Request for Information 035
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 035 Date Created: 9/24/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ClarificationStructuralVertical Brace Questions
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ David Hale 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
Question Date Required: 10/1/2018
Please refer to attached.
Below is a list of questions from Midwest Steel for the vertical braces within the project.
1. Vertical brace elevation #3/S202, please confirm the work point for the lower "K" bracing is not centered within the
columns.
2. Vertical brace elevation #4/S202, The columns on each side of the brace are depicted as being a continuous column
from foundation up-to the roof. The plans on S103 show stacked columns on Grid G and are unclear about what is going
on at Grid F. Please clarify how this vertical brace is to be framed. Would it be acceptable to frame the W21x48s at
elevation 115-8 ½ into the columns with a shear tab? (beam reactions are not given.)
3. Please confirm the angle degree of the vertical braces shown in the elevation on S202, are for graphical representation
only and are not to be regarded as the correct angle. (i.e. The work points of the beams/columns are to be held as the
correct "position" for framing of the bracing.)
4. SSK-7 is calling for 1 ½ base plates, whereas A/S203 is calling for the vertical brace work point to be 2" above
concrete. Please confirm the work point of the vertical brace is to be held at the top of the base plate and center of the
column for all braces, and not held at 2" above concrete.
Suggestion
Answer Date Answered: 9/25/2018
1. The work point should be at the column center line.
2. Yes, the W21 may be connected to the side of the continuous column. (28k reaction)
3. Angle adjustments may be made to maintain proper orientations and work points.
4. That is correct.
Prolog Manager Printed on: 9/25/2018 FCI_Integration Page 1
33.57' - 0 1/4"3' - 6 1/8" 3' - 6 1/8"T.O. STEELEL. 126'-10 1/2"T.O. CONCRETEEL. 116'-0"T.O. FDN. WALLEL. 99'-4"T.O. STEELEL. 127'-8"HSS5X5X1/4H S S 5 X5 X1 /4
HSS5X5X5/16HSS5X5X5/16H S S 5 X 5X 5 /1 6
HSS5X5X5/16W18X35W14X2280°67°77°77°S203ATYP.S203BS203CTYP.IG.89' - 7 1/4"4' - 9 5/8" 4' - 9 5/8"T.O. PILASTEREL. 99'-4"T.O. STEELEL. 115'-6"T.O. STEELEL. 126'-7 3/4"W14X22W14X22HSS5X5X1/4H SS 5 X 5 X 1 /4
HSS5X5X5/16H S S 5 X 5 X 5 /1 6
HSS5X5X5/16HSS5X5X5/1666°66°73°73°17°17°24°24°S203ATYP.S203BS203CG.9G10' - 11 3/8"5' - 7 7/16"5' - 3 15/16"W16X31HSS6X6X1/2HSS6X6X5/16HSS5X5X1/4HSS5X5X1/4H S S 5 X 5 X 5 /1 6 HSS5X5X5/16T.O. PILASTEREL. 99'-4"T.O. STEELEL. 115'-3 1/2"T.O. STEELEL. 130'-5 9/16"W16X2670°69°36°36°54°5 4 °S203ES203DS203CS203ATYP.S203B5S3031SSK-13GF14' - 0"7' - 0" 7' - 0"W14X26HSS5X5X1/4HSS5X5X1/4W14X26HSS5X5X5/16H S S 5 X 5 X 5 /1 6
