Request for Information 032
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 032 Date Created: 9/21/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationStructuralFoundation Structural Fill Deletion
Company Name Contact Name Copies NotesCc:
Chamberlin Architects, Inc. Daniel Gartner 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 9/28/2018
Per various details on structural drawing S300, new concrete foundations are to be installed on top of "Compacted
Structural Fill". Per email correspondence between James Kellogg with STL Thompson and Daniel Gartner with
Chamberlin architects, it has been confirmed that the compacted structural fill will not be required. It will be acceptable to
install 4" of gravel directly on the native soils and the new concrete foundations will be installed directly on top of the 4"
gravel layer. If any large boulders are discovered, they will be removed and the voids will be filled with a compacted class
6 material.
Suggestion
Answer Date Answered:
This RFI is for record only, no response is required.
Prolog Manager Printed on: 9/21/2018 FCI_Integration Page 1
1
Sam Meeks
From:Brady Blackmer
Sent:Friday, September 21, 2018 11:36 AM
To:Sam Meeks
Subject:FW: Aspen Ambulance District Facility (AADF) - geotech
Email for RFI.
Brady Blackmer
Project Manager
FCI Constructors, Inc.
P.O. Box 1767 (81502)
3070 I-70 B, Bldg. A
Grand Junction, CO 81504
P. (970) 434-9093 F. (970) 434-7583 C. (970) 433-1600
www.fciol.com
Focused On Your Vision
From: Kellogg, James <jkellogg@ctlthompson.com>
Sent: Tuesday, June 5, 2018 5:43 PM
To: Daniel Gartner <dgartner@chamberlinarchitects.com>; Mechling, John <Jmechling@CTLThompson.com>
Cc: rich.englehart@pitkincounty.com; Tom Traggorth <TTraggorth@fciol.com>; Brady Blackmer <BBlackmer@fciol.com>
Subject: RE: Aspen Ambulance District Facility (AADF) - geotech
Gentlemen,
The natural gravel and cobble soil at this site possesses good support characteristics for structures with little volume
change under applied building loads. Subexcavation and replacement of the natural soils at this site is not anticipated or
recommended. Having a contingency for removal of large boulders is a good idea. Voids resulting from removal should
be filled with densely-compacted, Class 6 aggregate base course or similar material. A compacted 4-inch layer of Class 6
aggregate base course may be conducive to forming and pouring footings and slabs.
Best regards,
James
James D. Kellogg, P.E.
Division Manager, Glenwood Springs
CTL | THOMPSON, INC.
234 Center Drive
Glenwood Springs, CO. 81601
970-945-2809 office
970-274-6100 mobile
970-945-7411 fax
www.ctlt.com
2
Information contained herein is neither necessarily complete nor accurate. Final stamped and signed documents govern. Use of these data is solely
at the user's risk. By accessing the data contained in these files the user agrees to indemnify, hold harmless and defend CTL | Thompson, Inc.,
CTL½Thompson Texas, LLC and Commercial Testing Laboratories Inc., their employees, officers and agents from any and all claims arising from
the use of the data.
From: Daniel Gartner <dgartner@chamberlinarchitects.com>
Sent: Monday, June 4, 2018 3:51 PM
To: Mechling, John <Jmechling@CTLThompson.com>
Cc: rich.englehart@pitkincounty.com; White, Ted <twhite@CTLThompson.com>; Kellogg, James
<jkellogg@ctlthompson.com>; Tom Traggorth (TTraggorth@fciol.com) <TTraggorth@fciol.com>; 'Brady Blackmer
(BBlackmer@fciol.com)' <BBlackmer@fciol.com>
Subject: RE: Aspen Ambulance District Facility (AADF) - geotech
John,
I have received the following from FCI, the contractor for the above referenced job:
Just wanting to make sure we are all on the same page. It is understood about the requirements for Structural Fill (page 6
of the soils report). Since nearly all of the AADF building footprint is within the area of “cut” (as opposed to fill) we were
wanting to confirm that there are no requirements for 24” of over-excavation and replacement with imported structural
fill nor over-excavation and moisture conditioning of 24” of the native/on site soils. Based on the soils report we should
be able to place the 4” of gravel directly on native subgrade.
