSTION AIR PIPING. MINIMIZE NUMBER OF ELBOWS. PC-4 T T T T T T T T M 8"Ø10"Ø 6"Ø, 75CFM SA-1 6"Ø 80 CFM SA-1 6"Ø 80 CFM RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" 9"Ø 8"Ø 5"Ø5"Ø 5"Ø 6"Ø 6"Ø 6"Ø 8"Ø 9"Ø 12"Ø 6"Ø 6"Ø 6"Ø 6"Ø 6"Ø 8"Ø RA-2 14"x14" 8"Ø 8"Ø 6"Ø, Voa=100CFM 6"Ø 8"Ø 12"Ø 14"Ø RA FROM BELOW 10"Ø SPIRAL RA 32"Ø SPIRAL EA 6"Ø SPIRAL FA 16"Ø SPIRAL SA 32"Ø SPIRAL OA 3 14"Ø SPIRAL SA T 14"Ø SPIRAL OA 16"Ø SPIRAL 8"Ø 6"Ø 6"Ø 2" SWS AND SWR THROUGH FLOOR 7"Ø 6"Ø 7"Ø 15"x5" ABOVE BEAM 10"Ø 7"Ø EF-3 SUSPEND FROM JOISTS SA-5 6"Ø 30 CFM 4"Ø 3"Ø, Voa=15CFM 10"Ø 3"Ø, Voa=25CFM SA-7 10"x8" 150 CFM 10"Ø 3"Ø, Voa=25CFM 3"Ø, Voa=25CFM 3"Ø, Voa=15CFM 3"Ø, Voa=15CFM 3"Ø, Voa=15CFM T HC-1 LR-1 9'-1"x2'-9 3/4" LR-1 8'-4"x2'-9 3/4" LR-1 9'-9-1/2"x2'-9 3/4" 17"x22" EA THROUGH FLOOR BELOW, TRANSITION TO 36"x30" INTO LOWER 30" OF LOUVER HWS HWR HWS HWR HWSHWRHWRHWSHWR HWS 12"Ø 14"x26" 14"x26" THROUGH FLOOR BELOW 36"x30" TO 36"x26" 1 2 4 5 6 7 20"x18" RA 20"x18" SA 10'-6" AFF 18"Ø 5"Ø OA REFRIGERANT PIPING FROM BELOW TO DX COILS 10 8HWRHWS RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" RA-1 24"x12" RANGE HOOD PC-2 COORDINATE LOCATION OF FURNACES WITH STRUCTURE ABOVE AND BELOW 11 11 12 ANCHOR TO WALL PER BL-2 INSTALLATION INSTRUCTIONS ATTACH BL-1 TO HOUSEKEEPING PAD WITH 3/8" CONCRETE ANCHORS 12"Ø 1/2" HWS AND HWR DOWN IN WALL THROUGH FLOOR 36"x30" TO UPPER 30" OF LOUVER FOR EF-3 AND ERV-3 EA 10"Ø 3 9 14 13 11 (3) ZONE CONTROLLERS 14"x11" HWSHWR COVER NO AIRFLOW AREAS WITH SHEET METAL 72"x34"x34" 60"x34"x34" EA-2 12"x24" 120 CFM 20"x20" UP BETWEEN JOISTS 24"x20" UP TO BETWEEN JOISTS 1" 1/2" 1" 1" 1" 3/4" M M 15 151634"x40" OA DOWN 32"x40" EA UP 32"x24" 10"Ø SLEEVE AROUND COLUMN SEALED TO WALLS OF PLENUM. INSULATE SLEEVE WITH 2" THICK DUCT WRAP. AIR INTAKE >10FT EAST OF IR-1 COMBUSTION EXHAUST BELOW 4 KEYED NOTES 1.12"Ø EA THROUGH FLOOR BELOW. 2.12"Ø OA THROUGH FLOOR BELOW. 3.6"Ø EA FROM TOILET 208 TO ERV-1 RA INLET. 4.20"x18" EA ABOVE 20"x18" OA SERVING FR-1. 5.20"x18" EA ABOVE 20"x18" OA SERVING FR-3. 6.20"x18" OA SERVING FR-2. 7.20"x18" EA SERVING FR-2. 8.12"x9" FRESH AIR FROM ERV-1 THROUGH HC-1 AND UP TO 11'-6" AFF. 9.10"Ø EA FROM ERV-1 TO EA MAIN. 10.3/4" HWS AND HWR DOWN THROUGH FLOOR. 11.HANG FROM JOISTS WITH RODS AT FOUR CORNERS. INCLUDE B-LINE CHSCS SERIES ISOLATORS AND STRUT BRACING TO STRUCTURE IN NORTH-SOUTH AND EAST-WEST DIRECTIONS. 12.SUPPORT WITH FOUR B-LINE SERIES RM-D NEOPRENE MOUNTS ANCHORED TO ERV AND FLOOR. 13.10"Ø RA TO ERV-1. 14.10"Ø OA TO ERV-1. 15.12"Ø BYPASS DAMPER. 16.40"x18" EA ABOVE AND 40"x18" OA BELOW.M102 UPPER LEVEL MECHANICAL PLAN DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE: CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N C 2016 CHAMBERLIN ARCHITECTS05/09/2018 1740 CASTLE CREEK ROAD ASPEN, COLORADO PROJECT STATUS: 100% CD DCR DCR ASPEN AMBULANCE DISTRICT FACILITY NO:ISSUED FOR:DATE: 356 ECHO CANYON COURT, GRAND JUNCTION, CO 81507-9584 PHONE 970-434-9819 / CELL 970-260-1781 / clintral@bresnan.net RALSTON MECHANICAL CONSULTING, LLC Engineering for HVAC, Refrigeration, and Plumbing PR#020 02/27/20194