Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (97).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 060 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 060 Date Created: 11/15/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationArchitecturalStructural Steel Finish Clarifications Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 11/22/2018 FCI has the following questions regarding the finish of structural steel both at the Trash enclosure structure and the main building: 1. Midwest Steel has fabricated all of the steel members for the trash enclosure and they have all been galvanized. Please confirm it is acceptable for all of the steel members within the steel enclosure to be hot dipped galvanized. 2. Please advise if any of the steel members for the trash enclosure will be required to be painted. All of the steel members are currently galvanized, please provide preparation requirements to paint over galvanizing. 3. Per PR-010 the exterior handrails have been changes from a galvanized finish to a primed and painted finish. The specifications do not call for a certain prep of the handrails prior to painting. Midwest Steel can provide a SP6 Surface Prep (Sand Blasted) finish prior to the primer or Midwest Steel can provide a SP2 Surface Prep (Hand Tool Clean) prior to the primer. Please clarify is to which prep type will be required, the SP2 prep is a less expensive option if acceptable. 4. Please confirm the handrail at the balcony on the south side of the building is to be primed and painted and galvanizing is not required. 5. Please confirm the exterior stairs at the northwest corner of the new building are to be completely galvanized. Suggestion Answer Date Answered: 12/6/2018 1. ALL STEEL MEMBERS WITHIN THE TRASH ENCLOSURE MAY BE GALVANIZED. 2. REFER TO SHEET A653 FOR STEEL MEMBERS TO BE PAINTED. PROVIDE THE FOLLOWING PAINT SYSTEM FOR STEEL MEMBERS THAT HAVE BEEN GALVANIZED: PRIME COAT: ALKYD ANTI-CORROSIVE, QUICK DRY; SW PRO-CRYL UNIVERSAL PRIMER, B66-310 SERIES, AT 2.0 TO 4.0 MILS DRY, PER COAT INTERMEDIATE COAT: EPOXY, TWO-COMPONENT, PIGMENTED, MATCHING TOPCOAT; SW MACROPOXY 646-100 EPOXY, B58-600 SERIES, AT 5.0 TO 10.0 MILS DRY, PER COAT TOPCOAT: POLYURETHANE, TWO-COMPONENT, PIGMENTED, SEMI-GLOSS; Prolog Manager Printed on: 12/6/2018 FCI_Integration Page 1 Request for Information 060 Detailed, RFIs Grouped by RFI Number SW HI-SOLIDS POLYURETHANE 250, B65 SERIES, AT 2.0 TO 3.0 MILS DRY, PER COAT 3. SP2 PREP IS ACCEPTABLE. 4. CONFIRMED. 5. CONFIRMED. REFER TO PAINT SYSTEM LISTED UNDER ITEM 2 ABOVE FOR ITEMS TO BE PAINTED. 2018.12.06 - JONATHAN WEST Prolog Manager Printed on: 12/6/2018 FCI_Integration Page 2