Request for Information 061
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 061 Date Created: 11/15/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationStructuralBuilding Structural Steel Additions
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 11/22/2018
Please refer to attached.
Per the reviewed structural steel shop drawings for the building, a total of six structural members have been added to the
design. Due to the spacing of the joists a total of 5 joists were added so there was not any spacing that exceeded 2'-9
1/2". Sheet E101 in the Midwest Steel shop drawings also includes a note from Lindauer Dunn to add (1) W8x10 beam on
the east side of gridline J at the north end of the building.
Please confirm that that these structual memebers have been added.
Suggestion
Answer Date Answered:
CONFIRMED.
2018.12.11 - JONATHAN WEST
Prolog Manager Printed on: 12/11/2018 FCI_Integration Page 1
PROVIDE SHOP PRIMED
Approver:
Please verify
Approver: Please verify all
clouded notes by FCI
ACCEPTABLE
ACCEPTABLE
ACCEPTABLE
ACCEPTABLE
ACCEPTABLE
ACCEPTABLE
ARCHITECT TO
VERIFY.4'-4 7/16"W8x10 (EL: 112'-10 1/2)
ADD JOIST AND
RE-SPACE. DO NOT
EXCEED 2'-9 1/2"
(TYP.)
ADD JOIST AND
RE-SPACE. DO NOT
EXCEED 2'-9 1/2"
(TYP.)
THAT WILL BE
OKAY
2'-9 2'-9
2'-9 1/2" MAX.