HSS6X6X1/4HSS6X6X1/4T.O. PILASTEREL. 99'-4"T.O. STEELEL. 115'-3 1/2"T.O. STEELEL. 124'-6 3/8"S203ATYP.S203BS203CA.910' - 7 5/8"5' - 3 13/16"5' - 3 13/16"T.O. STEELEL. 125'-7 7/8"T.O. STEELEL. 115'-3 1/2"T.O. FOOTINGEL. 99'-4"W16X31HSS5X5X1/4H S S 5 X 5 X 1 /4
W18X35HSS5X5X5/16H S S 5X 5 X 5 /1 6HSS6X6X3/8HSS6X6X3/819°19°71°71°6 3 °63°27°27°S203ATYP.S203BS203C19' - 1 1/8"4' - 6 9/16" 4' - 6 9/16"W14X22HSS5X5X5/16H S S 5 X 5 X 5 /1 6HSS5X5X3/8HSS5X5X3/8T.O. PILASTEREL. 115'-8 1/2"T.O. STEELEL. 129'-10"T.O. STEELEL. 131'-0 3/16"17°19°8 0 °64°S203ATYP.S203BDRAWN BY:CHECKED BY:SHEET NO:PROJECT NO:DATE:CHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comE N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G NC 2016 CHAMBERLIN ARCHITECTS802 Rood AvenueGrand Junction, CO 81501PHONE: 970-241-0900FAX: 970-243-2430www.lindauerdunn.comC:\Users\JeffGrna\Documents\17.085-PCAF-S17_JeffGrna.rvt8/22/2018 9:02:21 AMS20207/16/1817.085CASTLE CREEK ROADASPEN, COLORADOBRACED FRAMEDETAILSPROJECT STATUS: 100% CDJDGFNRASPEN AMBULANCEDISTRICT FACILITY 1/4" = 1'-0"BRACED FRAME #1 1/4" = 1'-0"BRACED FRAME #2 1/4" = 1'-0"BRACED FRAME #3 1/4" = 1'-0"BRACED FRAME #4 1/4" = 1'-0"BRACED FRAME #5 1/4" = 1'-0"BRACED FRAME #6NO: ISSUED FOR: DATE:Question #1Question #2
VARIESGRIDT.O. FOUNDATIONEL. SEE PLANGROUT1"2"HSS BRACE(SLOT @ GUSSET)SEE ELEVATIONGUSSET PLATE 5/8"1/4 51/4 51/4"HSS COLUMNRE: PLAN3/4"Ø ERECTIONBOLTBASE PLATESEE TYP. BASEPLATE DETAILSWORK POINT2"MIN.1' - 4"10"T.O. BEAMEL. RE: PLAN(TYP.)2"CENTERLINEBEAMW.F. BEAMRE: PLAN3/8" STIFFENER PLATEEACH SIDE OF WEBWORK POINTGUSSET PLATE 5/8"3/4"Ø ERECTIONBOLT (TYP.)1/4 51/4 5TYP.1/41/4HSS BRACE(SLOT @ GUSSET)SEE ELEVATION(TYP.)MIN.1' - 0"MIN.1' - 0"MIN.8 1/2"1'-3" MIN.1'-0" MIN.RE: ELEVATIONSGRID1/4"1/4"1/4" 4"TYP.2"GUSSET PLATE 5/8"3/4"Ø ERECTIONBOLTW.F. BEAMRE: PLANCENTER BOLT GROUPSON BEAM CENTERLINEWORK POINTHSS COLUMNRE: PLANGRID1/4"1/4"1/4" 4"TYP.GUSSET PLATE 5/8"3/4"Ø ERECTIONBOLTW.F. BEAMRE: PLANCENTER BOLT GROUPSON BEAM CENTERLINEWORK POINTHSS COLUMNRE: PLAN2"1'-0" MIN.1'-3" MIN.RE: ELEVATIONHSS BRACERE: ELEVATION(TYP.)2"CENTERLINEBEAMWORK POINTGUSSET PLATE 5/8"3/4"Ø ERECTIONBOLT (TYP.)1/4 41/4 4TYP.HSS BRACE(SLOT @ GUSSET)SEE ELEVATION(TYP.)MIN.8"MIN.8"GRID1/4"1/4" 4"TYP.GUSSET PLATE 5/8"3/4"Ø ERECTIONBOLTHSS BEAMRE: PLANWORK POINTHSS COLUMNRE: PLAN(M IN.)2"1'-0" MIN.RE: ELEVATIONHSS BRACERE: ELEVATION1'-0" MIN.1/4"L5x5x3/8 x0'-5"DRAWN BY:CHECKED BY:SHEET NO:PROJECT NO:DATE:CHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comE N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G NC 2016 CHAMBERLIN ARCHITECTS802 Rood AvenueGrand Junction, CO 81501PHONE: 970-241-0900FAX: 970-243-2430www.lindauerdunn.comC:\Users\JeffGrna\Documents\17.085-PCAF-S17_JeffGrna.rvt8/22/2018 9:02:24 AMS20307/16/1817.085CASTLE CREEK ROADASPEN, COLORADOBRACED FRAMESECTIONSPROJECT STATUS: 100% CDJDGFNRASPEN AMBULANCEDISTRICT FACILITYDETAIL 1" = 1'-0"S203ADETAIL 1" = 1'-0"S203BDETAIL 1" = 1'-0"S203CDETAIL 1" = 1'-0"S203DDETAIL 1" = 1'-0"S203EDETAIL 1" = 1'-0"S203FNO: ISSUED FOR: DATE:Question #4