HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (82).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 046 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 046 Date Created: 10/10/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationStructuralSteel Material Clarification Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 10/17/2018 1. The elevator guiderail columns are called out as a HSS10x3x5/16. Our material supplier has only HSS10x3x¼". Would this by chance be acceptable? (1/4" wall thickness in lieu of 5/16"?) 2. On sheet S104, there is a W18x40 on Grid 4, that extends from A.9 and then past Grid E. This requires MSW to try and find a 65-0 piece of material. To locate this length, we would have to get in a mill rolling which may result in a delay of getting this beam to the site. Please confirm if there may be an alternate means of framing the roof at this beam to separate then 65-0 beam length into two separate pieces? Suggestion Answer Date Answered: 10/22/2018 1. HSS10x3x1/4 will not work. Can HSS10x3x3/8 be obtained? 2. Yes, we can splice the W18x40 3'-6 west of Grid D. Prolog Manager Printed on: 10/22/2018 FCI_Integration Page 1