We will be carrying an allowance for removal of boulders and filling of those voids with imported structural fill.
Can you please confirm this understanding?
Thanks,
Daniel Gartner, AIA, LEED AP
C H A M B E R L I N A R C H I T E C T S
GRAND JUNCTION, CO • RAPID CITY, SD
437 Main Street
Grand Junction, CO 81501
Office (970) 242-6804
Fax (970) 422-7422
www.chamberlinarchitects.com
From: Mechling, John [mailto:Jmechling@CTLThompson.com]
Sent: Monday, January 15, 2018 3:31 PM
To: rich.englehart@pitkincounty.com
Cc: Daniel Gartner
Subject: geotech
We are having some copier/scanner issues. The attached may have some colors other than black and white. We can
resend tomorrow but I said I would get it out today.
John Mechling P.E. (Co, Mt, Tx, Ut, Id )
Principal Engineer
CTL | THOMPSON, INC
234 Center Drive
Glenwood Springs, CO 81601
Office: (970) 945-2809
Cell (970) 379-2690
3
jmechling@ctlthompson.com
www.ctlt.com
Information contained herein is neither necessarily complete nor accurate. Final stamped and signed documents govern. Use of these data is solely
at the user's risk. By accessing the data contained in these files the user agrees to indemnify, hold harmless and defend CTL/Thompson, Inc., its
employees, officers and agents from any and all claims arising from the use of the data.
Confidential Notice: This is a confidential communication. If you received it in error, please notify the sender of the delivery error by replying to this
message and then delete it from your system.
Information contained herein may not be complete or accurate. Stamped and signed engineering documents, including those signed digitally, take
precedence over preliminary data and electronic communications. CTL¦Thompson will not be liable for the completeness, correctness or readability
of electronic data. The electronic data should be checked by the addressee against stamped and signed documents.
1' - 4"SEE PLANT.O. WALLEL. 100'-0"T.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL6" METAL STUDS@ 1'-4" O.C.4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOOTINGS SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)CONT. BOTTOM TRACKATTACH W/ 0.167"Ø P.A.F.@ 8" O.C.GRID#4x DOWELS @ 246"#4 @ 24 VERT.EA. FACEMASONRY VENEERSEE ARCH.10" 6"CLR.3"10"CLR.2"(3) #4 CONT.#5 @ 18 TRANSV.PERIMETERFOUNDATION DRAINRE: CIVIL1' - 4"SEE PLANT.O. WALLEL. SEE PLANT.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL6" METAL STUDS@ 1'-4" O.C.4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOUNDATION SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)CONT. BOTTOM TRACKATTACH W/ 0.167"Ø P.A.F.@ 8" O.C.GRID#4x DOWELS @ 246"#4 @ 24 VERT.EA. FACEMASONRY VENEERSEE ARCH.10" 6"CLR.3"10"CLR.2"(3) #4 CONT.#5 @ 18 TRANSV.SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORK#4 @ 12 HORIZ.EACH FACEPERIMETERFOUNDATION DRAINRE: CIVIL1' - 8"6 1/4"MIN.8"CLR.3"T.O. DRAINEL. 