HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (87).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 051 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 051 Date Created: 10/26/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationStructuralF-6 Pilaster Rebar Placement Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Chamberlin Architects, Inc. Daniel Gartner 1 Question Date Required: 11/2/2018 Please refer to attached. During the footing construction at approximately grids 6 & F, the (4) #5 bars for the pilaster P3 were inadvertently centered on gridline 6 rather than gridline 5.9 (see attached sketch). Per conversation between Brian Young & Frank Rinaldi it is acceptable to drill & epoxy (4) new #5 bars in the correct place. RE 500 will need to be used with 7" embedment. Suggestion Answer Date Answered: 10/26/2018 This RFI is for record only. No response is required. Prolog Manager Printed on: 10/26/2018 FCI_Integration Page 1 F 5.9 9"9"1' - 6"9" 9" 1' - 6" 9" 1' - 4 3/8"10"3"3"6"1' - 4"TOP STEPT.O. WALL EL. 100'-2" T.O. PILASTER EL. 99'-4" P-3 (4) #5 VERT. #3 TIES @ 10 (TYP.) PROVIDE (4) #5x DOWELS TO FOOTING BELOW 8" T.O. WALL EL. 100'-0" (TYP.) 2" CLR. 6 ROVIDE (4) #5x 8" I.9 J F 5.9 6 9" 9"1' - 6"9" 1' - 0 1/2" 1' - 9 1/2" 9" 1' - 4 3/8"10" 3" 3"6"1' - 4"TOP STEPT.O. WALL EL. 100'-2" T.O. PILASTER EL. 99'-4" P-3 (4) #5 VERT. #3 TIES @ 10 (TYP.) PROVIDE (4) #5x DOWELS TO FOOTING BELOW 8" T.O. WALL EL. 100'-0" (TYP.) 2" CLR.centered on grid 6 rather than 5.9