HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (93).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 056
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 056 Date Created: 11/5/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationArchitecturalPR-10 Exterior Wall Rigid Insulation Z-Girt Type &
Spacing
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 11/12/2018
Per PR-10, the exterior continuous insulation was revised to foil-faced 2.5" polyisocyanurate board insulation with sealed
and taped seams. The foil-facing (sealed and taped) will be the weather barrier for the exterior. Per conversations with
Chamberlin Architects, thermally broken z-girts (oriented per A001) will be installed at 24" o.c. (in lieu of 12" o.c.). The
metal panels will attach to these z-girts. This RFI is being issued for clarification and documentation only.
Suggestion
Answer Date Answered:
This RFI is for confirmation only. No response is required.
Prolog Manager Printed on: 11/5/2018 FCI_Integration Page 1