99'-10 1/4"B.O. CONCRETEEL. 98'-6"TRENCH DRAINSEE MECH.1/4"/FT.SLOPE6" CONCRETE SLABSEE PLAN#4x @ 122'-0"2'-0"1'-4"11"(3) #5 CONT.CLR.3"10"CLR.3"8"CLR.2"GRIDCLR.1 1/2"CLR.2"6"T.O. SLABEL. 100'-0"T.O. FOOTINGEL. SEE PLAN#4 @ 10 EACH WAYTOP & BOTTOM6" CONCRETE SLAB#4x DOWELS @ 162'-0"2'-0"4" MIN. GRAVELCOMPACTEDSTRUCTURAL FILLSEE SOILS REPORT(3) #4 CONT.#5 @ 18 TRANSV.#4x DOWELS @ 246"(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DFOR SPLICES OFREINFORCEMENT)SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORKSEE PLAN8 3/8"FOOTINGS SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)#4 @ 24 VERT.EA. FACE#4 @ 12 HORIZ.EACH FACEPERIMETERFOUNDATION DRAINRE: CIVILT.O. SLABEL. RE: PLANT.O. FOOTINGEL. RE: PLAN1/2" NON-TRACKINGASPHALT IMPREGNATEDFIBER BOARD (TYP.)HSS COLUMNSEE PLAN5" CONCRETE SLAB ON 4" GRAVEL OVER1'-6" STRUCTURAL COMPACTED FILL (TYP.)RE: FOOTING SCHEDULE1' - 6"SCHEDULERE: FOOTINGCLR.3"AS100SEE PLANT.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(2) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOUNDATION SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)7#4x DOWELS @ 246"CLR.3"10"(3) #4 CONT.#5 @ 18 TRANSV.SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORK1' - 0"PERIMETERFOUNDATION DRAINRE: CIVILT.O. SLABEL. 100'-0"JOIST BEARINGEL. 114'-3 1/2"CONCRETE PAVERSRE: ARCH.1/8" 2"EACHJOISTCONT. BENT PLATE1/4"x3 1/2"8"CONT. L4x4x3/8 W/3/8" STIFFENER PLATEEACH JOIST4" C.M.U. VENEERRE: ARCH.O.W. JOISTSEE PLANT.O. WALLEL. 116'-8"1 1/2" ROOF DECKSEE SCHEDULEINSULATION & RIGIDBY OTHERSCLR.2"EMBED PLATE EP-1@ 2'-8" O.C.(ALIGN W/ O.W. JOISTS)1/4" 9"1/4" 9"EACHJOIST4"8"CLR.1 1/2"8"EMBED PLATE EP-1@ 4'-0" O.C.4"x12"x3/8" WELDPLATE @ 4'-0" O.C.HSS2x2 RAIL POSTSEE ARCH.SEE PLANT.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOUNDATION SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)A.1#5x DOWELS @ 124'-0"6"CLR.3"10"(3) #4 CONT.#5 @ 18 TRANSV.SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORKPERIMETERFOUNDATION DRAINRE: CIVILT.O. SLABEL. 100'-0"T.O. SLABEL. 116'-0"3 1/2" CONCRETEOVER 9/16" FORM DECK3" 9"3/16" 2 @ 12CLR.1 1/2"CONT. EDGEL3 1/2x3x1/4CONT. EMBED L4x4x3/8 W/1/2"Ø x0'-6" H.A.S.@ 1'-0" O.C.STEEL JOISTSEE PLAN3 1/2"T.O. WALLEL. 115'-8 1/2"6" METAL STUDS@ 1'-4" O.C.CONT. BOTTOM TRACKATTACH W/ 0.167"Ø P.A.F.@ 8" O.C.CLR.2"#5 @ 12 VERT.#4 @ 10 HORIZ.1' - 0"T.O. ANGLEEL. 112'-0"4" C.M.U. VENEERRE: ARCH.PROVIDE MASONRYTIES AS REQUIREDCONT. BENT PLATE 3/8"x W/STIFFENER PLATE 3/8"@ 2'-0" O.C. ATTACH W/ (2) 3/4"Ø EPOXY ANCHORS@ 2'-0" O.C. W/6 5/8" MIN. EMBEDMENT.COAT ASSEMBLY W/ASPHALTIC PAINTA1 1/2"5"8"10"6" 3"CLR.3"1' - 6"CLR.3"8"CLR.2"GRIDCLR.1 1/2"4"T.O. SLABEL. 100'-0"T.O. FELEVATOR PITEL. 