Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (80).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 044 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 044 Date Created: 10/5/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationArchitecturalRoof Walkway Pads Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 10/12/2018 Per specification section 075423 2.7 A, flexible walkway pads are to be installed on the roof. However, roof plan A641 does not show and walkway pads to be installed. Please confirm no walkway pads are needed for the roof on this project. Suggestion Answer Date Answered: 10/25/2018 Per the 10/23/18 OAC Meeting, no walkway pads will be required. Sam Meeks 10/25/18 Prolog Manager Printed on: 10/25/2018 FCI_Integration Page 1