Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (56).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 022 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 022 Date Created: 9/12/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationCivilParking Lot Signage Post Clarification Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Chamberlin Architects, Inc. Daniel Gartner 1 Question Date Required: 9/19/2018 Refer to attached email correspondence. Per email correspondence between Pitkin County, Chamberlin and FCI it was confirmed that the parking lot signs can use the Pozlock socket post system in lieu of the originally specified "slip-base" post system. FCI will install all of the parking lot signage using the socket post system as it has been confirmed to be acceptable. Suggestion Answer Date Answered: This RFI is for record only, no response is required. Prolog Manager Printed on: 9/12/2018 FCI_Integration Page 1 1 Sam Meeks From:Gabriel Muething <GMuething@aspenhospital.org> Sent:Friday, September 7, 2018 1:52 PM To:Brady Blackmer Cc:Rich Englehart; Sam Meeks; Sean Walmsley; Brian Young; Jonathan West (jwest@chamberlinarchitects.com); Daniel Gartner (dgartner@chamberlinarchitects.com) Subject:Re: Aspen Ambulance Signage - 8054 - FCI - ASPEN AMBULANCE - SIGNS.pdf Thanks for the description Brady. I’m fine with the less expensive option. Thank you, Gabe Gabriel Muething | Aspen Ambulance District Director Aspen Valley Hospital | Aspen, CO 970.544.1580 | Office 970.309.2099 | Mobile 970.544.1578 | Fax gmuething@aspenhospital.org On Sep 7, 2018, at 13:05, Brady Blackmer <BBlackmer@fciol.com> wrote: Gabe, It is either the “slip-base” option or the “socket system” option (same thing as Pozlock that Sam references). See below. The socket (pozlock) option is the less expensive. <image002.png><image001.png> Brady Blackmer Project Manager FCI Constructors, Inc. P.O. Box 1767 (81502) 3070 I-70 B, Bldg. A Grand Junction, CO 81504 P. (970) 434-9093 F. (970) 434-7583 C. (970) 433-1600 www.fciol.com <FCIEMail-SMALL_34a1ff73-421b-42ef-a75e-fd660366689e.png> Focused On Your Vision From: Gabriel Muething <GMuething@aspenhospital.org> Sent: Friday, September 7, 2018 12:50 PM To: 'Rich Englehart' <rich.englehart@pitkincounty.com>; Sam Meeks <smeeks@fciol.com> Cc: Sean Walmsley <seanw@rfeng.biz>; Brady Blackmer <BBlackmer@fciol.com>; Brian Young <BYoung@fciol.com>; Jonathan West (jwest@chamberlinarchitects.com) <jwest@chamberlinarchitects.com>; Daniel Gartner (dgartner@chamberlinarchitects.com) 2 <dgartner@chamberlinarchitects.com> Subject: RE: Aspen Ambulance Signage - 8054 - FCI - ASPEN AMBULANCE - SIGNS.pdf Do you have a description of the different types? I’m not sure of what product changes would mean to the look. Gabriel Muething | Aspen Ambulance District Director Aspen Valley Hospital | Aspen, CO 970.544.1580 | Office 970.309.2099 | Mobile 970.544.1578 | Fax gmuething@aspenhospital.org From: Rich Englehart [mailto:rich.englehart@pitkincounty.com] Sent: Thursday, September 06, 2018 5:45 PM To: Sam Meeks <smeeks@fciol.com> Cc: Sean Walmsley <seanw@rfeng.biz>; Brady Blackmer <BBlackmer@fciol.com>; Brian Young <BYoung@fciol.com>; Jonathan West (jwest@chamberlinarchitects.com) <jwest@chamberlinarchitects.com>; Daniel Gartner (dgartner@chamberlinarchitects.com) <dgartner@chamberlinarchitects.com>; Gabriel Muething <GMuething@aspenhospital.org> Subject: Re: Aspen Ambulance Signage - 8054 - FCI - ASPEN AMBULANCE - SIGNS.pdf I am fine with that but would ask Gabe to review and comment. I have CC’d him Thank you Rich Sent from my iPhone On Sep 6, 2018, at 4:33 PM, Sam Meeks <smeeks@fciol.com> wrote: Richard/Sean, I am in the process of getting signage contracted for the Aspen Ambulance project. I received a quote from a contractor here in Grand Junction and as you can see in the attached, the specified slip base signage is quite a bit more than the standard 2” pozlock posts. The owner would save approximately $2,665.00 if we were able to switch to the 2” pozlock system and delete the specified posts. I wanted to check with you and see if this is a possibility. Please let me know your thoughts. Sam Meeks Engineer FCI Constructors, Inc. P.O. Box 1767 (81502) 3070 I-70 B, Bldg. A 3 Grand Junction, CO 81504 P. (970) 434-9093 F. (970) 434-7583 C. (970) 618-8817 www.fciol.com <image003.png> Focused On Your Vision <8054 - FCI - ASPEN AMBULANCE - SIGNS.pdf>