96'-0"4" CONCRETE SLAB#4x DOWELS @ 162'-0"2'-8"4" MIN. GRAVELCOMPACTEDSTRUCTURAL FILLSEE SOILS REPORT#5 @ 12 TOPEACH WAY#6 @ 8 BOTTOMEACH WAY#4x DOWELS @ 242'-0"(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DFOR SPLICES OFREINFORCEMENT)FOOTINGS SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)1' - 4"3"3"CLR.2"1' - 8"6" METAL STUDS@ 1'-4" O.C.7 5/8"8 3/8"7 5/8"#4 @ 24 VERT.EA. FACE#4 @ 12 HORIZ.EACH FACEB.1SEE PLANT.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(2) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOUNDATION SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)#4x DOWELS @ 246"CLR.3"10"(3) #4 CONT.#5 @ 18 TRANSV.SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORK1' - 0"PERIMETERFOUNDATION DRAINRE: CIVILT.O. SLABEL. 100'-0"8"CONCRETE PAVERSRE: ARCH.CONT. L4x4x3/8 ATTACH TO CONCRETEW/ 3/4"Ø EXP. ANCHORS@ 2'-0" O.C.(6 1/2" MIN. EMBEDMENT)4" C.M.U. VENEERRE: ARCH.O.W. JOISTSEE PLANT.O. WALLEL. 116'-8"1 1/2" ROOF DECKSEE SCHEDULEINSULATION & RIGIDBY OTHERSCLR.1 1/2"CLR.2"EMBED PLATE EP-1@ 4'-0" O.C.4"x12"x3/8" WELDPLATE @ 4'-0" O.C.HSS2x2 RAIL POSTSEE ARCH.1' - 4"SEE PLANT.O. WALLEL. 100'-0"T.O. FOOTINGEL. SEE PLANCLR.1 1/2"CONCRETE SLABSEE PLAN1/2" JOINT MATERIAL6" METAL STUDS@ 1'-4" O.C.(TYP.)4" GRAVELCOMPACTEDSTRUCTURAL FILL.SEE SOILS REPORT(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DRE: SPLICES OFREINFORCEMENT)FOOTINGS SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)CONT. BOTTOM TRACKATTACH W/ 0.167"Ø P.A.F.@ 8" O.C.GRID#4x DOWELS @ 246"#4 @ 24 VERT.EA. FACECLR.3"10"CLR.2"(3) #4 CONT.#5 @ 18 TRANSV.10" 6"10T.O. SLABEL. 100'-0"T.O. FOOTINGEL. SEE PLAN#4 @ 10 EACH WAYTOP & BOTTOM6" CONCRETE SLAB4" MIN. GRAVELCOMPACTEDSTRUCTURAL FILLSEE SOILS REPORT#4x DOWELS @ 246"(3) #5 CONT.TOP & BOTTOM(SEE GEN. NOTE 2DFOR SPLICES OFREINFORCEMENT)SEE CIVIL DRAWINGSFOR SITE PAVINGOR FLATWORKFOOTINGS SHALLBEAR ON UNDISTURBEDNATURAL GRAVEL SOILS(TYP.)8 3/8"7 5/8"1' - 4"CLR.2"CLR.3"SCHEDULERE: FOOTINGSCHEDULERE: FOOTING8" C.M.U.SEE REINF.SCHEDULE ONSHEET S2014" C.M.U. VENEERRE: ARCH.PROVIDE MASONRYTIES AS REQUIREDPERIMETERFOUNDATION DRAINRE: CIVIL#4 @ 24 VERT.EA. FACE#4 @ 12 HORIZ.EACH FACEDRAWN BY:CHECKED BY:SHEET NO:PROJECT NO:DATE:CHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comE N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G NC 2016 CHAMBERLIN ARCHITECTS802 Rood AvenueGrand Junction, CO 81501PHONE: 970-241-0900FAX: 970-243-2430www.lindauerdunn.comC:\Users\JeffGrna\Documents\17.085-PCAF-S17_JeffGrna.rvt5/9/2018 11:54:28 AMS30005/09/1817.085CASTLE CREEK ROADASPEN, COLORADOFOUNDATION SECTIONSPROJECT STATUS: 100% CDJDGFNRASPEN AMBULANCEDISTRICT FACILITYSECTION 1/2" = 1'-0"S3001SECTION 1/2" = 1'-0"S3002SECTION 1/2" = 1'-0"S3005SECTION 1/2" = 1'-0"S3003SECTION 1/2" = 1'-0"S3004SECTION 1/2" = 1'-0"S3006SECTION 1/2" = 1'-0"S3007SECTION 1/2" = 1'-0"S3008SECTION 1/2" = 1'-0"S3009SECTION 1/2" = 1'-0"S30010SECTION 1/2" = 1'-0"S30011NO: ISSUED FOR: DATE: