HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (69).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 033
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 033 Date Created: 9/21/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ClarificationStructuralStructural Steel Clarifications #1
Company Name Contact Name Copies NotesCc:
Chamberlin Architects, Inc. Daniel Gartner 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 9/28/2018
Please see the questions below from FCI's structural steel supplier.
1. Please provide the bottom of roof deck elevations at Grid 1, 4, and 5.9. Currently, using the top of beam elevation and
the joist seat depth per the sections, there is about a 5/8" belly at Grid 4.
2. There is a vertical brace on Grid 1 between G & H, and another on Grid 5.9 between F & G. The anchor bolt
designation on S102 does not call for a vertical brace base plate detail D/S204, but rather calls for a square base plate B
or C/S204. Please confirm that D/S204 is to be used at the base of these columns.
3. Please refer to the attached mark up of base plate type. Please confirm if the dimensions on the drawings are required
or if the added dimensions are acceptable. The added dimensions will better match the changes made to base plate type
D on sheet S204.
4. Per the new anchor bolt detail included in PR-012, the braced frame columns will require 2' of anchor bolt embeddment.
On drawing S-102 the foundation plan, the foundations at Grid 4&A.3 and 4&A.9 call for a 12" thick footing. Please confirm
the anchor bolts at these foundations will require a 24" embeddment, if the 24" embeddment is required, please provide a
new foundation thickness.
Suggestion
Answer Date Answered: 9/25/2018
1. Looking at the model, the bar joist drawings, and keeping the beam at Grid 5.9 as is, it seems that the roof beam
elevations need to change as follows:
Grid 4.9 (125'-4 3/4)
Grid 4 (125'-8)
Grid 3.5 (126'-3 1/4)
Grid 3 (127'-1 1/2)
Grid 1 (130'-3 5/8)
2. Yes, base plate Type D should be used. See attached revised pilasters.
Prolog Manager Printed on: 9/25/2018 FCI_Integration Page 1
Request for Information 033
Detailed, RFIs Grouped by RFI Number
3. The marked up dimensions are acceptable.
4. Footing type D1 has been added (see attached). Anchor bolts may have 1'-9" embedment at this frame.
Prolog Manager Printed on: 9/25/2018 FCI_Integration Page 2
Detailed, RFIs Grouped by RFI Number
Request for Information 033
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 033 Date Created: 9/21/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ClarificationStructuralStructural Steel Clarifications #1
Company Name Contact Name Copies NotesCc:
Chamberlin Architects, Inc. Daniel Gartner 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 9/28/2018
Please see the questions below from FCI's structural steel supplier.
1. Please provide the bottom of roof deck elevations at Grid 1, 4, and 5.9. Currently, using the top of beam elevation and
the joist seat depth per the sections, there is about a 5/8" belly at Grid 4.
2. There is a vertical brace on Grid 1 between G & H, and another on Grid 5.9 between F & G. The anchor bolt
designation on S102 does not call for a vertical brace base plate detail D/S204, but rather calls for a square base plate B
or C/S204. Please confirm that D/S204 is to be used at the base of these columns.
3. Please refer to the attached mark up of base plate type. Please confirm if the dimensions on the drawings are required
or if the added dimensions are acceptable. The added dimensions will better match the changes made to base plate type
D on sheet S204.
4. Per the new anchor bolt detail included in PR-012, the braced frame columns will require 2' of anchor bolt embeddment.
On drawing S-102 the foundation plan, the foundations at Grid 4&A.3 and 4&A.9 call for a 12" thick footing. Please confirm
the anchor bolts at these foundations will require a 24" embeddment, if the 24" embeddment is required, please provide a
new foundation thickness.
Suggestion
Answer Date Answered:
Prolog Manager Printed on: 9/21/2018 FCI_Integration Page 1
1. Looking at the model, the bar joist drawings, and keeping the beam at Grid 5.9 as is, it seems that
the roof beam elevations need to change as follows:
Grid 4.9 (125'-4 3/4)
Grid 4 (125'-8)
Grid 3.5 (126'-3 1/4)
Grid 3 (127'-1 1/2)
Grid 1 (130'-3 5/8)
2. Yes, base plate Type D should be used. See attached revised pilasters.
3. The marked up dimensions are acceptable.
4. Footing type D1 has been added (see attached). Anchor bolts may have 1'-9" embedment at this frame.
Question #3
GROUT1" MIN. NON-SHRINKPLATE THICKNESSRE: DETAILS FORHSS COLUMN
RE: SCHEDULE
BRACED FRAME COLUMN ANCHOR BOLTS
1 1/4"Ø ASTM F1554
GR. 55 (TYP.)2' - 0"4" MIN.GRID
DOUBLE HEAVY
HEX NUTS
5
T DETAILS
SLOPESLOPE(TYP.)3' - 9 1/8"(TYP.)6' - 8 7/8"TOP
STEP
1' - 0"
8"
6"
TOP
STEP
TOP
STEP
T.O. WALL
EL. 109'-8"
ALL
5'-8 1/2"
ING
D
HSS6X6X3/8
(D)
HSS6X6X1/
(C)
1' - 0"6"8"1' - 0"WALL
09'-6"
C
D
3 5/8"
9
S300
15' - 0" 18' - 0"
D
4' - 4 3/8" 10' - 7 5/8"6"6"CONCRETE TIE BEAM
1'-0" WIDE x 1'-0" DEEP
(T.O. TIE BEAM = 99'-4")
Question #4
1
C
0
(TYP.)
