Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (98).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 061 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 061 Date Created: 11/15/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationStructuralBuilding Structural Steel Additions Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 11/22/2018 Please refer to attached. Per the reviewed structural steel shop drawings for the building, a total of six structural members have been added to the design. Due to the spacing of the joists a total of 5 joists were added so there was not any spacing that exceeded 2'-9 1/2". Sheet E101 in the Midwest Steel shop drawings also includes a note from Lindauer Dunn to add (1) W8x10 beam on the east side of gridline J at the north end of the building. Please confirm that that these structual memebers have been added. Suggestion Answer Date Answered: CONFIRMED. 2018.12.11 - JONATHAN WEST Prolog Manager Printed on: 12/11/2018 FCI_Integration Page 1 PROVIDE SHOP PRIMED Approver: Please verify Approver: Please verify all clouded notes by FCI ACCEPTABLE ACCEPTABLE ACCEPTABLE ACCEPTABLE ACCEPTABLE ACCEPTABLE ARCHITECT TO VERIFY.4'-4 7/16"W8x10 (EL: 112'-10 1/2) ADD JOIST AND RE-SPACE. DO NOT EXCEED 2'-9 1/2" (TYP.) ADD JOIST AND RE-SPACE. DO NOT EXCEED 2'-9 1/2" (TYP.) THAT WILL BE OKAY 2'-9 2'-9 2'-9 1/2" MAX.