Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (93).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 056 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 056 Date Created: 11/5/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationArchitecturalPR-10 Exterior Wall Rigid Insulation Z-Girt Type & Spacing Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 11/12/2018 Per PR-10, the exterior continuous insulation was revised to foil-faced 2.5" polyisocyanurate board insulation with sealed and taped seams. The foil-facing (sealed and taped) will be the weather barrier for the exterior. Per conversations with Chamberlin Architects, thermally broken z-girts (oriented per A001) will be installed at 24" o.c. (in lieu of 12" o.c.). The metal panels will attach to these z-girts. This RFI is being issued for clarification and documentation only. Suggestion Answer Date Answered: This RFI is for confirmation only. No response is required. Prolog Manager Printed on: 11/5/2018 FCI_Integration Page 1