2" CLR.
T.O. WALL
EL. 100'-0"
T.O. PILASTER
EL. 99'-4"
P-1, P-1A
(4) #5 VERT.
#3 TIES @ 10
(TYP.)
PROVIDE (4) #5x
DOWELS TO
FOOTING BELOW
8"
8"(1'-0 1/2" @ P-1A)
8"
(1'-8 1/2" @ P-1A)
1' - 4"1' - 4"1' - 0 3/8"8"8"4"8 3/8"DESCRIPTION:
SCALE: DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION:
A.A.D.F.AS NOTED
GRAND JUNCTION, COLORADO
970.242.6804
RAPID CITY, SOUTH DAKOTA
605.355.6804
RFI #3317.085 09/25/18 JDG
Pilaster Revision
S200
SSK-18
3/4" = 1'-0"TYPICAL PILASTER DETAILS
F
5.9
6
9"9"1' - 6"9" 1' - 0 1/2"
1' - 9 1/2"
9" 1' - 4 3/8"10"3"3"6"1' - 4"TOP
STEPT.O. WALL
EL. 100'-2"
T.O. PILASTER
EL. 99'-4"
P-3
(4) #5 VERT.
#3 TIES @ 10
(TYP.)
PROVIDE (4) #5x
DOWELS TO
FOOTING BELOW
8"
T.O. WALL
EL. 100'-0"
(TYP.)
2" CLR.
DESCRIPTION:
SCALE: DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION:
A.A.D.F.AS NOTED
GRAND JUNCTION, COLORADO
970.242.6804
RAPID CITY, SOUTH DAKOTA
605.355.6804
RFI #3317.085 09/25/18 JDG
Pilaster Revision
S200
SSK-19
3/4" = 1'-0"TYPICAL PILASTER DETAILS
11
G.9
0
1' - 4"4 3/8"8"9 1/2" 3" 1' - 1"
T.O. WALL
EL. 100'-0"
T.O. PILASTER
EL. 99'-4"
P-4
(4) #5 VERT.
#3 TIES @ 10
(TYP.)
PROVIDE (4) #5x
DOWELS TO
FOOTING BELOW
8"
(TYP.)
2" CLR.8"8"4"8 3/8"5"1' - 8 1/2"
1' - 0 1/2" 8"1' - 4"DESCRIPTION:
SCALE: DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION:
A.A.D.F.AS NOTED
GRAND JUNCTION, COLORADO
970.242.6804
RAPID CITY, SOUTH DAKOTA
605.355.6804
RFI #3317.085 09/25/18 JDG
Pilaster Revision
S200
SSK-20
3/4" = 1'-0"TYPICAL PILASTER DETAILS
GRID
GRID
T.O. WALL
EL. 100'-0"
T.O. PILASTER
EL. 99'-4"
P-6, P-6A
(4) #5 VERT.
#3 TIES @ 10
(TYP.)
PROVIDE (4) #5x
DOWELS TO
FOOTING BELOW
8"
(1'-1 1/2" @ P-6A)
9"9"
(1'-10 1/2" @ P-6A)
1' - 6"6"3"9"1' - 6"4"1' - 4"DESCRIPTION:
SCALE: DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION:
A.A.D.F.AS NOTED
GRAND JUNCTION, COLORADO
970.242.6804
RAPID CITY, SOUTH DAKOTA
605.355.6804
RFI #3317.085 09/25/18 JDG
Pilaster Revision
S200
SSK-21
3/4" = 1'-0"TYPICAL PILASTER DETAILS
DESCRIPTION:
SCALE: DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION:
A.A.D.F.AS NOTED
GRAND JUNCTION, COLORADO
970.242.6804
RAPID CITY, SOUTH DAKOTA
605.355.6804
RFI #3317.085 09/25/18 JDG
Footing Schedule Revision
S200
SSK-22
FOOTING SCHEDULE
MARK SIZE REINFORCEMENT REMARKS
A 3'-0 x 3'-0 x 0'-10 (4) #4 BOTTOM EACH WAY EQUAL SPACING
B 3'-9 x 3'-9 x 0'-10 (5) #5 BOTTOM EACH WAY EQUAL SPACING
C 5'-0 x 5'-0 x 1'-0 (6) #6 BOTTOM EACH WAY EQUAL SPACING
D 6'-0 x 6'-0 x 1'-0 (7) #6 BOTTOM EACH WAY EQUAL SPACING
D1 6'-0 x 6'-0 x 2'-0 (7) #6 BOTTOM EACH WAY EQUAL SPACING
E 11'-9 x 14'-4 x 1'-6 #5 @ 12 EACH WAY TOP & #6 @ 8 EACH WAY BOTTOM
F 2'-0 x 5'-0 x 0'-10 #4 @ 8 EACH WAY BOTTOM