Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (53).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 019 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 019 Date Created: 9/5/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationStructuralBeam Designation Clarification Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 9/12/2018 Please refer to the attached drawing. Please provide the beam designation for the the beam located on gridline I between grid lines 3 and 2.1. Suggestion Answer Date Answered: 9/10/2018 W12x19 per 7/16/18 plan set. 9/5/18 Prolog Manager Printed on: 9/10/2018 FCI_Integration Page 1 Approver suppy, beam designation. Located on grid I. The information could not be attained from contract drawings or the addendum #2 drawings.Entire Job Entire JobJ1-1 Open J1 Status Closed DateDrawings Dwg / Question # Status Closed Date Drawings Dwg / Question # Drawings and Questions Pertaining to This RFI: Vulcraft Job # 055-18-0528 Company: Midwest Steel Works Project Manager: Phil Bartlett To: Rob Ediger Location: Aspen, CO Date: 8/31/2018 Project: Aspen Ambulance District Facility **Incomplete responses will result in delay of project. Job will be considered "Back from Approval" when all questions are fully answered All questions must be fully answered and returned to Vulcraft by:9/21/2018 Request For Information RFI #:3 **Note: Please return this RFI form with Vulcraft back from approval drawings** 3 055-18-0528 J1 Initial & Date Question Status: Open Closed Date: Question Status:Closed Date: Question Status:Closed Date: Question Status:Closed Date: Question Status:Closed Date:[ ] Response is on Vulcraft Dwg Answer: NOTE: THIS QUESTION APPLIES TO THE ENTIRE PROJECT. [ ] Response is on Vulcraft Dwg Answer: NOTE: THIS QUESTION APPLIES TO THE ENTIRE PROJECT. [ ] Response is on Vulcraft Dwg Answer: NOTE: THIS QUESTION APPLIES TO THE ENTIRE PROJECT. [ ] Response is on Vulcraft Dwg Answer: NOTE: THIS QUESTION APPLIES TO THE ENTIRE PROJECT. [ ] Response is on Vulcraft Dwg Answer: NOTE: THIS QUESTION APPLIES TO THE ENTIRE PROJECT. J1-1 Approver suppy, beam designation. Located on grid I. The information could not be attained from contract drawings or the addendum #2 drawings. Drawing # / Question # INFORMATION NEEDED Vulcraft Job#:Vulcraft Dwg #: Job Title:Aspen Ambulance District Facility Vulcraft RFI #: 1601 W. OMAHA AVE. NORFOLK, NE 68701 P.402-644-8500 F.402-644-8569 WWW.VULCRAFT.COM