HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (50).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 016
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 016 Date Created: 8/24/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ClarificationArchitecturalTackboard Specifications
Company Name Contact Name Copies NotesCc:
Chamberlin Architects, Inc. Daniel Gartner 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 8/31/2018
Per response to pre-bid questions and answers item #73, a specification for tackboards (shown per elevations 5&7/A407)
is to be provided as part of Addendum 03. Addendum #3 has not been issued from the design team. Please advise if a
specification for the tackboards will be issued.
Suggestion
Answer Date Answered: 9/4/2018
Tack surface shall be 1/4" thick Forbo Bulletin Board or equivalent. The bulletin board shall be directly glued to the
gypsum wall board with an aluminum J trim at the top and bottom.
Casey Sievila, Chamberlin Architects 9/4/2018
Prolog Manager Printed on: 9/4/2018 FCI_Integration Page 1
Project Name Aspen Ambulance District Facilityupdated18-May-18Location Aspen, COPrepared by: FCI Constructors, Inc.ITEM #DRAWING / SPECIFICATION SECTIONDESCRIPTIONREVIEWERREVIEW DATEA/E RESPONSERESPONSE DATEPre-Bid Questions / Comments - CD's dated 5/9/201868 A612/A651Wood stair treads- they are shown as fastened from the bottom side of the stairs. The bottom portion of the stair is inaccessible from underneath. How would they be fastened ?TT 5/21/2018As an alternate to fastening the treads from below the stair, epoxy (6) 3/16" DIA threaded rods into the concrete stair treads (or weld to stair pan before pouring concrete). Orient in two rows of 3 spaced 6" apart and 24" O.C. from tread center set. Rods to protrude1/2" from top of concrete, match rod layout with drilled holes in wood tread and adhere with construction adhesive formulated for wood and concrete.69 104410Fire extinguishers & cabinets are specified however none appear on the drawings. Please clarify.TT 5/21/2018 Reference reissued sheet A002 with ADD #2.70 A301Enlarged Plan-Ready Rm 113- "Double Slinger workstation…" what is this item and who is responsible for furnishing & installation? Please clarify.TT 5/21/2018The manufacturer of this item as well as the other storage items in Ready Room 113 is basis-of-design Gear Grid Corporation or equivalant. These items are contractor supplied and installed. 71SPECIALTIESWall Protection- are there any locations where corner guards should be provided? None currently shown or specified. TT 5/21/2018 No corner guards are required.72 A701Signage Schedule- Type F- none indicated. Please clarify.TT 5/21/2018Sign type F as detailed in Sign Typer 3/A701 is called out in interior elevation 3/A40473 A407Interior elevations 5 & 7- Tackboard surface- there is no spec for this item. Please provide specifications.TT 5/22/2018This will be addressed in Addendum #3.74 101100Specification for Visual Display Units - this section does not appear to apply to the project with the use of Dsry Erase Coatings specified in section 099735. Please clarify.TT 5/22/2018The display board specified in 101100 is for the Magnetic Presentation Wall shown in Interior elevation 4/A405. The training room wall needs to be projectable and this product works for marker, magnets and projection. Section 099735 is for the Marker Wall (MW) coating noted in the offices and conference room on sheet A162, it only accommodates markers.75 S300Wall sections 6 & 9- vertical & horizontal wall reinforcing is not noted with regards to size and spacing (except for 2-#5 bars at top & bottom of the wall). Please clarify.TT 5/22/2018 #5@16 VERT. #4@12 HORIZ.767778798081828384858687888990PRE-BID QUESTIONS6FCI Constructors, Inc.