Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (90).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 053 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 053 Date Created: 11/1/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationCivilNortheast Retaining Wall Snow fence Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 11/8/2018 Please refer to attached. Per a note on drawing C-102, snow fence is to be installed on the new retaining wall at the northeast corner of the parking lot to match the existing. Details are not provided as to how the snow fence is to be fabricated or installed. Please provide details for the fabrication and installation of the new snow fence on the retaining wall at the northeast corner of the parking lot. Suggestion Answer Date Answered: 11/20/2018 See the attached detail for the design of the snow fence/guardrail (copied from the 2010 Hospital improvement plans off of which the existing fence was built). This guardrail should be installed only along the north south portion of the wall and not along the east west portion (see mark ups on attached sheet C-112). The pictures attached to this RFI show a drop off behind the wall at the west corner of the east-west section. This area should be graded down (from TBC) at a 4:1 slope as we have highlighted in the attached copy of sheet C- 112. Prolog Manager Printed on: 11/20/2018 FCI_Integration Page 1 Scanned by CamScanner WV IV compact compactcompactcompact compact compact compact compact DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE:C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Overall.dwg9/25/2018 11:21 AM592 HIGHWAY 133 Carbondale, Colorado 81623 PH 970.340.4130 F 866.876.5873 CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N ASPEN AMBULANCE DISTRICT FACILITY CASTLE CREEK RD ASPEN, COLORADO PARKING LOT GRADING PLAN PROJECT STATUS: 100% CD SWW RBG C-1122017-44 9/25/2018 1 PR#1 7/18/18 2 PR#011 9/10/18                         PR011 This area should be graded down at 4:1 as shown here. Extend guard rail to this point