Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (35).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 001 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 001 Date Created: 7/16/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Daniel Gartner FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationArchitectural/StructuralSOG Vapor Retarder Location & Under Slab Insulation Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Patrick Hummel 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Studio B Architects Kevin Heath 1 Question Date Required: 7/23/2018 Please clarify the following questions in regards to interior slab-on-grade details: 1.) It is unclear from the plans and specifications where the plastic vapor retarder under the interior slab-on-grade is to be located (directly under the slab and over the 4" gravel layer, or under the 4" gravel layer). Specification section 033000-3.5-A-2 notes to "Place plastic vapor retarder as indicated in the drawings". However, neither the architectural or structural drawings or details appear to detail the desired location for the vapor barrier. Further, specification section 072600 does not provide direction on placement of this vapor retarder. FCI is assuming the plastic vapor retarder will go over the 4" gravel layer, but please advise. 2.) Interior slab-on-grade section cuts on A511, A512, and A513 and details on A601 show rigid insulation to be placed underneath the interior slab on grade. Pre-bid question #36 asked for clarification on the placement of rigid insulation below interior slab-on-grade, but there is still confusion on what is required. The response to this pre-bid question said to reference specification section 072100-3.3. but FCI still has the following questions: a. It appears that spec section 072100-3.3-D directs this under slab rigid insulation to extend in only 24" from exterior wall. Please verify that this is correct and the intent is not for the under slab rigid insulation to be placed under the entire interior slab-on-grade. b. FCI is assuming that this under slab insulation is to meet the requirements of spec section 072100-2.1 (same product spec as foundation wall rigid insulation). Please verify correct and advise on the thickness of this insulation. c. Structural details on S300 do not show this under slab rigid insulation. At the locations of this under slab insulation is it acceptable to reduce the gravel layer the thickness of the rigid insulation, or does gravel layer need to be maintained at 4" and structural fill thickness reduced? Suggestion Answer Date Answered: 7/26/2018 1. VAPOR BARRIER IS TO BE PLACED DIRECTLY UNDER THE CONCRETE SLAB AND OVER THE 4" GRAVEL LAYER. Prolog Manager Printed on: 7/26/2018 FCI_Integration Page 1 Request for Information 001 Detailed, RFIs Grouped by RFI Number 2. UNDERSLAB RIGID INSULATION TO EXTEND IN ONLY 24" FROM EXTERIOR WALL - NOT UNDER THE ENTIRE INTERIOR SLAB. 2b. ASSUMPTION IS CORRECT. INSULATION TO BE R-15 MINIMUM TO MEET IECC REQUIREMENTS AS PER SHEET A002. 2c. GRAVEL LAYER SHOULD BE MAINTAINED AT 4-INCHES. THE STRUCTURAL FILL THICKNESS MAY BE REDUCED. 2018.07.25 - JONATHAN WEST Prolog Manager Printed on: 7/26/2018 FCI_Integration Page 2