HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (52).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 018
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 018 Date Created: 8/30/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
DirectionArchitectural/ElectricalHeat Trace Clarification
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Chamberlin Architects, Inc. Daniel Gartner 1
Question Date Required: 9/6/2018
Per the panel schedule for the new LB panel, circuit #24 is dedicated to the Electric Heat: Gutter & Downspout Heat Trace.
The drawings do not show where the heat trace it to be located, how it is to be controlled, and there is not a specification
for the heat trace either.
Please provide the following for the heat trace system:
1. Locations required
2. Specification for materials to be used
3. How the heat trace will be controlled
4. Sequence of operation for controls
Suggestion
Answer Date Answered: 10/16/2018
1. SEE ATTACHED AMENDED SHEET E202A FOR INFORMATION ON THE HEAT TRACE SYSTEM.
2. SEE ATTACHED REVISED SHEET A141 FOR REVISED GUTTER & DOWNSPOUT INFORMATION AND AREVISED
CANOPY ROOF PLAN.
2018.10.16 - JONATHAN WEST
Prolog Manager Printed on: 10/16/2018 FCI_Integration Page 1
..A B C D E G.9 I J
1
2
4
5
6
7
3SLOPE 1 1/2 :12SINGLE PLY ROOF
MEMBRANE ON
PROTECTION BOARD ON
RIGID INSULATION
F
PRE FINISHED MTL GUTTER
& DOWNSPOUTS2
A641
________________________________________
CANOPY BELOW, RE:
0
G
DECK BELOW
CRICKET AT ELEVATOR
ROOF
SLOPE 1/4 :12VTR, RE: PLUMB
VTR, RE: PLUMB
2
A641
________________________________________
ANTENNA MOUNT
PRE-FINISHED METAL
GRAVEL STOP WITH
CONTINUOUS GALV CLEAT
PRE-FINISHED METAL
GRAVEL STOP WITH
CONTINUOUS GALV CLEAT
GUTTER HIGH POINT
SST PIPE SNOW GUARDS
/2 A141
1
A641
________________________________________
3
A641
________________________________________
3
A641
________________________________________
OPP
4
A641
________________________________________
3.5
9
DOWNSPOUT
9
DOWNSPOUT
GUTTER TRANSITION9
1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL
BE 4 INCHES.
2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF
WATER IS NOT ACCEPTABLE.
3. SEE REFLECTED CEILING PLANS FOR ADDITIONAL DIMENSIONS.
4.SLOPE ALL GUTTERS TO DOWNSPOUTS MINIMUM 1/16 INCH PER
FOOT.
5. ALL EQUIPMENT CRICKETS SHALL BE SLOPED 1/4 INCH PER FOOT.
G.9 I J
1
2
0
SLOPE 1/4" / 12"
1
A642
________________________________________
PRE-FINISHED
MTL ROOF EDGE
FLASHING
PRE-FINISHED
MTL SCUPPER
1
ASK-03
________________________________________6"DRAWN BY:CHECKED BY:
SHEET NO:
PROJECT NO:
DATE:
CHAMBERLIN ARCHITECTS
437 Main St.
Grand Junction, Colorado 81501
T 970.242.6804
725 Saint Joseph St., Suite B1
Rapid City, South Dakota 57701
T 605.355.6804
www.chamberlinarchitects.com
E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N
C 2016 CHAMBERLIN ARCHITECTSBIM 360://1740 - Pitkin County Ambulance Facility/1740-PCAF_CA.rvt10/16/2018 10:05:56 AMA141
05/09/2018
1740
CASTLE CREEK ROAD
ASPEN, COLORADO
ROOF PLAN
PROJECT STATUS: 100% CD
JW, SH JW
ASPEN
AMBULANCE
DISTRICT FACILITY
0'4'8'0'4'8'
A141
ROOF PLAN1
GENERAL ROOF NOTES
NO:ISSUED FOR: DATE:
9 RFI#018 10/16/18
0'2'4'0'2'4'
A141
CANOPY ROOF PLAN - REVISED2