Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (52).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 018 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 018 Date Created: 8/30/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category DirectionArchitectural/ElectricalHeat Trace Clarification Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Chamberlin Architects, Inc. Daniel Gartner 1 Question Date Required: 9/6/2018 Per the panel schedule for the new LB panel, circuit #24 is dedicated to the Electric Heat: Gutter & Downspout Heat Trace. The drawings do not show where the heat trace it to be located, how it is to be controlled, and there is not a specification for the heat trace either. Please provide the following for the heat trace system: 1. Locations required 2. Specification for materials to be used 3. How the heat trace will be controlled 4. Sequence of operation for controls Suggestion Answer Date Answered: 10/16/2018 1. SEE ATTACHED AMENDED SHEET E202A FOR INFORMATION ON THE HEAT TRACE SYSTEM. 2. SEE ATTACHED REVISED SHEET A141 FOR REVISED GUTTER & DOWNSPOUT INFORMATION AND AREVISED CANOPY ROOF PLAN. 2018.10.16 - JONATHAN WEST Prolog Manager Printed on: 10/16/2018 FCI_Integration Page 1 ..A B C D E G.9 I J 1 2 4 5 6 7 3SLOPE 1 1/2 :12SINGLE PLY ROOF MEMBRANE ON PROTECTION BOARD ON RIGID INSULATION F PRE FINISHED MTL GUTTER & DOWNSPOUTS2 A641 ________________________________________ CANOPY BELOW, RE: 0 G DECK BELOW CRICKET AT ELEVATOR ROOF SLOPE 1/4 :12VTR, RE: PLUMB VTR, RE: PLUMB 2 A641 ________________________________________ ANTENNA MOUNT PRE-FINISHED METAL GRAVEL STOP WITH CONTINUOUS GALV CLEAT PRE-FINISHED METAL GRAVEL STOP WITH CONTINUOUS GALV CLEAT GUTTER HIGH POINT SST PIPE SNOW GUARDS /2 A141 1 A641 ________________________________________ 3 A641 ________________________________________ 3 A641 ________________________________________ OPP 4 A641 ________________________________________ 3.5 9 DOWNSPOUT 9 DOWNSPOUT GUTTER TRANSITION9 1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE 4 INCHES. 2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF WATER IS NOT ACCEPTABLE. 3. SEE REFLECTED CEILING PLANS FOR ADDITIONAL DIMENSIONS. 4.SLOPE ALL GUTTERS TO DOWNSPOUTS MINIMUM 1/16 INCH PER FOOT. 5. ALL EQUIPMENT CRICKETS SHALL BE SLOPED 1/4 INCH PER FOOT. G.9 I J 1 2 0 SLOPE 1/4" / 12" 1 A642 ________________________________________ PRE-FINISHED MTL ROOF EDGE FLASHING PRE-FINISHED MTL SCUPPER 1 ASK-03 ________________________________________6"DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE: CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N C 2016 CHAMBERLIN ARCHITECTSBIM 360://1740 - Pitkin County Ambulance Facility/1740-PCAF_CA.rvt10/16/2018 10:05:56 AMA141 05/09/2018 1740 CASTLE CREEK ROAD ASPEN, COLORADO ROOF PLAN PROJECT STATUS: 100% CD JW, SH JW ASPEN AMBULANCE DISTRICT FACILITY 0'4'8'0'4'8' A141 ROOF PLAN1 GENERAL ROOF NOTES NO:ISSUED FOR: DATE: 9 RFI#018 10/16/18 0'2'4'0'2'4' A141 CANOPY ROOF PLAN - REVISED2