Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (49).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 015 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 015 Date Created: 8/24/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationElectricalHHS & AADF Electrical Service Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 8/31/2018 Please refer to attached drawing Sheet E002 shows the new electrical disconnect, meter and CT's entering the existing Health & Human Services building on the far southwest corner of the building. We have found that the existing MDP in the building is actually further north, on the lower level under the west entrance. The existing conduit enters the MDP from the bottom, which is approximately 10' deep and the electrical room walls are very crowded making core drilling difficult and would likely require relocating piping or equipment. In an effort to eliminate a deep excavation or additional core holes on the west side of the building we have confirmed with Holy Cross that we can install the disconnect, meter and CT's on the west island in the parking lot where the new transformer is to be placed (see attached drawing). Libby with Holy Cross has confirmed that the layout will work for them. We will likely need to add some bollards to the island and Holy Cross will determine the quantity and placement with us on site. We are proposing to tie to the existing conduits when the current transformer is removed and pull new feeders from the island to the MDP. Please confirm that this plan is acceptable. Suggestion Answer Date Answered: This is acceptable to me. WLM 8/25/18 Prolog Manager Printed on: 8/27/2018 FCI_Integration Page 1 compact compactcompactcompactE Tap Box (2) - 3" to AAD building service Light Pole CT / Meter 600A fused disconnect (2) 3" pvc (2) 3" pvc to HHS building service Here is the proposed layout for the transformer island @ Aspen Ambulance. Let me know if this set up will work for Holy Cross and we will run it by the design team also. If this layout works, what will the requirement be for bollards?